Walk the user through a comprehensive review of their entire workspace. This is the "reflect" phase — the practice that keeps the system trustworthy. Inspired by GTD's weekly review: get clear, get current, get creative.
Trigger Phrases
- "Weekly review", "Let's review", "Review my projects"
- "How did this week go?", "What's the state of everything?"
- "End of week check-in", "Friday review"
- "What did I accomplish this week?"
Workflow
Step 1 — Gather Everything
Make these calls to build the full picture:
get_brain_overview— all projects and their statsquery_todoswithstatus: doneandcompleted_after: [7 days ago]— recent completionsquery_todoswithstatus: open— all open tasksquery_todoswithstatus: blocked— blocked itemsget_dump_items— inbox state
Step 2 — Celebrate Progress
Start positive. Present what was accomplished this week:
"This week you completed [N] tasks across [X] projects."
List the completed tasks grouped by project. Acknowledge effort — this is what keeps people motivated.
Step 3 — Review Each Active Project
For each project with open tasks:
- Show project name, open task count, and any in-progress/blocked items
- Ask: "Is this still active? Anything changed?"
- Look for signals:
- Stale tasks: open tasks with no recent activity — ask if they're still relevant
- Blocked tasks: surface them prominently — "This has been blocked. Can we unblock it?"
- Missing deadlines: overdue tasks — "This was due [date]. What's the status?"
Keep this conversational, not interrogative. If a project is on track, a quick "Looks good, moving on" is fine.
Step 4 — Identify Stale Work
Query for tasks that have been open a long time without progress:
- Tasks created > 2 weeks ago with status still
open(never moved toin-progress) - Flag these specifically:
"These tasks have been sitting for a while. Want to reprioritize, defer, or drop any of them?"
Options for each:
- Keep as-is — still relevant, just not yet
- Reprioritize — change priority or add a due date to create urgency
- Drop — mark as done or delete if no longer needed
- Break down — maybe the task is too big; split into smaller tasks
Step 5 — Process Inbox
If the inbox has items:
"You have [N] items in your inbox. Want to do a quick triage?"
If yes, transition to the brain-triage workflow. If not, note it as a todo for next session.
Step 6 — Look Ahead
Ask about the coming week:
"Anything coming up next week? New deadlines, priorities, or projects?"
Create any new tasks or adjust priorities based on the response.
Step 7 — Generate Review Note
Offer to create a weekly review note:
Call create_daily_note (or create_project_note in a "reviews" project) with a summary:
- Tasks completed this week
- Key decisions made during review
- Focus areas for next week
- Any items deferred or dropped
Tool Sequence
get_brain_overview()
query_todos(status: done, completed_after: [7 days ago])
query_todos(status: open)
query_todos(status: blocked)
get_dump_items()
→ celebrate completions
→ review each project
→ surface stale/blocked work
→ (optionally) triage inbox
→ look ahead
→ update_todo() / delete_todo() / create_todo_in_project() as needed
→ create_daily_note() or create_project_note() with summary
Notes
- The weekly review should take 5-15 minutes, not 45. Keep it moving.
- Do not read back every single task — summarize and highlight what needs attention
- If a project has > 10 open tasks, suggest the user focus on the top 3-5 rather than reviewing all
- Respect "skip" — if the user says a project is fine, move on without drilling in
- Tone: reflective and supportive — like a good coach checking in, not an auditor
- This is the most important skill for long-term system trust. If reviews happen, the system stays current.