1. Scope and triggers
Enterprise architecture exists so that systems decisions are taken with the complete landscape in front of you. Its product is not a diagram: it is that whoever decides to buy, build, migrate or switch off knows what already exists, who pays for it, what it depends on and what breaks. Its typical failure —and the function's default failure mode— is producing documentation nobody uses: models that are correct, complete, updated once and consulted never.
Rule of existence, applicable on Monday: an EA artifact that has not changed any decision in the last 90 days is retired or is assigned the decision it was supposed to inform. No exception for "it is reference documentation".
Covers: the application inventory and its degradation, the lifecycle decision per application (TIME), the modernisation "R"s, frameworks (TOGAF, ArchiMate and lightweight alternatives), the business capability map, technology standards and their exception process, the technology radar, build/buy/SaaS, the integration landscape as invisible debt, architecture governance and its bottlenecks, the descent to team decisions and the function's metrics.
Not applicable:
software-architecture-patterns-standards(critical boundary): theirs the internal design of one system —style, module boundaries, dependency rule, CQRS, ADR, C4—; here the organisation's landscape, the inventory, the cross-cutting standards and their governance. Arbitration: if the question is how this system is structured, it is theirs; if it is which systems we have, which are redundant and what the standard is, it belongs here.itsm-itil-standards(fine boundary, written precisely): theirs the CMDB, the configuration items and the service catalogue. The CMDB inventories configuration items in order to operate (what is affected by this change, which CI failed); the application inventory inventories capabilities in order to decide (what does this contribute to the business, what does it cost, is it kept or switched off). Different granularity, different cadence and different owner. Rule: an application in the inventory references its CIs, it does not duplicate them (§3.2); if they end up diverging, the CMDB wins on operational state and the inventory on the portfolio decision.platform-engineering-standards(the internal platform as a product and its paved road; here the standard the platform implements, not its implementation).lowcode-governance-standards(theirs the catalogue of personal tools and its governance — environments, connector DLP, flow identity, orphaned flows—; the low-code app that becomes critical enters the application inventory here, with owner, cost and lifecycle).tech-leadership-standards(the decision to invest, the negotiation and the organisational record; here the technical portfolio criteria that feed it).project-management-standards(how the migration programme is delivered; here what is migrated and why).finops-standards(hard reciprocal: cost per application is computed with their method — tagging, allocation of shared costs, economic unit— and enters here as a mandatory input to the lifecycle decision; §3.1).grc-compliance-standards(control framework, audit and evidence; here the compliance attribute as an inventory field, not the programme).microservices-architecture-standards(the distributed topology of a system and its communication).data-governance-quality-standards(theirs data ownership, the data catalogue, the glossary and data contracts; here the application as a source system, not the data).iac-standards(how infrastructure is declared and deployed).bcdr-standards(reciprocal: criticality and RTO/RPO per application are derived from its BIA and are stored as an inventory field; they are not recalculated here).knowledge-management-standards(where what is written here lives and how it is maintained) andproduct-discovery-standards(what is built and for whom). The landscape decides which systems exist; discovery, what is built; documentation is what remains written of both decisions.- Legacy platform skills:
mainframe-zos-cobol-standards,ibm-i-rpg-standards,mumps-standards,dotnet-framework-legacy-standards,aix-solaris-hpux-standardsand the rest of the legacy block. Here it is decided what is done with an application —the TIME model, the chosen modernisation "R", the cost and the owner—; there, what that decision technically implies on that specific platform and whether it is even viable. The rule that avoids the expensive error: an "R" is chosen with the platform's technical criteria in front of you, not on a spreadsheet — there are platforms where automated rewriting produces code nobody can maintain and others where freezing and encapsulating is the right answer.legacy-modernization-standardsis the umbrella that routes between them.
