HR DevOps lifecycle
Use this skill when
- Working in the authoritative HR ERP checkout on CI, deploy, or operations docs
- S&OP / IBP / value delivery cycles for this product (stakeholder value plan)
Instructions
- Load
@devops-product-lifecyclefirst (portable S&OP, IBP, value patterns). - Read references/hr-erp-ops.md before changing workflows or env contracts.
- Use project templates under
specs/templates/(sop-cycle, ibp-checkpoint, value-delivery-record). - Value gate (ADR 0019): T1+ product ships require a filled value-delivery-record.md; T2+ handoffs link
sopCycleIdwhen VDR path is set. PR lint is strict for T1+. - Efficiency: IBP Engineering row tracks CI duration; T4 swarms require FinOps checkpoint per
@hr-swarm-governance. - Anti-patterns: no
vercel deploy --prebuiltwith pulled secrets; no production Kafka/multi-DB without ADR trigger.
Resources
- references/hr-erp-ops.md
- docs/meta/devops-product-lifecycle-framework.md
- ADR 0015
Limitations
- HR ERP Phase 1 topology only — defer Track D platform per deferred-platform-track.md