Acceptance Orchestrator
Overview
Orchestrate coding work as a state machine that ends only when acceptance criteria are verified with evidence or the task is explicitly escalated.
Core rule: do not optimize for "code changed"; optimize for "DoD proven".
When to Use
- The task already has an issue or clear acceptance criteria and should run end-to-end with minimal human re-intervention.
- You need structured handoff across implementation, review, deployment, and final verification.
- You want explicit stop conditions and escalation instead of silent partial completion.
Required Sub-Skills
create-issue-gate
closed-loop-delivery
verification-before-completion
Optional supporting skills:
deploy-dev
pr-watch
pr-review-autopilot
git-ship
Inputs
Require these inputs:
- issue id or issue body
- issue status
- acceptance criteria (DoD)
- target environment (
dev default)
Fixed defaults:
- max iteration rounds =
2
- PR review polling =
3m -> 6m -> 10m
State Machine
intake
issue-gated
executing
review-loop
deploy-verify
accepted
escalated
Workflow
Intake
- Read issue and extract task goal + DoD.
Issue gate
- Use
create-issue-gate logic.
- If issue is not
ready or execution gate is not allowed, stop immediately.
- Do not implement anything while issue remains
draft.
Execute
- Hand off to
closed-loop-delivery for implementation and local verification.
Review loop
- If PR feedback is relevant, batch polling windows as:
- After the
10m round, stop waiting and process all visible comments together.
Deploy and runtime verification
- If DoD depends on runtime behavior, deploy only to
dev by default.
- Verify with real logs/API/Lambda behavior, not assumptions.
Completion gate
- Before any claim of completion, require
verification-before-completion.
- No success claim without fresh evidence.
Stop Conditions
Move to accepted only when every acceptance criterion has matching evidence.
Move to escalated when any of these happen:
- DoD still fails after
2 full rounds
- missing secrets/permissions/external dependency blocks progress
- task needs production action or destructive operation approval
- review instructions conflict and cannot both be satisfied
Human Gates
Always stop for human confirmation on:
- prod/stage deploys beyond agreed scope
- destructive git/data operations
- billing or security posture changes
- missing user-provided acceptance criteria
Output Contract
When reporting status, always include:
Status: intake / executing / accepted / escalated
Acceptance Criteria: pass/fail checklist
Evidence: commands, logs, API results, or runtime proof
Open Risks: anything still uncertain
Need Human Input: smallest next decision, if blocked
Do not report "done" unless status is accepted.
Example
User request:
Take this issue and its acceptance criteria through implementation, validation, review, and a final evidence-backed verdict.
Limitations
- Use this skill only when the task clearly matches the scope described above.
- Do not treat the output as a substitute for environment-specific validation, testing, or expert review.
- Stop and ask for clarification if required inputs, permissions, safety boundaries, or success criteria are missing.
1---2name: acceptance-orchestrator3description: Use when a coding task should be driven end-to-end from issue intake through implementation, review, deployment, and acceptance verification with minimal human re-intervention. 4category: AI & Agents5source: antigravity6tags: [api, ai, workflow, security, cro]7url: https://github.com/sickn33/antigravity-awesome-skills/tree/main/skills/acceptance-orchestrator8metadata:9 source: https://skillmd.com/skills/sickn33/acceptance-orchestrator10---111213# Acceptance Orchestrator1415## Overview1617Orchestrate coding work as a state machine that ends only when acceptance criteria are verified with evidence or the task is explicitly escalated.1819Core rule: **do not optimize for "code changed"; optimize for "DoD proven".**2021## When to Use22- The task already has an issue or clear acceptance criteria and should run end-to-end with minimal human re-intervention.23- You need structured handoff across implementation, review, deployment, and final verification.24- You want explicit stop conditions and escalation instead of silent partial completion.2526## Required Sub-Skills2728- `create-issue-gate`29- `closed-loop-delivery`30- `verification-before-completion`3132Optional supporting skills:33- `deploy-dev`34- `pr-watch`35- `pr-review-autopilot`36- `git-ship`3738## Inputs3940Require these inputs:41- issue id or issue body42- issue status43- acceptance criteria (DoD)44- target environment (`dev` default)4546Fixed defaults:47- max iteration rounds = `2`48- PR review polling = `3m -> 6m -> 10m`4950## State Machine5152- `intake`53- `issue-gated`54- `executing`55- `review-loop`56- `deploy-verify`57- `accepted`58- `escalated`5960## Workflow61621. **Intake**63 - Read issue and extract task goal + DoD.64652. **Issue gate**66 - Use `create-issue-gate` logic.67 - If issue is not `ready` or execution gate is not `allowed`, stop immediately.68 - Do not implement anything while issue remains `draft`.69703. **Execute**71 - Hand off to `closed-loop-delivery` for implementation and local verification.72734. **Review loop**74 - If PR feedback is relevant, batch polling windows as:75 - wait `3m`76 - then `6m`77 - then `10m`78 - After the `10m` round, stop waiting and process all visible comments together.79805. **Deploy and runtime verification**81 - If DoD depends on runtime behavior, deploy only to `dev` by default.82 - Verify with real logs/API/Lambda behavior, not assumptions.83846. **Completion gate**85 - Before any claim of completion, require `verification-before-completion`.86 - No success claim without fresh evidence.8788## Stop Conditions8990Move to `accepted` only when every acceptance criterion has matching evidence.9192Move to `escalated` when any of these happen:93- DoD still fails after `2` full rounds94- missing secrets/permissions/external dependency blocks progress95- task needs production action or destructive operation approval96- review instructions conflict and cannot both be satisfied9798## Human Gates99100Always stop for human confirmation on:101- prod/stage deploys beyond agreed scope102- destructive git/data operations103- billing or security posture changes104- missing user-provided acceptance criteria105106## Output Contract107108When reporting status, always include:109- `Status`: intake / executing / accepted / escalated110- `Acceptance Criteria`: pass/fail checklist111- `Evidence`: commands, logs, API results, or runtime proof112- `Open Risks`: anything still uncertain113- `Need Human Input`: smallest next decision, if blocked114115Do not report "done" unless status is `accepted`.116117## Example118119**User request:**120121> Take this issue and its acceptance criteria through implementation, validation, review, and a final evidence-backed verdict.122123## Limitations124- Use this skill only when the task clearly matches the scope described above.125- Do not treat the output as a substitute for environment-specific validation, testing, or expert review.126- Stop and ask for clarification if required inputs, permissions, safety boundaries, or success criteria are missing.