2. Default decisions
Verify the latest version/status/licence on the web before pinning it in a real project (§8).
| Area | Default | Justifiable alternative |
|---|---|---|
| Root artifact | Application inventory with the 8 mandatory fields of §3.1 | None: without an inventory there is no EA function |
| Framework | None in full. Take from TOGAF only the ADM as a phase script and whichever views get used | The full TOGAF Standard 10th Edition only with a contractual/regulatory obligation or a required certification |
| Notation | C4 for systems (→ software-architecture-patterns-standards) and named boxes with a legend for the landscape |
ArchiMate 3.2 if there is already a repository and trained modellers — check the licence before publishing (§2.2) |
| Modelling tool | Archi (MIT) over a git repository | Structure inside the EA tool if one is already paid for |
| Portfolio repository | A versioned sheet/table or a lightweight database with owner and CI up to ~150 applications | SAP LeanIX / Ardoq / Bizzdesign above that, priced by number of applications (§2.3) |
| Lifecycle decision | TIME (tolerate, invest, migrate, eliminate), reviewed on a fixed cadence | Any bespoke 4-quadrant taxonomy, if it is written down and its axes defined |
| Modernisation | Retire and retain first; the other Rs only after ruling out switching off | — |
| Mapping axis | Business capability map (stable) | Never the org chart as the primary axis (§3.3) |
| Standards | Published technology radar, with 4 rings and a date | A list of "approved technologies" only if it has an exception process (§4.2) |
| Exceptions | With a mandatory expiry date (§4.2) | None |
| Governance | Advisory board with threshold-based review (§6.1) | A committee that approves everything: FORBIDDEN (§7) |
2.1 TOGAF: what to take and what to throw away
- Current version: TOGAF Standard, 10th Edition (The Open Group, launch announcement of April
2022; the C220 document bundle incorporates a 2025 technical corrigendum). There is no 11th edition
as of Aug 2026 — verify at
opengroup.org/togaf(§8). TOGAF® is a registered trademark of The Open Group: its use in materials and the certification have their own conditions. - Be honest: most organisations do not need the whole of TOGAF. What is usable without adopting it entirely: the ADM as a phase script (vision → business → information systems → technology → opportunities → migration → governance → change management), the concept of target vs. baseline architecture with gap analysis, and the architecture repository. What is thrown away by default: the full metamodel, the exhaustive catalogue of deliverables and the chain of architecture contracts.
- Criteria for full adoption: only if (a) a contract, a regulator or a client requires it by name, or (b) there are ≥3 full-time architects. Below that, adopting the whole of TOGAF produces exactly the failure of §1.
2.2 ArchiMate and its licence — it decides whether you can publish the notation
- ArchiMate 3.2 Specification, The Open Group, document C226, published in October 2022. ArchiMate® is a registered trademark of The Open Group.
- Licence — the deciding point: the specification is not freely redistributable. The Open
Group publishes it under a tiered model: a free 90-day evaluation licence (internal
use, keeping copyright and trademark notices) and, on expiry, you must request a non-commercial
or commercial licence or withdraw the document. All commercial use is subject to the annual
commercial licence. Operational rule: modelling in ArchiMate for internal consumption is a
workable route; embedding the specification, its reference cards or derived material in
public documentation, paid training or consultancy deliverables requires checking the commercial
licence first. Verify at
opengroup.org/legal/licensing(§8) —it is a legal decision, not a technical one. - The specification separates language concepts from notation: the graphical notation it publishes is one default notation, not the only valid one. Practical corollary: if the problem is that nobody understands the diagrams, changing the notation is legitimate and does not break the model.
- Archi (
archimatetool.com) is the default editor: MIT licence verified in raw —The MIT License (MIT) / Copyright (c) 2013-2026 Phillip Beauvoir, Jean-Baptiste Sarrodie, The Open Group. The MIT tool does not license the specification: they are two different things and the second is not inherited from the first.
2.3 Portfolio tools
- SAP LeanIX, Ardoq and Bizzdesign: none publishes list pricing; LeanIX and Ardoq license by number of applications (unlimited users in LeanIX's model). Purchasing consequence: know the real number of applications before requesting a quote, because it is the variable that sets the price and the only one that makes quotes comparable. Pricing → gap in §8.
- You do not buy an EA tool to create the inventory. You buy it when the inventory already exists, is maintained and the bottleneck is volume or integration with CMDB/billing. Buying it earlier reproduces the failure of §1 with an annual licence.
