Weekly Review
The weekly review is the maintenance ritual that keeps a productivity system trustworthy. Skip it two weeks in a row and the lists go stale, the brain stops trusting them, and everything moves back into working memory - which is the exact failure the system existed to prevent. Run it as a repeatable checklist at a fixed time, not as a guilt session, and it takes 60-90 minutes to buy a week of clear-headed execution.
Operating procedure
The three phases run in this order because each depends on the last: you cannot audit projects honestly (get current) while unprocessed inputs hide commitments (get clear), and you cannot pick next week's outcomes (get ahead) from a project list you have not audited.
Step 1: gather inputs (5 minutes)
Collect before starting; if the user cannot produce one, note it as a gap in their system and continue.
- The list of inboxes. Default set: email, chat, notes app, task-manager inbox, physical desk/papers. If they name fewer than three, ask where meeting commitments land - there is almost always a hidden inbox.
- The project list, waiting-for list, and someday/maybe list.
- The calendar, last week through two weeks ahead.
- Last week's plan, if one exists. If none exists, say so plainly and build the first one this session.
If the user estimates anything ("I think I have about 10 open projects"), label it a guess and verify during Phase B.
Phase A - Get clear (25-30 minutes)
- Empty every inbox to zero. Process each item to one of four decisions: do (under 2 minutes - do it now), defer (put on the calendar or task list with a next action), delegate (hand off and add to waiting-for), or drop. Inbox zero means every item has a decision, not that every item is done.
- Run a 5-minute mind sweep: capture anything the head is still holding - promises made in hallways, nagging worries, ideas. Write, don't evaluate.
Phase B - Get current (20-30 minutes)
- Scan the calendar backward over last week for loose ends: meetings that produced commitments never captured, follow-ups owed.
- Scan the calendar forward two weeks for anything that needs prep. Two weeks, not one - one week gives no runway for prep that itself takes days.
- Walk the project list. Every open project must have a concrete next action; a project without one is stalled by definition, whatever its status field says.
- Walk the waiting-for list. Nudge anything with no response for more than a week. Delete items that no longer matter.
Phase C - Get ahead (10-15 minutes)
- Pick the 3-5 outcomes that would make next week a win. Hard cap at 5 - a list of eight priorities is a list of zero priorities.
- Block calendar time for the most important outcome, not the most urgent, and place its first block before Wednesday. Deep-focus blocks that land on Friday get eaten. For heavier time-block design, pair with deep-work-planner.
- Scan someday/maybe and activate at most one item. Activating more than one per week silently inflates the project list.
- End with a short written Monday plan: the 3-5 outcomes, the first calendar block for each, and the single most important thing to start Monday morning.
Concrete thresholds
- Full review: 60-90 minutes. Consistently over 2 hours means the system is too complex or the review too infrequent - fix the system (gtd-system), don't lengthen the ritual.
- Missing two consecutive weeks is the trust-collapse threshold. When time is short, shrink instead of skipping: the 20-minute minimum is inboxes to zero, calendar scan, pick 3 outcomes.
- Waiting-for nudge line: 7 days without a response.
- Calendar lookahead: 2 weeks. Outcome cap: 5. Someday/maybe activation cap: 1 per week.
Template: weekly review record
Copy, fill, and keep in the same document week over week - the running history is what makes patterns visible.
WEEKLY REVIEW - week of [FILL: date]
GET CLEAR
Inboxes emptied: [FILL: list] - all to zero? yes / no
Mind sweep captures: [FILL: count] items
GET CURRENT
Loose ends from last week: [FILL]
Prep needed (next 2 weeks): [FILL]
Projects without a next action (now fixed): [FILL: count]
Waiting-for items nudged: [FILL]
GET AHEAD - next week's 3-5 outcomes
1. [FILL: outcome] - first block: [FILL: day/time]
2. [FILL] - first block: [FILL]
3. [FILL] - first block: [FILL]
Someday/maybe activated (max 1): [FILL or none]
HONESTY LINE
What didn't happen last week and why (one sentence, no self-flagellation):
[FILL]
MONDAY: start with [FILL: one thing]
Deliverable
Produce a completed weekly review record containing: confirmation every inbox reached zero, the fixed project and waiting-for lists, the 3-5 named outcomes each with a calendar block before Wednesday where possible, the one-sentence honesty line about last week, and the Monday starting action.
Do NOT
- Do not turn the review into doing the work. Two-minute items get done; everything else gets a decision and a slot. A review that runs 4 hours because you answered email is not a review.
- Do not let the honesty line become a guilt session. One sentence on what slipped and why, then adjust the plan - piling on erodes the habit that keeps the system alive.
- Do not pick outcomes by urgency. Urgent items already defend themselves; the review exists to protect the important ones.
- Do not skip Phase A to "save time". Auditing projects on top of unprocessed inboxes produces a plan missing the commitments hiding in email.
- Do not rebuild the system mid-review. Note friction, finish the review, then fix the system separately with gtd-system.
Quality bar
A finished review passes only when all hold:
- Every inbox is at zero (decisions made, not necessarily done).
- Every open project has a written next action.
- Next week has 3-5 outcomes, no more, each with a first calendar block.
- The honesty line exists and names a cause, not just a miss.
- The whole thing fit inside 90 minutes - or the gap is logged as a system problem.
