Product Capability
This skill turns product intent into explicit engineering constraints.
Use it when the gap is not "what should we build?" but "what exactly must be true before implementation starts?"
When to Use
- A PRD, roadmap item, discussion, or founder note exists, but the implementation constraints are still implicit
- A feature crosses multiple services, repos, or teams and needs a capability contract before coding
- Product intent is clear, but architecture, data, lifecycle, or policy implications are still fuzzy
- Senior engineers keep restating the same hidden assumptions during review
- You need a reusable artifact that can survive across harnesses and sessions
Canonical Artifact
If the repo has a durable product-context file such as PRODUCT.md, docs/product/, or a program-spec directory, update it there.
If no capability manifest exists yet, create one using the template at:
docs/examples/product-capability-template.md
The goal is not to create another planning stack. The goal is to make hidden capability constraints durable and reusable.
Non-Negotiable Rules
- Do not invent product truth. Mark unresolved questions explicitly.
- Separate user-visible promises from implementation details.
- Call out what is fixed policy, what is architecture preference, and what is still open.
- If the request conflicts with existing repo constraints, say so clearly instead of smoothing it over.
- Prefer one reusable capability artifact over scattered ad hoc notes.
Inputs
Read only what is needed:
- Product intent
- issue, discussion, PRD, roadmap note, founder message
- Current architecture
- relevant repo docs, contracts, schemas, routes, existing workflows
- Existing capability context
PRODUCT.md, design docs, RFCs, migration notes, operating-model docs
- Delivery constraints
- auth, billing, compliance, rollout, backwards compatibility, performance, review policy
Core Workflow
1. Restate the capability
Compress the ask into one precise statement:
- who the user or operator is
- what new capability exists after this ships
- what outcome changes because of it
If this statement is weak, the implementation will drift.
2. Resolve capability constraints
Extract the constraints that must hold before implementation:
- business rules
- scope boundaries
- invariants
- trust boundaries
- data ownership
- lifecycle transitions
- rollout / migration requirements
- failure and recovery expectations
These are the things that often live only in senior-engineer memory.
3. Define the implementation-facing contract
Produce an SRS-style capability plan with:
- capability summary
- explicit non-goals
- actors and surfaces
- required states and transitions
- interfaces / inputs / outputs
- data model implications
- security / billing / policy constraints
- observability and operator requirements
- open questions blocking implementation
4. Translate into execution
End with the exact handoff:
- ready for direct implementation
- needs architecture review first
- needs product clarification first
If useful, point to the next ECC-native lane:
project-flow-ops
workspace-surface-audit
api-connector-builder
dashboard-builder
tdd-workflow
verification-loop
Output Format
Return the result in this order:
CAPABILITY
- one-paragraph restatement
CONSTRAINTS
- fixed rules, invariants, and boundaries
IMPLEMENTATION CONTRACT
- actors
- surfaces
- states and transitions
- interface/data implications
NON-GOALS
- what this lane explicitly does not own
OPEN QUESTIONS
- blockers or product decisions still required
HANDOFF
- what should happen next and which ECC lane should take it
Good Outcomes
- Product intent is now concrete enough to implement without rediscovering hidden constraints mid-PR.
- Engineering review has a durable artifact instead of relying on memory or Slack context.
- The resulting plan is reusable across Claude Code, Codex, Cursor, OpenCode, and ECC 2.0 planning surfaces.
1---
2name: product-capability
3description: Translate PRD intent, roadmap asks, or product discussions into an implementation-ready capability plan that exposes constraints, invariants, interfaces, and unresolved decisions before multi-service work starts. Use when the user needs an ECC-native PRD-to-SRS lane instead of vague planning prose.
4metadata:
5 source: https://skillmd.com/skills/rajanthar/product-capability
6---
7
8# Product Capability
9
10This skill turns product intent into explicit engineering constraints.
11
12Use it when the gap is not "what should we build?" but "what exactly must be true before implementation starts?"
13
14## When to Use
15
16- A PRD, roadmap item, discussion, or founder note exists, but the implementation constraints are still implicit
17- A feature crosses multiple services, repos, or teams and needs a capability contract before coding
18- Product intent is clear, but architecture, data, lifecycle, or policy implications are still fuzzy
19- Senior engineers keep restating the same hidden assumptions during review
20- You need a reusable artifact that can survive across harnesses and sessions
21
22## Canonical Artifact
23
24If the repo has a durable product-context file such as `PRODUCT.md`, `docs/product/`, or a program-spec directory, update it there.
25
26If no capability manifest exists yet, create one using the template at:
27
28- `docs/examples/product-capability-template.md`
29
30The goal is not to create another planning stack. The goal is to make hidden capability constraints durable and reusable.
31
32## Non-Negotiable Rules
33
34- Do not invent product truth. Mark unresolved questions explicitly.
35- Separate user-visible promises from implementation details.
36- Call out what is fixed policy, what is architecture preference, and what is still open.
37- If the request conflicts with existing repo constraints, say so clearly instead of smoothing it over.
38- Prefer one reusable capability artifact over scattered ad hoc notes.
39
40## Inputs
41
42Read only what is needed:
43
441. Product intent
45 - issue, discussion, PRD, roadmap note, founder message
462. Current architecture
47 - relevant repo docs, contracts, schemas, routes, existing workflows
483. Existing capability context
49 - `PRODUCT.md`, design docs, RFCs, migration notes, operating-model docs
504. Delivery constraints
51 - auth, billing, compliance, rollout, backwards compatibility, performance, review policy
52
53## Core Workflow
54
55### 1. Restate the capability
56
57Compress the ask into one precise statement:
58
59- who the user or operator is
60- what new capability exists after this ships
61- what outcome changes because of it
62
63If this statement is weak, the implementation will drift.
64
65### 2. Resolve capability constraints
66
67Extract the constraints that must hold before implementation:
68
69- business rules
70- scope boundaries
71- invariants
72- trust boundaries
73- data ownership
74- lifecycle transitions
75- rollout / migration requirements
76- failure and recovery expectations
77
78These are the things that often live only in senior-engineer memory.
79
80### 3. Define the implementation-facing contract
81
82Produce an SRS-style capability plan with:
83
84- capability summary
85- explicit non-goals
86- actors and surfaces
87- required states and transitions
88- interfaces / inputs / outputs
89- data model implications
90- security / billing / policy constraints
91- observability and operator requirements
92- open questions blocking implementation
93
94### 4. Translate into execution
95
96End with the exact handoff:
97
98- ready for direct implementation
99- needs architecture review first
100- needs product clarification first
101
102If useful, point to the next ECC-native lane:
103
104- `project-flow-ops`
105- `workspace-surface-audit`
106- `api-connector-builder`
107- `dashboard-builder`
108- `tdd-workflow`
109- `verification-loop`
110
111## Output Format
112
113Return the result in this order:
114
115```text
116CAPABILITY
117- one-paragraph restatement
118
119CONSTRAINTS
120- fixed rules, invariants, and boundaries
121
122IMPLEMENTATION CONTRACT
123- actors
124- surfaces
125- states and transitions
126- interface/data implications
127
128NON-GOALS
129- what this lane explicitly does not own
130
131OPEN QUESTIONS
132- blockers or product decisions still required
133
134HANDOFF
135- what should happen next and which ECC lane should take it
136```
137
138## Good Outcomes
139
140- Product intent is now concrete enough to implement without rediscovering hidden constraints mid-PR.
141- Engineering review has a durable artifact instead of relying on memory or Slack context.
142- The resulting plan is reusable across Claude Code, Codex, Cursor, OpenCode, and ECC 2.0 planning surfaces.