Home Contractor Quote Decoder Skill
The most expensive number in a renovation quote is usually one that isn't there: the allowance that runs out, the exclusion that becomes a change order, the "TBD" that becomes time-and-materials. This skill decodes the quote the way a construction manager reads a bid — hunting the gaps between what's written and what the finished job requires — and turns three incomparable bids into one comparable question set. It reads documents; it doesn't judge workmanship.
What This Skill Produces
- A section-by-section decode: scope, materials, allowances, exclusions, schedule, payment terms
- The allowance audit — every allowance vs. what that item realistically requires, flagged where it's a teaser
- The exclusion-to-change-order map: what's not in this price that the finished job will need
- Payment-schedule risk read, and the question set that makes competing bids comparable
Required Inputs
Ask for these only if they aren't already provided:
- The quote/contract text — full document preferred; decode what's provided and name the missing sections (a one-page quote for a $60k job is itself a finding).
- The project as the homeowner understands it — what "done" looks like to them; the decode hunts the gap between their "done" and the document's.
- Competing bids if any — the decode aligns them line by line.
- Jurisdictional context if known — permits and lien rules vary; flagged, not asserted.
Framework: Severity Scale
- 🔴 Resolve before signing — allowances materially below what the selected-grade item costs (a $2,000 cabinet allowance in a kitchen remodel is a placeholder wearing a price), scope described by outcome without specification ("renovate bathroom" vs. itemized work), exclusions of things the job obviously requires (disposal, permits, patching, paint), front-loaded payment schedules (large deposit + payments ahead of completed work — where jurisdiction caps deposits, flag it as verify-locally), no change-order process in writing, "contractor not responsible for" lists covering the likeliest damage, no lien-waiver provision on jobs with subs.
- 🟡 Clarify — the comparability killers — materials by allowance in one bid and by specification in another (why bid A "costs less"), timeline without milestones or a start-window commitment, warranty terms undefined (labor vs. materials, duration), cleanup/protection unstated, who pulls permits (the answer "you do" shifts liability — flag it).
- 🟢 Standard — itemized scope, realistic allowances tied to named grades, progress payments tied to completed milestones, written change-order pricing; label a good quote as good.
The core move is the finished-job reconciliation: list what the completed project requires end to end, then find each item in the quote — priced, allowanced, excluded, or silent. Silent items are the future change orders; price the gap.
Output Format
Contractor Quote Decode: [project — contractor, amount]
1. The verdict — the real expected cost range (quote + likely allowance overages + silent items), in three sentences.
2. Section decode
| Section |
What it says |
What it means / what's missing |
Severity |
3. The allowance audit — each allowance vs. realistic cost at the homeowner's stated grade; the overage subtotal.
4. The silent-items list — required by the finished job, absent from the document; each one a future change order.
5. Payment schedule read — money vs. completed work over time; where the homeowner is exposed; the milestone-tied restructure to request.
6. Making bids comparable — the question set to send every bidder so the numbers finally mean the same thing.
End the artifact with, verbatim: "This is a plain-language reading, not legal/financial advice — laws vary by jurisdiction; confirm anything load-bearing with a qualified professional."
Quality Checks
Anti-Patterns
Based On
Owner-side bid review practice — finished-job reconciliation, allowance auditing, payment-risk sequencing, bid leveling.
Example Trigger Phrases
- "Is this contractor quote fair?"
- "Decode this renovation bid."
- "What should be in a contractor contract?"
- "Why do these three bids differ so much?"
