Planning Implementation
Break a validated spec or clear task into ordered implementation work, acceptance criteria, dependencies, and verification checkpoints.
For coding-related work, load engineering-principles before this skill. Plans
should preserve its defaults for boundaries, validation, tests, tooling, and
simple implementation.
Planning Pipeline
This skill is part of a scalable planning pipeline. Each step is optional depending on work size.
engineering-principles (for coding-related work)
-> idea-sharpening (if the idea is vague)
-> brainstorming (if spec or design is needed)
-> planning-implementation (you are here)
-> high-level-testing-strategy (if proof strategy is unclear)
-> when-and-how-to-run-parallel-agents (if work may fan out)
-> incremental-implementation (soft next execution loop)
-> executing-plans-with-subagents (if delegating bounded tasks)
-> verification-before-completion (before completion claims)
- Tiny (typo, single-file fix): skip all and code directly.
- Small (obvious small change in known codebase): quick inline plan, then code.
- Moderate (medium-sized feature in several files): brainstorming, then this skill.
- Big (vague idea and/or big/multi-feature): full pipeline.
Planning commonly recommends implementation workflow next, but the transition is a soft handoff. Stop after planning when the human or orchestrator needs to review, defer, split, or delegate the work.
When to Use
- You have a spec or clear requirements that need breaking into concrete steps
- A task feels too large or vague to start
- Work needs to be parallelized across multiple sessions
- The implementation order isn't obvious
- You need to communicate scope to a human or another agent
When to skip: Single-file changes with obvious scope, or when the spec already contains well-defined tasks with acceptance criteria.
The Planning Process
Step 1: Read-Only Exploration
Before writing any plan, operate in read-only mode:
- Read the spec, relevant docs and relevant codebase sections
- Identify existing patterns and conventions
- Map dependencies between components
- Map likely files and responsibilities before writing tasks
- Note risks and unknowns
Do not write implementation code during planning. The output is a plan or task list, not implementation.
When mapping files, prefer clear responsibilities and existing conventions. Files that change together should usually live together; split by responsibility, not by technical layer alone. If an existing file is unwieldy and the planned change touches it, include a targeted split in the plan, but avoid unrelated restructuring.
Step 2: Map the Dependency Graph
Identify what depends on what:
Database schema
│
├── API models/types
│ │
│ ├── API endpoints
│ │ │
│ │ └── Frontend API client
│ │ │
│ │ └── UI components
│ │
│ └── Validation logic
│
└── Seed data / migrations
Implementation order follows the dependency graph bottom-up: build foundations first.
Step 3: Slice Vertically
Instead of building all the database, then all the API, then all the UI — build one complete feature path at a time.
Bad (horizontal slicing):
Task 1: Build entire database schema
Task 2: Build all API endpoints
Task 3: Build all UI components
Task 4: Connect everything
Good (vertical slicing):
Task 1: User can create an account (schema + API + UI for registration)
Task 2: User can log in (auth schema + API + UI for login)
Task 3: User can create a todo (todo schema + API + UI for creation)
Task 4: User can view todo list (query + API + UI for list view)
Each vertical slice delivers working, testable functionality.
Step 4: Size Tasks
Use this sizing guide:
| Size | Files | Scope | Example |
|---|---|---|---|
| XS | 1 | Single function or config change | Add a validation rule |
| S | 1-2 | One component or endpoint | Add a new API endpoint |
| M | 3-5 | One feature slice | User registration flow |
| L | 5-8 | Multi-component feature | Search with filtering and pagination |
| XL | 8+ | Too large — break it down further | — |
Aim for S and M tasks. If a task is L or larger, break it into smaller tasks.
When to break a task down further:
- It would take more than one focused session of agent work
- You cannot describe acceptance criteria in 3 or fewer bullet points
- It touches two or more independent subsystems
- The task title contains "and" (sign of multiple tasks)
Step 5: Write the Plan
Each task follows this structure:
## Task [N]: [Short descriptive title]
**Description:** One paragraph explaining what this task accomplishes.
**Acceptance criteria:**
- [ ] [Specific, testable condition]
- [ ] [Specific, testable condition]
**Verification:**
- [ ] Tests pass: `pytest tests/feature/test_file.py -v`
- [ ] Manual check: [what to verify]
**Dependencies:** [Task numbers this depends on, or None]
**Estimated size:** [XS/S/M/L]
**Files likely touched:**
- `src/path/to/file.py`
- `tests/path/to/test_file.py`
No Placeholders
Every task must contain actionable content. These are plan failures:
- "TBD", "TODO", "implement later", "fill in details"
- "Add appropriate error handling" (without specifying what)
- "Write tests for the above" (without specifying test cases)
- "Similar to Task N" (repeat the detail — the engineer may read tasks out of order)
- Steps that describe what to do without showing specifics
Use exact file paths. Every path should be precise and actionable.
