Analyzing Contradictions (Phase 4)
Target: $ARGUMENTS
Phase 4 of the GTM pipeline. Depends on Phase 3. Reviews all prior phase outputs for internal contradictions, unresolved tensions, and gaps that could undermine the GTM strategy.
Mode Awareness
Read config/mode.md before starting:
concise— Top 3 contradictions + top 5 objections (brief)detailed— Full contradiction register, root cause analysis, resolution roadmapconservative— Surface all contradictions regardless of severity; prefer resolution over ignoringambitious— Frame contradictions as opportunities; propose bold resolutions
Inputs
results/phase-0/capability-profile.mdresults/phase-1a/competitor-map.mdresults/phase-1b/market-analysis.mdresults/phase-2/pmf-assessment.mdresults/phase-3/gtm-strategy.mdconfig/mode.md— Style and approach settings
Contradiction Detection Areas
- Phase 0 vs Phase 3: Does the GTM strategy require capabilities the product lacks?
- Phase 1A vs Phase 3: Does the channel strategy ignore how competitors already dominate those channels?
- Phase 1B vs Phase 2: Does the PMF score contradict market sizing assumptions?
- Phase 2 vs Phase 3: Does the segment prioritization conflict with PMF evidence?
- Internal Phase 3: Are ICP definitions consistent with channel strategy?
Workflow
- Read all prior phase outputs systematically
- Identify cross-phase tensions — Claims or recommendations that conflict
- Identify intra-phase gaps — Missing evidence, unsupported assumptions
- Draft objection list — What will skeptical investors or buyers say?
- Propose resolutions — How should each contradiction be addressed?
- Validate against criteria — Check
config/validation_criteria.mdPhase 4 gates
Output
Write to results/phase-4/:
contradiction-analysis.md
# Contradiction Analysis
## Cross-Phase Contradictions
### Contradiction 1: [Short description]
- Phases involved: [e.g. Phase 0 vs Phase 3]
- Tension: [What conflicts with what]
- Root cause: [Why this contradiction exists]
- Resolution: [Recommended fix or clarification needed]
- Priority: [High/Medium/Low]
## Assumption Gaps
| Assumption | Phase | Evidence | Gap |
|-----------|-------|----------|-----|
| [assumption] | [phase] | [present/missing] | [what's needed] |
## Objection Register
### Investor Objections
1. "[Objection]" — Response: [recommended response]
### Buyer Objections
1. "[Objection]" — Response: [recommended response]
## Summary
[Overall assessment: pipeline integrity score H/M/L, key blockers before Phase 5]
Rules
- Every contradiction must have a recommended resolution or explicit escalation
- Objections must be phrased as a skeptic would actually say them
- Do not suppress contradictions to protect the overall thesis — honesty here improves Phase 5