Incident Response
Purpose
Restore service fast, communicate clearly while doing it, and convert every incident
into durable fixes. The skill covers severity classification, the stabilize-first
playbook, the communication cadence, and the blameless postmortem with tracked
corrective actions.
When to Use / When NOT to Use
Use when:
- Production is degraded, down, or breaching SLOs ("the pager just fired", "we
have an incident").
- A postmortem is needed after an incident or severe near-miss.
- An emergency code fix must ship with a fast-track review.
Do NOT use when:
- The problem is pre-production only (CI broken, staging flaky) — fix via
ci-cd; save the incident process for production.
- You are adding telemetry after an incident as a general improvement — that is
observability; the postmortem action items reference it.
Prerequisites & Assumptions
- On-call rotation exists with escalation paths and a paging tool.
- SLOs and dashboards exist per service (
observability); without them,
severity is judged by user impact alone.
- The postmortem is blameless by policy: systems and process fail, people do not
get blamed for system behavior.
Step-by-Step Workflow
- Triage — classify severity on impact: S1 = full outage or data
loss/corruption risk; S2 = major degradation (SLO burning fast); S3 = minor,
workaround exists. When unsure, classify high and downgrade later.
- Declare and staff — open the incident channel, assign Incident Commander
(IC), Communications Lead, and Operations Lead; the IC coordinates, responders
execute — the person fixing should not also be the one writing updates.
- Stabilize before root-causing — fastest safe mitigation first: rollback
(
ci-cd rollback path), feature-flag off, failover, shed load. Root cause
hunting happens after user impact stops growing.
- Communicate on cadence — internal updates every 30 min (S1/S2) with
status, impact, next check-in time; external status page updates for S1.
- Resolve — declare mitigated when impact stops (error budget stops
burning), resolved when service is normal; verify with the same metrics that
detected the incident.
- Postmortem within 5 business days — timeline from logs/metrics, impact
quantified, root cause + contributing factors, action items each with an owner
and a due date; blameless tone; reviewed in a meeting, not just a document.
- Track actions to done — every action item is an issue in the backlog;
the postmortem is closed only when actions land or are consciously accepted.
Enterprise Rules & Standards (MUST / MUST NOT)
- MUST mitigate before diagnosing; restoring service outranks explanation.
- MUST assign a single Incident Commander per incident; command and
execution roles are separate.
- MUST write the postmortem for every S1/S2 within 5 business days,
blameless, with quantified impact (duration, requests affected, SLO budget
burned).
- MUST attach an owner and due date to every action item; unowned actions
are deleted, not filed for decoration.
- MUST test rollback paths quarterly so mitigation is real when needed.
- SHOULD use a standard timeline format (UTC timestamps, detection →
mitigation → resolution) so multiple incidents aggregate.
- MUST NOT blame individuals in postmortems; "why did the system allow
this" replaces "who did this".
- MUST NOT treat emergency fixes as gate-exempt — the fast path still
includes tests and review, just shorter (
git-workflow).
- MUST NOT declare resolution without verifying recovery on the detecting
dashboards.
Examples
Good — postmortem skeleton:
# Postmortem 2026-10-14: Order API 5xx spike (S2)
Impact: 41 minutes, p99 4.2s→9.8s, 0.7% of requests failed,
22% of monthly error budget burned.
Timeline (UTC): 09:12 deploy v1.9.0 · 09:26 alert fired ·
09:31 IC declared · 09:44 rollback started · 09:53 mitigated · 10:11 resolved.
Root cause: connection-pool migration exhausted Postgres connections
under retry storm (see contributing factors: no pool alert, retries unbounded).
Actions:
- [ ] Add pool saturation alert (owner: @ana, due 2026-10-21)
- [ ] Bound client retries with backoff+jitter (owner: @raj, due 2026-10-28)
Bad — the blame game:
Root cause: Ana deployed on Friday without telling anyone. She will be more
careful. No action items needed.
Why it fails: blames a person, misses the two system fixes (pool alerting,
retry bounds), and guarantees the same failure recurs with a different name in
the report.
Checklist
Common Pitfalls
- Hero mode — one engineer doing IC + comms + fixes; roles exist precisely
to prevent this.
- Root-cause rabbit holes — debugging while users bleed; stabilize first.
- Heroic postmortems — "we fixed it, no actions needed"; every S1/S2 yields
at least one systemic action item.
- Action-item graveyard — actions filed and forgotten; review closure at
ops reviews.
