Product Capability
This skill turns product intent into explicit engineering constraints.
Use it when the gap is not "what should we build?" but "what exactly must be true before implementation starts?"
When to Use
- A PRD, roadmap item, discussion, or founder note exists, but the implementation constraints are still implicit
- A feature crosses multiple services, repos, or teams and needs a capability contract before coding
- Product intent is clear, but architecture, data, lifecycle, or policy implications are still fuzzy
- Senior engineers keep restating the same hidden assumptions during review
- You need a reusable artifact that can survive across harnesses and sessions
Canonical Artifact
If the repo has a durable product-context file such as PRODUCT.md, docs/product/, or a program-spec directory, update it there.
If no capability manifest exists yet, create one using the template at:
docs/examples/product-capability-template.md
The goal is not to create another planning stack. The goal is to make hidden capability constraints durable and reusable.
Non-Negotiable Rules
- Do not invent product truth. Mark unresolved questions explicitly.
- Separate user-visible promises from implementation details.
- Call out what is fixed policy, what is architecture preference, and what is still open.
- If the request conflicts with existing repo constraints, say so clearly instead of smoothing it over.
- Prefer one reusable capability artifact over scattered ad hoc notes.
Inputs
Read only what is needed:
- Product intent
- issue, discussion, PRD, roadmap note, founder message
- Current architecture
- relevant repo docs, contracts, schemas, routes, existing workflows
- Existing capability context
PRODUCT.md, design docs, RFCs, migration notes, operating-model docs
- Delivery constraints
- auth, billing, compliance, rollout, backwards compatibility, performance, review policy
Core Workflow
1. Restate the capability
Compress the ask into one precise statement:
- who the user or operator is
- what new capability exists after this ships
- what outcome changes because of it
If this statement is weak, the implementation will drift.
2. Resolve capability constraints
Extract the constraints that must hold before implementation:
- business rules
- scope boundaries
- invariants
- trust boundaries
- data ownership
- lifecycle transitions
- rollout / migration requirements
- failure and recovery expectations
These are the things that often live only in senior-engineer memory.
3. Define the implementation-facing contract
Produce an SRS-style capability plan with:
- capability summary
- explicit non-goals
- actors and surfaces
- required states and transitions
- interfaces / inputs / outputs
- data model implications
- security / billing / policy constraints
- observability and operator requirements
- open questions blocking implementation
4. Translate into execution
End with the exact handoff:
- ready for direct implementation
- needs architecture review first
- needs product clarification first
If useful, point to the next ECC-native lane:
project-flow-ops
workspace-surface-audit
api-connector-builder
dashboard-builder
tdd-workflow
verification-loop
Output Format
Return the result in this order:
CAPABILITY
- one-paragraph restatement
CONSTRAINTS
- fixed rules, invariants, and boundaries
IMPLEMENTATION CONTRACT
- actors
- surfaces
- states and transitions
- interface/data implications
NON-GOALS
- what this lane explicitly does not own
OPEN QUESTIONS
- blockers or product decisions still required
HANDOFF
- what should happen next and which ECC lane should take it
Good Outcomes
- Product intent is now concrete enough to implement without rediscovering hidden constraints mid-PR.
- Engineering review has a durable artifact instead of relying on memory or Slack context.
- The resulting plan is reusable across Claude Code, Codex, Cursor, OpenCode, and ECC 2.0 planning surfaces.
1---2name: product-capability3description: Translate PRD intent, roadmap asks, or product discussions into an implementation-ready capability plan that exposes constraints, invariants, interfaces, and unresolved decisions before multi-service work starts. Use when the user needs an ECC-native PRD-to-SRS lane instead of vague planning prose.4---56# Product Capability78This skill turns product intent into explicit engineering constraints.910Use it when the gap is not "what should we build?" but "what exactly must be true before implementation starts?"1112## When to Use1314- A PRD, roadmap item, discussion, or founder note exists, but the implementation constraints are still implicit15- A feature crosses multiple services, repos, or teams and needs a capability contract before coding16- Product intent is clear, but architecture, data, lifecycle, or policy implications are still fuzzy17- Senior engineers keep restating the same hidden assumptions during review18- You need a reusable artifact that can survive across harnesses and sessions1920## Canonical Artifact2122If the repo has a durable product-context file such as `PRODUCT.md`, `docs/product/`, or a program-spec directory, update it there.2324If no capability manifest exists yet, create one using the template at:2526- `docs/examples/product-capability-template.md`2728The goal is not to create another planning stack. The goal is to make hidden capability constraints durable and reusable.2930## Non-Negotiable Rules3132- Do not invent product truth. Mark unresolved questions explicitly.33- Separate user-visible promises from implementation details.34- Call out what is fixed policy, what is architecture preference, and what is still open.35- If the request conflicts with existing repo constraints, say so clearly instead of smoothing it over.36- Prefer one reusable capability artifact over scattered ad hoc notes.3738## Inputs3940Read only what is needed:41421. Product intent43 - issue, discussion, PRD, roadmap note, founder message442. Current architecture45 - relevant repo docs, contracts, schemas, routes, existing workflows463. Existing capability context47 - `PRODUCT.md`, design docs, RFCs, migration notes, operating-model docs484. Delivery constraints49 - auth, billing, compliance, rollout, backwards compatibility, performance, review policy5051## Core Workflow5253### 1. Restate the capability5455Compress the ask into one precise statement:5657- who the user or operator is58- what new capability exists after this ships59- what outcome changes because of it6061If this statement is weak, the implementation will drift.6263### 2. Resolve capability constraints6465Extract the constraints that must hold before implementation:6667- business rules68- scope boundaries69- invariants70- trust boundaries71- data ownership72- lifecycle transitions73- rollout / migration requirements74- failure and recovery expectations7576These are the things that often live only in senior-engineer memory.7778### 3. Define the implementation-facing contract7980Produce an SRS-style capability plan with:8182- capability summary83- explicit non-goals84- actors and surfaces85- required states and transitions86- interfaces / inputs / outputs87- data model implications88- security / billing / policy constraints89- observability and operator requirements90- open questions blocking implementation9192### 4. Translate into execution9394End with the exact handoff:9596- ready for direct implementation97- needs architecture review first98- needs product clarification first99100If useful, point to the next ECC-native lane:101102- `project-flow-ops`103- `workspace-surface-audit`104- `api-connector-builder`105- `dashboard-builder`106- `tdd-workflow`107- `verification-loop`108109## Output Format110111Return the result in this order:112113```text114CAPABILITY115- one-paragraph restatement116117CONSTRAINTS118- fixed rules, invariants, and boundaries119120IMPLEMENTATION CONTRACT121- actors122- surfaces123- states and transitions124- interface/data implications125126NON-GOALS127- what this lane explicitly does not own128129OPEN QUESTIONS130- blockers or product decisions still required131132HANDOFF133- what should happen next and which ECC lane should take it134```135136## Good Outcomes137138- Product intent is now concrete enough to implement without rediscovering hidden constraints mid-PR.139- Engineering review has a durable artifact instead of relying on memory or Slack context.140- The resulting plan is reusable across Claude Code, Codex, Cursor, OpenCode, and ECC 2.0 planning surfaces.