hyperjump-eval
HyperJump: Accelerating HyperBand via Risk Modelling — Mendes et al. (2021) (arXiv:2108.02479, 2021)
What this evaluates
Evaluates the optimization quality and time efficiency of hyperparameter search algorithms by comparing the test error rate of recommended configurations against wall-clock time across neural architecture and traditional ML benchmarks. It measures how quickly each optimizer converges to near-optimal configurations under sequential and parallel deployment settings.
Datasets
- NATS-Bench — total 15625; splits: test (-1)
- LIBSVM Covertype — total ?; splits: train (-1)
Metrics
test_error_rate(primary) — range: [0, 1]- 1.0 minus the classification accuracy on the held-out test set.
wall_clock_time— range: seconds- Total elapsed seconds from optimization start to configuration recommendation, including training and overhead.
Input / output format
Input: Hyperparameter configuration vectors (e.g., NN topology connections, SVM kernel/gamma/C) and a computational budget (epochs for NATS, training set size for LIBSVM).
Output: Recommended hyperparameter configuration(s) and their corresponding test error rate.
Scoring recipe
def compute_metrics(predictions, gold_labels, start_time, end_time):
accuracy = sum(predictions == gold_labels) / len(gold_labels)
test_error_rate = 1.0 - accuracy
wall_clock_time = end_time - start_time
return {'test_error_rate': test_error_rate, 'wall_clock_time': wall_clock_time}
Common pitfalls
- Confusing the computational budget (epochs or training set size) with actual wall-clock time; speed-up comparisons must be based on elapsed time, not budget units.
- Assuming the global optimum is known for all benchmarks; only NATS-Bench has an exhaustive evaluation of all 15,625 configurations, while LIBSVM Covertype's optimum is unknown.
- Comparing parallel-only baselines (e.g., ASHA) against sequential methods without adjusting for worker pool size, which skews wall-clock time comparisons.
Evidence (verbatim from paper)
Figure 2 reports the average loss (i.e., the test error rate) and corresponding standard deviation in the shaded areas as a function of the wall clock time (i.e., training and recommendation time).
Citation
@misc{mendes2021hyperjump,
title={HyperJump: Accelerating HyperBand via Risk Modelling},
author={Mendes et al. (2021)},
year={2021},
note={arXiv:2108.02479}
}
- arXiv: 2108.02479