References
1---2name: incident-response3description: 'Runs production incident response — severity triage, stabilization before root-causing, structured communication, and blameless postmortems with tracked actions. Trigger with "we have an incident", "write the postmortem", or "the pager just fired".'4metadata:5 source: https://skillmd.com/skills/pnguyen215/incident-response6---78# Incident Response910## Purpose1112Restore service fast, communicate clearly while doing it, and convert every incident13into durable fixes. The skill covers severity classification, the stabilize-first14playbook, the communication cadence, and the blameless postmortem with tracked15corrective actions.1617## When to Use / When NOT to Use1819Use when:2021- Production is degraded, down, or breaching SLOs ("the pager just fired", "we22 have an incident").23- A postmortem is needed after an incident or severe near-miss.24- An emergency code fix must ship with a fast-track review.2526Do NOT use when:2728- The problem is pre-production only (CI broken, staging flaky) — fix via29 `ci-cd`; save the incident process for production.30- You are adding telemetry _after_ an incident as a general improvement — that is31 `observability`; the postmortem action items reference it.3233## Prerequisites & Assumptions3435- On-call rotation exists with escalation paths and a paging tool.36- SLOs and dashboards exist per service (`observability`); without them,37 severity is judged by user impact alone.38- The postmortem is blameless by policy: systems and process fail, people do not39 get blamed for system behavior.4041## Step-by-Step Workflow42431. **Triage** — classify severity on impact: S1 = full outage or data44 loss/corruption risk; S2 = major degradation (SLO burning fast); S3 = minor,45 workaround exists. When unsure, classify high and downgrade later.462. **Declare and staff** — open the incident channel, assign Incident Commander47 (IC), Communications Lead, and Operations Lead; the IC coordinates, responders48 execute — the person fixing should not also be the one writing updates.493. **Stabilize before root-causing** — fastest safe mitigation first: rollback50 (`ci-cd` rollback path), feature-flag off, failover, shed load. Root cause51 hunting happens after user impact stops growing.524. **Communicate on cadence** — internal updates every 30 min (S1/S2) with53 status, impact, next check-in time; external status page updates for S1.545. **Resolve** — declare mitigated when impact stops (error budget stops55 burning), resolved when service is normal; verify with the same metrics that56 detected the incident.576. **Postmortem within 5 business days** — timeline from logs/metrics, impact58 quantified, root cause + contributing factors, action items each with an owner59 and a due date; blameless tone; reviewed in a meeting, not just a document.607. **Track actions to done** — every action item is an issue in the backlog;61 the postmortem is closed only when actions land or are consciously accepted.6263## Enterprise Rules & Standards (MUST / MUST NOT)6465- **MUST** mitigate before diagnosing; restoring service outranks explanation.66- **MUST** assign a single Incident Commander per incident; command and67 execution roles are separate.68- **MUST** write the postmortem for every S1/S2 within 5 business days,69 blameless, with quantified impact (duration, requests affected, SLO budget70 burned).71- **MUST** attach an owner and due date to every action item; unowned actions72 are deleted, not filed for decoration.73- **MUST** test rollback paths quarterly so mitigation is real when needed.74- **SHOULD** use a standard timeline format (UTC timestamps, detection →75 mitigation → resolution) so multiple incidents aggregate.76- **MUST NOT** blame individuals in postmortems; "why did the system allow77 this" replaces "who did this".78- **MUST NOT** treat emergency fixes as gate-exempt — the fast path still79 includes tests and review, just shorter (`git-workflow`).80- **MUST NOT** declare resolution without verifying recovery on the detecting81 dashboards.8283## Examples8485Good — postmortem skeleton:8687```markdown88# Postmortem 2026-10-14: Order API 5xx spike (S2)8990Impact: 41 minutes, p99 4.2s→9.8s, 0.7% of requests failed,9122% of monthly error budget burned.92Timeline (UTC): 09:12 deploy v1.9.0 · 09:26 alert fired ·9309:31 IC declared · 09:44 rollback started · 09:53 mitigated · 10:11 resolved.94Root cause: connection-pool migration exhausted Postgres connections95under retry storm (see contributing factors: no pool alert, retries unbounded).96Actions:9798- [ ] Add pool saturation alert (owner: @ana, due 2026-10-21)99- [ ] Bound client retries with backoff+jitter (owner: @raj, due 2026-10-28)100```101102Bad — the blame game:103104```markdown105Root cause: Ana deployed on Friday without telling anyone. She will be more106careful. No action items needed.107```108109Why it fails: blames a person, misses the two system fixes (pool alerting,110retry bounds), and guarantees the same failure recurs with a different name in111the report.112113## Checklist114115- [ ] Severity assigned on impact; incident channel + IC named.116- [ ] Mitigation applied before root-cause work; mitigation type recorded117 (rollback/flag/failover).118- [ ] Updates sent on cadence with next-update time; status page updated for S1.119- [ ] Resolution verified on the dashboards that detected the incident.120- [ ] Postmortem written ≤ 5 business days, blameless, impact quantified.121- [ ] Every action item has an owner, due date, and issue link.122123## Common Pitfalls124125- **Hero mode** — one engineer doing IC + comms + fixes; roles exist precisely126 to prevent this.127- **Root-cause rabbit holes** — debugging while users bleed; stabilize first.128- **Heroic postmortems** — "we fixed it, no actions needed"; every S1/S2 yields129 at least one systemic action item.130- **Action-item graveyard** — actions filed and forgotten; review closure at131 ops reviews.132133## References134135- Google SRE — Incident Management: https://sre.google/sre-book/managing-incidents/136- Google SRE — Postmortems: https://sre.google/sre-book/postmortem-culture/137- PagerDuty Incident Response Guide: https://response.pagerduty.com/