Quant Risk Modeling
Build a risk measure — VaR, CVaR, drawdown, stress — with explicit distributions, assumptions, and historical validation. A risk number without context is misleading.
When to use
- The user needs a risk metric for a portfolio or strategy.
- A backtest needs a drawdown / stress profile.
- A strategy needs a position-size or leverage cap based on risk.
Process
1. Define the risk object
State exactly what needs measurement: portfolio-level P&L, a single factor, a strategy, an instrument. Time horizon (1-day / 10-day / monthly) matters.
Completion criterion: risk object and horizon named; measurement unit (absolute / % / $) specified.
2. Choose distribution / model
- Parametric: Normal, Student-t, GARCH, multivariate Normal / t.
- Non-parametric: historical simulation, bootstrap.
- Scenario / stress: specific shocks (rates +200bp, equity crash 2008).
- Credit / default: CVaR for defaults, PD/LGD/EAD framework.
Name the choice and why it fits the regime (e.g. "t-distribution for fat tails").
Completion criterion: model named; assumption (distribution, correlation, independence) listed.
3. Compute
Run with explicit parameters. Report:
- VaR at chosen confidence (e.g. 95%, 99%).
- CVaR / ES (expected shortfall) — more stable than VaR.
- Drawdown: max, average, recovery time.
- Stress: impact of named historical or hypothetical shock.
Completion criterion: all requested measures present with exact parameters.
4. Validate
- Backtest coverage: does VaR 95% cover ~95% of out-of-sample days? If not, recalibrate.
- Stress test: does the model predict known historical losses within a factor?
- Stability: does the risk measure jump wildly on small data changes?
Completion criterion: out-of-sample coverage or stability check completed; discrepancy addressed.
5. Deliver
Markdown artifact: risk definition, model, measures, validation, and a note on what the number means operationally (e.g. "VaR 99% = $1.2M; expected loss beyond is CVaR 99% = $2.5M").
Completion criterion: deliverable includes measures, validation, and an operational interpretation.