1---2name: weekly-review3description: Runs a timeboxed weekly review - empty every inbox to a decision, audit every open commitment, and pick the 3-5 outcomes that define next week. Use when someone asks "walk me through a weekly review", "help me plan my week", "my task system feels stale and I don't trust it", or "I keep dropping commitments". Do NOT use for setting up the underlying capture-and-organize system itself - use gtd-system instead - or for tracking long-horizon personal goals with an accountability loop - use goals-accountability instead.4---56# Weekly Review78The weekly review is the maintenance ritual that keeps a productivity system trustworthy. Skip it two weeks in a row and the lists go stale, the brain stops trusting them, and everything moves back into working memory - which is the exact failure the system existed to prevent. Run it as a repeatable checklist at a fixed time, not as a guilt session, and it takes 60-90 minutes to buy a week of clear-headed execution.910## Operating procedure1112The three phases run in this order because each depends on the last: you cannot audit projects honestly (get current) while unprocessed inputs hide commitments (get clear), and you cannot pick next week's outcomes (get ahead) from a project list you have not audited.1314### Step 1: gather inputs (5 minutes)1516Collect before starting; if the user cannot produce one, note it as a gap in their system and continue.1718- The list of inboxes. Default set: email, chat, notes app, task-manager inbox, physical desk/papers. If they name fewer than three, ask where meeting commitments land - there is almost always a hidden inbox.19- The project list, waiting-for list, and someday/maybe list.20- The calendar, last week through two weeks ahead.21- Last week's plan, if one exists. If none exists, say so plainly and build the first one this session.2223If the user estimates anything ("I think I have about 10 open projects"), label it a guess and verify during Phase B.2425### Phase A - Get clear (25-30 minutes)26271. Empty every inbox to zero. Process each item to one of four decisions: do (under 2 minutes - do it now), defer (put on the calendar or task list with a next action), delegate (hand off and add to waiting-for), or drop. Inbox zero means every item has a decision, not that every item is done.282. Run a 5-minute mind sweep: capture anything the head is still holding - promises made in hallways, nagging worries, ideas. Write, don't evaluate.2930### Phase B - Get current (20-30 minutes)31321. Scan the calendar backward over last week for loose ends: meetings that produced commitments never captured, follow-ups owed.332. Scan the calendar forward two weeks for anything that needs prep. Two weeks, not one - one week gives no runway for prep that itself takes days.343. Walk the project list. Every open project must have a concrete next action; a project without one is stalled by definition, whatever its status field says.354. Walk the waiting-for list. Nudge anything with no response for more than a week. Delete items that no longer matter.3637### Phase C - Get ahead (10-15 minutes)38391. Pick the 3-5 outcomes that would make next week a win. Hard cap at 5 - a list of eight priorities is a list of zero priorities.402. Block calendar time for the most important outcome, not the most urgent, and place its first block before Wednesday. Deep-focus blocks that land on Friday get eaten. For heavier time-block design, pair with deep-work-planner.413. Scan someday/maybe and activate at most one item. Activating more than one per week silently inflates the project list.424. End with a short written Monday plan: the 3-5 outcomes, the first calendar block for each, and the single most important thing to start Monday morning.4344## Concrete thresholds4546- Full review: 60-90 minutes. Consistently over 2 hours means the system is too complex or the review too infrequent - fix the system (gtd-system), don't lengthen the ritual.47- Missing two consecutive weeks is the trust-collapse threshold. When time is short, shrink instead of skipping: the 20-minute minimum is inboxes to zero, calendar scan, pick 3 outcomes.48- Waiting-for nudge line: 7 days without a response.49- Calendar lookahead: 2 weeks. Outcome cap: 5. Someday/maybe activation cap: 1 per week.5051## Template: weekly review record5253Copy, fill, and keep in the same document week over week - the running history is what makes patterns visible.5455```56WEEKLY REVIEW - week of [FILL: date]5758GET CLEAR59 Inboxes emptied: [FILL: list] - all to zero? yes / no60 Mind sweep captures: [FILL: count] items6162GET CURRENT63 Loose ends from last week: [FILL]64 Prep needed (next 2 weeks): [FILL]65 Projects without a next action (now fixed): [FILL: count]66 Waiting-for items nudged: [FILL]6768GET AHEAD - next week's 3-5 outcomes69 1. [FILL: outcome] - first block: [FILL: day/time]70 2. [FILL] - first block: [FILL]71 3. [FILL] - first block: [FILL]72 Someday/maybe activated (max 1): [FILL or none]7374HONESTY LINE75 What didn't happen last week and why (one sentence, no self-flagellation):76 [FILL]7778MONDAY: start with [FILL: one thing]79```8081## Deliverable8283Produce a completed weekly review record containing: confirmation every inbox reached zero, the fixed project and waiting-for lists, the 3-5 named outcomes each with a calendar block before Wednesday where possible, the one-sentence honesty line about last week, and the Monday starting action.8485## Do NOT8687- Do not turn the review into doing the work. Two-minute items get done; everything else gets a decision and a slot. A review that runs 4 hours because you answered email is not a review.88- Do not let the honesty line become a guilt session. One sentence on what slipped and why, then adjust the plan - piling on erodes the habit that keeps the system alive.89- Do not pick outcomes by urgency. Urgent items already defend themselves; the review exists to protect the important ones.90- Do not skip Phase A to "save time". Auditing projects on top of unprocessed inboxes produces a plan missing the commitments hiding in email.91- Do not rebuild the system mid-review. Note friction, finish the review, then fix the system separately with gtd-system.9293## Quality bar9495A finished review passes only when all hold:9697- Every inbox is at zero (decisions made, not necessarily done).98- Every open project has a written next action.99- Next week has 3-5 outcomes, no more, each with a first calendar block.100- The honesty line exists and names a cause, not just a miss.101- The whole thing fit inside 90 minutes - or the gap is logged as a system problem.