3. Structure and conventions
3.1 The application inventory — the only artifact that justifies the function
Mandatory fields; a row without them is not in the inventory, it is in a list:
| Field | Rule |
|---|---|
| Name and aliases | One canonical name; aliases are recorded, not argued about |
| Business owner (a person, not a team) | If nobody accepts being the owner, the application is a candidate for eliminate by definition |
| Technical lead | Team with on-call or vendor with a contract |
| Criticality and RTO/RPO | Derived from the BIA → bcdr-standards; only referenced here |
| Total annual cost | Licence + infrastructure + support + estimated internal effort → method from finops-standards |
| Lifecycle state | invest / tolerate / migrate / eliminate + date of the last review |
| End-of-support date | From the vendor or the version; empty ≠ "does not expire" |
| Business capabilities it supports | Link to the map (§3.3), 1..n |
| Dependencies | Applications and integrations it depends on and that depend on it (§5.1) |
| Data it processes | Classification and whether there is personal data → privacy-engineering-standards, data-governance-quality-standards |
| CI reference | Identifier in the CMDB; a reference, not a copy |
Why it degrades, and what is done against each cause —this is the function's real work:
- It is created as a project and not as a process. Counter: the inventory has a named owner and a dated review in the calendar, not a project milestone.
- It is not in anybody's path. Data that only serves the annual report rots. Counter: tie it to an event that already happens — application registration at project registration, cost from actual billing, dependencies from network/CMDB discovery, end of support from the vulnerability inventory.
- Opinion-based fields with no definition. "High criticality" with no criteria produces 60 % of the applications at high. Counter: every field with closed values and a written assignment rule.
- Manual capture of what is already in another system. Counter: generate from the source and
reconcile, never type it twice (same principle as §4 of
knowledge-management-standards). - Nobody sees the consequence of lying. Counter: if cost comes out of the inventory, the budget comes out of the inventory; data that decides money corrects itself.
Inventory health metric (falsifiable): percentage of applications with a live owner and a review in the last 12 months, and the deviation between the inventory's cost and the actual invoice. If the deviation exceeds 10 %, the inventory is not usable for portfolio decisions.
3.2 Boundary with the CMDB, without ambiguity
| Application inventory | CMDB (itsm-itil-standards) |
|
|---|---|---|
| Question it answers | Does this deserve to exist next year? | What is affected by this change or incident? |
| Unit | Application / capability | Configuration item |
| Cadence | Quarterly/annual review | Continuous, tied to change |
| Owner | Architecture + business owner | Service management |
| Source of truth in a conflict | Portfolio decision, cost, business owner | Operational state, deployment relationships |
FORBIDDEN to maintain two independent dependency graphs: one references the other.
3.3 Business capabilities as a stable axis
- It is mapped against what the organisation does (capabilities: "invoice", "originate a loan", "manage returns"), not against who does it. The org chart changes with every reorganisation; the capability does not. An inventory indexed by department becomes useless at the next reorganisation — and that happens sooner than the next portfolio review.
- Two levels are enough to decide portfolio; three only if an entire level is going to be outsourced or bought. A map with four levels and 300 leaves is a modelling project, not a tool.
- Real use: colour the map by cost, by criticality and by duplication (number of applications supporting the same capability). Duplication in a non-differentiating capability is the finding that pays for the function.
3.4 Lifecycle decision: TIME
- TIME (Tolerate, Invest, Migrate, Eliminate) is consistently attributed to Gartner as an application portfolio rationalisation framework. Declared discrepancy: I could not locate the primary research note (identifier and year) in open sources —the available ones are secondary, mostly from EA tool vendors—, and its axes do not agree between sources: some cross technical fit × functional fit and others business value × technical fit. Operational consequence: if TIME is used, write in your own document which two axes are used and how they are scored; citing it without pinning the axes guarantees that two people will classify the same application differently. Verify the primary source before attributing it in a formal document (§8).
