Thermal Overload Mitigation

Senior power-engineer playbook for overloaded lines and transformers. Use whenever power-flow or contingency studies show loading above ratings — including escalations from a tool skill where branch loading exceeds 100% of its rating. Triggers on "line overloaded", "transformer above rating", "relieve congestion", or "redispatch to unload". Gives an operationally credible sequence of redispatch, topology, phase-shifter, and reinforcement actions rather than only flagging the overload.

power-agent 2001eda 2.0 KB Updated

File contents

power-agent/powerskills/tree/main/powerskills-engineering/skills/thermal-overload-mitigation commit 2001eda144

Frequently asked questions

npx skillmds@latest add power-agent/thermal-overload-mitigation