1---2name: home-contractor-quote-decoder3description: "Decode a home renovation or repair quote — allowances that aren't prices, exclusions that become change orders, payment schedules that shift risk, and what a comparable-bids check should cover. Use when someone asks 'is this contractor quote fair', 'decode this renovation bid', 'what should be in a contractor contract', or 'why do these three bids differ so much'. Produces a section-by-section decode, the allowance and exclusion audit, payment-schedule risk analysis, and the questions that make bids comparable."4disable-model-invocation: true # skill-optimizer5metadata:6 source: https://skillmd.com/skills/slipcast-dev/home-contractor-quote-decoder7---89# Home Contractor Quote Decoder Skill1011The most expensive number in a renovation quote is usually one that isn't there: the allowance that runs out, the exclusion that becomes a change order, the "TBD" that becomes time-and-materials. This skill decodes the quote the way a construction manager reads a bid — hunting the gaps between what's written and what the finished job requires — and turns three incomparable bids into one comparable question set. It reads documents; it doesn't judge workmanship.1213## What This Skill Produces1415- A section-by-section decode: scope, materials, allowances, exclusions, schedule, payment terms16- The allowance audit — every allowance vs. what that item realistically requires, flagged where it's a teaser17- The exclusion-to-change-order map: what's not in this price that the finished job will need18- Payment-schedule risk read, and the question set that makes competing bids comparable1920## Required Inputs2122Ask for these only if they aren't already provided:2324- **The quote/contract text** — full document preferred; decode what's provided and name the missing sections (a one-page quote for a $60k job is itself a finding).25- **The project as the homeowner understands it** — what "done" looks like to them; the decode hunts the gap between their "done" and the document's.26- **Competing bids** if any — the decode aligns them line by line.27- **Jurisdictional context** if known — permits and lien rules vary; flagged, not asserted.2829## Framework: Severity Scale3031- 🔴 **Resolve before signing** — allowances materially below what the selected-grade item costs (a $2,000 cabinet allowance in a kitchen remodel is a placeholder wearing a price), scope described by outcome without specification ("renovate bathroom" vs. itemized work), exclusions of things the job obviously requires (disposal, permits, patching, paint), front-loaded payment schedules (large deposit + payments ahead of completed work — where jurisdiction caps deposits, flag it as verify-locally), no change-order process in writing, "contractor not responsible for" lists covering the likeliest damage, no lien-waiver provision on jobs with subs.32- 🟡 **Clarify — the comparability killers** — materials by allowance in one bid and by specification in another (why bid A "costs less"), timeline without milestones or a start-window commitment, warranty terms undefined (labor vs. materials, duration), cleanup/protection unstated, who pulls permits (the answer "you do" shifts liability — flag it).33- 🟢 **Standard** — itemized scope, realistic allowances tied to named grades, progress payments tied to completed milestones, written change-order pricing; label a good quote as good.3435The core move is the **finished-job reconciliation**: list what the *completed* project requires end to end, then find each item in the quote — priced, allowanced, excluded, or silent. Silent items are the future change orders; price the gap.3637## Output Format3839### Contractor Quote Decode: [project — contractor, amount]4041**1. The verdict** — the real expected cost range (quote + likely allowance overages + silent items), in three sentences.4243**2. Section decode**4445| Section | What it says | What it means / what's missing | Severity |46|---|---|---|---|4748**3. The allowance audit** — each allowance vs. realistic cost at the homeowner's stated grade; the overage subtotal.4950**4. The silent-items list** — required by the finished job, absent from the document; each one a future change order.5152**5. Payment schedule read** — money vs. completed work over time; where the homeowner is exposed; the milestone-tied restructure to request.5354**6. Making bids comparable** — the question set to send every bidder so the numbers finally mean the same thing.5556End the artifact with, verbatim: *"This is a plain-language reading, not legal/financial advice — laws vary by jurisdiction; confirm anything load-bearing with a qualified professional."*5758## Quality Checks5960- [ ] Every allowance is audited against the homeowner's stated grade, with the overage totaled61- [ ] The finished-job reconciliation produces an explicit silent-items list62- [ ] Payment-schedule exposure is shown as money-ahead-of-work over time63- [ ] Jurisdiction-dependent items (deposit caps, permits, liens) are flagged verify-locally64- [ ] Bid comparisons align scope first, price second65- [ ] The disclaimer line appears verbatim in the artifact6667## Anti-Patterns6869- [ ] Do not judge the contractor's quality or honesty — decode the document; references and licensing checks are separate homework (name them)70- [ ] Do not treat the lowest bid as the best or the worst — un-specified scope explains most bid gaps; make it comparable first71- [ ] Do not invent local costs or code requirements — ranges to verify, not facts72- [ ] Do not soften the allowance finding — a teaser allowance is the oldest trick in the bid73- [ ] Do not let "we'll figure it out as we go" stand anywhere money is involved — that sentence is a time-and-materials contract in disguise7475## Based On7677Owner-side bid review practice — finished-job reconciliation, allowance auditing, payment-risk sequencing, bid leveling.7879## Example Trigger Phrases8081- "Is this contractor quote fair?"82- "Decode this renovation bid."83- "What should be in a contractor contract?"84- "Why do these three bids differ so much?"