- Hard rules that make the classification falsifiable:
toleratecarries a mandatory re-review date; without it, it is abandonment with a nice name.investrequires an identified differentiating capability (§5.2) and allocated budget.eliminaterequires a shutdown date, a data plan and notified consumers; an application "eliminated" that is still running still costs money.- No application is left unclassified: with no explicit classification, the default
state is
toleratewith a 12-month review, and it is declared as such.
3.5 The modernisation "R"s
Working taxonomy (AWS names, in majority use): rehost, relocate, replatform, repurchase, refactor/re-architect, retire, retain.
- Origin, with the attribution chain declared: secondary sources place the origin in Gartner (2011, Richard Watson) with five strategies —rehost, refactor, revise, rebuild, replace—, later extended and renamed by AWS to 6 and then to 7 Rs. Divergence detected in the sources: several pages attribute AWS's nomenclature to Gartner (replatform, repurchase, retire), which is not the original list. Rule: when citing the taxonomy, say which list you are talking about (Gartner 5 or AWS 7) or do not cite it. I could not confirm AWS's list verbatim against their official documentation in this pass (two failed fetch attempts); verify in the AWS prescriptive guidance before using it in a formal document (§8).
- Mandatory order of evaluation, and this really is a criterion:
retire→retain→repurchase→rehost/relocate→replatform→refactor→rebuild. Switching off is evaluated before moving, and buying before rewriting. Rewriting is the most expensive option and the one most often chosen first. rebuild(rewriting from scratch) exists and closes the list:legacy-modernization-standards§2.3 treats it as a strategy in its own right and conditions it on the exceptions ofrefactoring-tech-debt-standards§6.2. The two lists are the same, with this equivalence: their replace is thisrepurchase, and theirrefactor/rearchitectis thisrefactor. When citing, say which list you are talking about.- The order is portfolio-level, not system-level: it sets where you start looking when there are a hundred applications. The specific platform's skill may invert it with written justification, and sometimes must — on IBM i, for instance, modernising in place (ILE, SQL, APIs) is usually dramatically cheaper than buying, and almost nobody exhausts that route before proposing migration. Inverting the order without writing down why is skipping the criteria, not adapting them.
rehostto the cloud without a subsequent dated replatform plan moves the debt and adds an invoice: it is accepted only with a written timing reason (data centre closure, hardware end of support).- No single R applies to the whole portfolio: it is decided per application, with the cost of §3.1 in front of you.
4. Standards, exceptions and radar
(Section 4 of the template —quality and testing— replaced: in a judgement function, the equivalent quality control is standard governance and its verification.)
4.1 How a technology standard is set
A standard without these five pieces is not a standard, it is a preference:
- Scope: what it applies to and what it explicitly does not.
- Reason: which problem it avoids (support, security, hiring, cost), in one falsifiable sentence.
- Owner: the person who maintains it and to whom the exception is requested.
- Date and review: date of entry into force and of the next review. A standard with no review becomes the reason people work around it.
- Application to what exists: if it only applies to new things, say so. Retroactive migration without a budget is an undeclared mass exception.
4.2 The exception process — an exception without a date is a new standard
- Every exception carries: reason, scope, owner, exit condition and expiry date. INDEFINITE EXCEPTIONS ARE FORBIDDEN.
- Maximum recommended expiry: 12 months. On expiry there are only two ways out: the standard is met or the standard is changed (because three exceptions against the same rule mean the rule is wrong, not that people are undisciplined).
- The exceptions register is internally public and is reviewed in the same session as the radar. Metric: number of expired unresolved exceptions. If it grows two quarters in a row, the problem is the standard.
4.3 The technology radar as an artifact
- Reference format: Thoughtworks's Technology Radar, published twice a year,
with four quadrants (Techniques, Platforms, Tools, Languages and Frameworks) and four
rings. Verified correction: the outer ring is no longer called "Hold" but "Caution"
(adopt / trial / assess / caution) — if your template or your data says
Hold, it is out of date. - Tool: Thoughtworks's Build Your Own Radar, AGPL-3.0 (copyright 2015 Bruno
Trecenti; 2016 Thoughtworks). Consequence of the AGPL: if it is deployed modified and served over
the network, the licence's obligations apply → cross-check with
opensource-licensing-standardsbefore forking it. - Rules specific to the internal radar: every blip carries a date and one sentence on why; a blip in
cautionnames the replacement; and the radar is published on the same dates as the exceptions review, because they are the same conversation.