Arrange Tasks With Checkpoints
Order tasks so that:
- Dependencies are satisfied (build foundation first)
- Each task leaves the system in a working state
- Verification checkpoints occur after every 2-3 tasks
- High-risk tasks are early (fail fast)
## Checkpoint: After Tasks 1-3
- [ ] All tests pass
- [ ] Application builds without errors
- [ ] Core user flow works end-to-end
- [ ] Review with human before proceeding
Plan Document Template
# Implementation Plan: [Feature Name]
## Overview
[One paragraph summary of what we're building]
## Architecture Decisions
- [Key decision 1 and rationale]
- [Key decision 2 and rationale]
## Task List
### Phase 1: Foundation
- [ ] Task 1: ...
- [ ] Task 2: ...
### Checkpoint: Foundation
- [ ] Tests pass, builds clean
### Phase 2: Core Features
- [ ] Task 3: ...
- [ ] Task 4: ...
### Checkpoint: Core Features
- [ ] End-to-end flow works
### Phase 3: Polish
- [ ] Task 5: ...
### Checkpoint: Complete
- [ ] All acceptance criteria met
- [ ] Ready for review
## Risks and Mitigations
| Risk | Impact | Mitigation |
|------|--------|------------|
| [Risk] | [High/Med/Low] | [Strategy] |
## Open Questions
- [Question needing human input]
For moderate or larger work, save the plan to docs/implementation-plans/YYYY-MM-DD-<feature>.md. For small work, an inline task list is enough. Plans are working artifacts; persist them when they will help coordination, handoff, or later review.
Parallelization
When multiple agents or sessions are available:
- Safe to parallelize: Independent feature slices, tests for already-implemented features, documentation
- Must be sequential: Database migrations, shared state changes, dependency chains
- Needs coordination: Features that share an API contract — define the contract first, then parallelize
Common Rationalizations
| Rationalization | Reality |
|---|---|
| "I'll figure it out as I go" | That's how you end up with rework. 10 minutes of planning saves hours. |
| "The tasks are obvious" | If the work is multi-step, write them anyway. Explicit tasks surface hidden dependencies and edge cases. |
| "Planning is overhead" | Planning is the task. Implementation without a plan is just typing. |
| "I can hold it all in my head" | Context windows are finite. Written plans survive session boundaries. |
Red Flags
- Starting implementation without a written task list for multi-step work
- Tasks that say "implement the feature" without acceptance criteria
- No verification steps in the plan
- All tasks are XL-sized
- No checkpoints between tasks
- Dependency order isn't considered
Related Skills
| Situation | Skill |
|---|---|
| Idea is vague or still needs product/concept sharpening | idea-sharpening |
| Need a technical spec before task decomposition | brainstorming |
| Plan needs an architecture boundary or ownership decision | architecting-changes |
| Verification strategy, BDD cases, or automated/manual proof is unclear | high-level-testing-strategy |
| Task involves a risky or ambiguous technical assumption | prototype-first |
| Plan or assumptions need adversarial review | doubt-early |
| Plan may be parallelized across independent work domains | when-and-how-to-run-parallel-agents |
| Plan will be delegated to bounded subagents | executing-plans-with-subagents |
| Plan is ready for direct execution | incremental-implementation |
| About to claim the plan or checkpoint is complete | verification-before-completion |
Review
After writing the plan, review it before proceeding. How you review depends on scope. doubt-early can be part of the review process with same or separate subagent.
Plan scope (few tasks, straightforward dependencies, well-understood domain): Run a quick self-review:
- Are there any "TBD", "TODO", or placeholder steps?
- Does every task have acceptance criteria and a verification step?
- Are tasks ordered by dependency (build foundation first)?
- Do tasks have exact file paths, not vague locations?
- Does the plan cover all requirements in the spec?
Complex or large plan (many tasks, cross-component, risky dependencies): Dispatch a fresh subagent to review the plan document independently before proceeding:
You are a plan document reviewer. Verify this plan is complete and ready for implementation.
**Plan to review:** [PLAN_FILE_PATH]
**Spec for reference:** [SPEC_FILE_PATH]
## What to Check
| Category | What to Look For |
|----------|------------------|
| Completeness | TODOs, placeholders, incomplete tasks, missing steps |
| Spec Alignment | Plan covers spec requirements, no major scope creep |
| Task Decomposition | Tasks have clear boundaries, steps are actionable |
| Buildability | Could an engineer follow this plan without getting stuck? |
## Calibration
Only flag issues that would cause real problems during implementation.
Minor wording, stylistic preferences, and "nice to have" suggestions are not issues.
Approve unless there are serious gaps — missing requirements from the spec,
contradictory steps, placeholder content, or tasks so vague they can't be acted on.
## Output Format
**Status:** Approved | Issues Found
**Issues (if any):** [Task X, Step Y]: [specific issue] - [why it matters for implementation]
**Recommendations:** [advisory suggestions]
Fix any issues found. Iterate if the review exposed meaningful problems.
Verification
Before starting implementation:
- Every task has acceptance criteria
- Every task has a verification step
- Task dependencies are identified and ordered correctly
- No task touches more than ~5 files
- Checkpoints exist between major phases
- For moderate/large or ambiguous work, the human has reviewed and approved the plan