5. Integration, and build/buy/SaaS
5.1 The integration landscape is the invisible debt
- What prevents switching off an application is almost never the application: it is its integrations. That is why the dependencies column of §3.1 is mandatory and not optional.
- Every integration has an owner, a contract and known consumers. An integration with no identifiable consumers is the first candidate for retirement, and its retirement is the cheapest way to shrink the landscape.
- Choice of topology (implementation is delegated):
- Point to point: the default below ~10 integrations. Real cost = n·(n−1)/2 in the worst case; it is abandoned when that number stops fitting on a whiteboard.
- Bus / centralised integration: when the problem is mediation and routing, not volume. Declared risk: business logic inside the bus — it is forbidden in writing or the bus becomes the most critical and least testable system in the house.
- Events: when the producer must not know the consumers and eventual consistency
is acceptable to the business. Implementation →
message-brokers-standards,microservices-architecture-standards,streaming-cdc-standards.
- Contract before technology: who publishes, which schema, what compatibility and what SLA →
api-design-standards,data-governance-quality-standards.
5.2 Build vs. buy vs. SaaS
It is decided with four questions, in this order. The first is eliminating:
- Is it a differentiating capability? Would a customer choose the organisation because of how it does this? If not, it is not built. Building your own ERP, CRM or payroll system is the most expensive known way of not differentiating.
- Total 5-year cost, not licence price: licence + integration + operation + support + people + the cost of the version that will have to be migrated. The cost of building includes maintaining it for those 5 years; almost no "build" business case includes it, and that is why almost all of them win on the spreadsheet and lose in reality.
- Vendor dependency: is the data exportable in a usable format? is there an API? does the
contract allow auditing? what happens if the price goes up 40 %? → vendor due diligence in
grc-compliance-standardsandbcdr-standards. - Exit: the exit plan is written before signing (export format, data ownership, return deadline, estimated migration cost). Without a written exit plan, SaaS is a one-way decision disguised as a monthly subscription.
Additional rule: customising a bought product beyond its supported configuration point turns a purchase into a build, with the worst cost profile of both. If it is needed, the right answer is usually to change the business process or change product.
6. Governance, descent to delivery and metrics
6.1 Who decides what
| Type of decision | Decided by | Architecture contributes |
|---|---|---|
| Internal design of a system | The team | The applicable standard and a review on request |
| Adoption of technology outside the radar | Team + standard owner | Exception with an expiry (§4.2) |
| New application in the portfolio / purchase | Business owner + architecture | Duplication, total cost, fit with capabilities |
| Switching off an application | Business owner | Dependencies and affected consumers |
| Change to a cross-cutting standard | Architecture board | Proposal and consequences |
- Threshold, not universal review: what is one-way is reviewed (irreversible spend, personal data, long-term vendor dependency, a change affecting more than one team). Everything else is decided in the team and communicated.
- Why a committee that reviews everything becomes a bottleneck —with the available
evidence—: DORA/Accelerate's finding on approval by an external body (CAB or
management) is that external approvals correlate negatively with lead time,
deployment frequency and time to restore, and do not correlate with change failure
rate; DORA states it found no evidence that a formal external process reduces
failures. The "2.6× more likely to be a low performer" figure circulates attributed to the 2019 report: I do not
use it, because I could not verify it against the primary source it is attributed to. The
qualitative argument stands without it. Alternative recommended by DORA: peer review
during development + automation of controls →
code-review-standards,cicd-standards. - Corollary: an architecture board that approves designs is a CAB under another name. Its job is to set standards, resolve exceptions and arbitrate conflicts between teams; not to approve anybody's work.
6.2 The descent to delivery — architecture that does not descend to concrete decisions does not exist
- Every standard materialises in something executable or it does not count: a template in the paved road
(
platform-engineering-standards), an IaC module, an admission policy, a CI gate, a fitness function (software-architecture-patterns-standards). The PDF is not a compliance mechanism. - The architect accompanies the first team that applies a new standard. If nobody from architecture has used the standard they wrote, the standard is untested.
- Mandatory link with the ADR: a team's decision that departs from a standard is written as an ADR and as an exception with an expiry (same fact, two records with different owners).
6.3 Metrics for the function (none counts documents)
| Metric | What it diagnoses | Alarm signal |
|---|---|---|
| % of applications with a live owner and a review < 12 months | Inventory health | < 80 % |
| Deviation of inventory cost vs. invoice | Usefulness of the inventory for deciding | > 10 % |
| Number of applications switched off per period | That the function also subtracts | 0 in a year |
| Duplication per non-differentiating capability | Portfolio overlap | Growing |
| Expired unresolved exceptions | Standard misaligned with reality | Grows for 2 quarters |
| Median age of the artifact consulted | Living vs. dead documentation | Nobody consults anything |
| Response time to an architecture query | Whether the function is a service or a customs post | Days |
7. Long-term sustainability and prohibitions
- Minimum cadence: quarterly portfolio review (TIME state, additions and removals), radar and exceptions half-yearly, capability map annually or when the business model changes (not when reorganising).
- Deprecating standards: a withdrawn standard is marked as withdrawn with a date; it is not deleted, because there are systems built against it.
- Prohibitions:
- ❌ A diagram with no owner and no date. A diagram without both is folklore; it is deleted or adopted.
- ❌ A standard with no exception process. It produces silent non-compliance, which is worse than the recorded exception because it is not measured.
- ❌ An exception with no expiry date (§4.2).
- ❌ An inventory nobody updates: if it is not tied to an event that already happens (§3.1), do not start it.
- ❌ Choosing a framework before a problem. "We are going to implement TOGAF" is not an objective; "we know which applications duplicate the invoicing capability and what they cost" is.
- ❌ Ivory tower: an architect who produces the target and accompanies no implementation.
- ❌ An architecture board that approves every design (§6.1).
- ❌ Two sources of truth for dependencies or for cost (§3.2).
- ❌ Rewriting without having evaluated retire and repurchase, and rehost without a date for the replatform.
- ❌ Signing SaaS without a written exit plan.
- ❌ Citing framework figures or failure rates without a primary source in an architecture document: it is the fastest way to lose credibility with whoever decides the money.
- ❌ Publishing ArchiMate notation or derived material outside the organisation without checking the applicable licence (§2.2).
8. Mandatory web verification
Check before pinning anything:
- TOGAF: current edition and corrigenda at
opengroup.org/togaf; ownership and trademark conditions. Here: 10th Edition (2022), 2025 corrigendum in the C220 bundle. - ArchiMate: current version (3.2, C226, Oct 2022) and the licence applicable to your specific use
at
opengroup.org/legal/licensing— 90-day evaluation / non-commercial / annual commercial. Legal decision: consult before publishing. - TIME: declared gap — the primary Gartner note (identifier and year) was not located, nor a definition of axes consistent between sources. If formal attribution is needed, consult Gartner's library under subscription. Do not invent the citation.
- The "R"s: confirm AWS's current list verbatim in their prescriptive guidance and, if attributed to Gartner, use the original 2011 list (rehost, refactor, revise, rebuild, replace). Not confirmed verbatim in this pass.
- Tools: status, licence and pricing of LeanIX / Ardoq / Bizzdesign — gap: none
publishes pricing; a per-application model in LeanIX and Ardoq, to be confirmed in a quote.
Archi's licence verified in raw (MIT,
License.txtin the repository). - Build Your Own Radar: AGPL-3.0 licence and current rings (
caution, nothold), confirmed as of Aug 2026; re-verify before forking. - Evidence on external approval: read the cited DORA/Accelerate report in its primary source before reproducing any figure. The 2.6× figure is discarded as unverifiable against the source it is attributed to.
- Figures for "percentage of organisations adopting framework X" and "failure rate of transformation programmes": discarded by default; used only with a primary study and accessible methodology.
If the web contradicts this document, the web wins — flag the discrepancy.