Trade Quote Builder Skill
Most trade quotes lose money in the writing, not the doing: labor guessed
optimistic, materials priced from memory, and — the killer — no exclusions
line, so "while you're here, could you also…" becomes free work. A
professional quote is two documents: the internal costing sheet (honest hours
× real rate + materials + margin) and the customer's one-pager (clear scope,
what's included, what isn't, how variations get priced). This skill builds
both, and it prices the variation rule in advance — because the profitable
jobs are the ones where "extra" was defined before it happened.
What This Skill Produces
- The internal costing sheet: labor (tasks × honest hours × rate),
materials with waste factor, plant/access costs, margin — the math the
customer never sees but the price depends on
- The customer quote, one page: scope in plain words, itemized or
fixed-price sections, inclusions, exclusions (the load-bearing
paragraph), variation rule, validity window, payment terms pointer
- A fixed-vs-day-rate recommendation for this specific job with the
reasoning (unknowns push day-rate; defined scope earns fixed)
- The assumption flags: what was priced sight-unseen and what a site
visit must confirm
Required Inputs
Ask for (if not already provided):
- The job as the customer described it, plus what the tradesperson saw/knows
(photos described, site visit notes, access issues)
- Their real numbers: hourly/day rate they need (not the one they say when
nervous), typical material suppliers, travel distance
- The unknowns: what can't be known until opened up (walls, boards, wiring)
- Local context: is this a price-sensitive job or a reputation job?
Framework
- Cost the job backwards from the tasks. Break the work into visible
tasks, each with honest hours (add the forgotten ones: setup, protection,
cleanup, disposal runs, the merchant trip). Optimism in hours is the #1
margin leak — challenge any task estimated in round afternoons.
- Materials at today's prices + waste. List materials with a waste
factor (10–15% typical for boards/tiles; note it, don't hide it) and
"prices held for X days" — supplier prices move; the validity window is
protection, not decoration.
- Write the exclusions like they'll be tested. They will. Standard set:
anything not listed in scope · faults discovered once opened up (priced
as variation) · moving furniture/other trades' work · parking/permits.
Specific beats general: "excludes repairs to joists found rotten" wins
arguments "excludes unforeseen work" loses.
- Price variations by rule, in the quote. "Additional work agreed in
writing at £X/hour + materials before it starts." This single line
converts scope creep from a fight into a form.
- Layout for trust. Business name/contact · scope · price (itemized or
fixed with sections) · inclusions/exclusions · variation rule · validity
· payment terms (see [[stage-payment-shield]]) · insurance/certification
lines where the trade has them. Flag: certification claims must be real —
never draft one the user didn't state.
Output Format
## Internal costing (yours only)
| Task | Hours | Rate | Labor | ‖ Materials | Qty+waste | Cost |
Subtotals · margin % · price floor: [the number below which this job loses]
## The quote (send this)
[One page, structured as above, in plain confident language]
## Fixed vs day rate for THIS job
[Recommendation + why · which unknowns would flip it]
## Confirm before starting
[The sight-unseen assumptions a site visit must check]
Quality Checks
Anti-Patterns
Related
[[stage-payment-shield]] for deposits and payment stages;
[[home-contractor-quote-decoder]] is the customer's side of this table —
write quotes that survive it; [[late-invoice-escalation]] for afterwards.
Example Trigger Phrases
- "Help me quote this job."
- "I keep losing money on jobs."
- "How do I quote a day rate vs fixed?"
1---2name: trade-quote-builder3description: "Build a trade quote that wins the job and protects the margin — materials and labor itemized, assumptions and exclusions stated, variations priced by rule, and the professional one-page layout customers trust. Use when a tradesperson says 'help me quote this job', 'I keep losing money on jobs', 'customer wants a price for X', or 'how do I quote a day rate vs fixed'. Produces a ready-to-send quote plus the internal costing sheet behind it."4disable-model-invocation: true # skill-optimizer5metadata:6 source: https://skillmd.com/skills/slipcast-dev/trade-quote-builder7---89# Trade Quote Builder Skill1011Most trade quotes lose money in the writing, not the doing: labor guessed12optimistic, materials priced from memory, and — the killer — no exclusions13line, so "while you're here, could you also…" becomes free work. A14professional quote is two documents: the internal costing sheet (honest hours15× real rate + materials + margin) and the customer's one-pager (clear scope,16what's included, what isn't, how variations get priced). This skill builds17both, and it prices the *variation rule* in advance — because the profitable18jobs are the ones where "extra" was defined before it happened.1920## What This Skill Produces2122- The **internal costing sheet**: labor (tasks × honest hours × rate),23 materials with waste factor, plant/access costs, margin — the math the24 customer never sees but the price depends on25- The **customer quote**, one page: scope in plain words, itemized or26 fixed-price sections, inclusions, **exclusions** (the load-bearing27 paragraph), variation rule, validity window, payment terms pointer28- A **fixed-vs-day-rate recommendation** for this specific job with the29 reasoning (unknowns push day-rate; defined scope earns fixed)30- The **assumption flags**: what was priced sight-unseen and what a site31 visit must confirm3233## Required Inputs3435Ask for (if not already provided):36- The job as the customer described it, plus what the tradesperson saw/knows37 (photos described, site visit notes, access issues)38- Their real numbers: hourly/day rate they need (not the one they say when39 nervous), typical material suppliers, travel distance40- The unknowns: what can't be known until opened up (walls, boards, wiring)41- Local context: is this a price-sensitive job or a reputation job?4243## Framework44451. **Cost the job backwards from the tasks.** Break the work into visible46 tasks, each with honest hours (add the forgotten ones: setup, protection,47 cleanup, disposal runs, the merchant trip). Optimism in hours is the #148 margin leak — challenge any task estimated in round afternoons.492. **Materials at today's prices + waste.** List materials with a waste50 factor (10–15% typical for boards/tiles; note it, don't hide it) and51 "prices held for X days" — supplier prices move; the validity window is52 protection, not decoration.533. **Write the exclusions like they'll be tested.** They will. Standard set:54 anything not listed in scope · faults discovered once opened up (priced55 as variation) · moving furniture/other trades' work · parking/permits.56 Specific beats general: "excludes repairs to joists found rotten" wins57 arguments "excludes unforeseen work" loses.584. **Price variations by rule, in the quote.** "Additional work agreed in59 writing at £X/hour + materials before it starts." This single line60 converts scope creep from a fight into a form.615. **Layout for trust.** Business name/contact · scope · price (itemized or62 fixed with sections) · inclusions/exclusions · variation rule · validity63 · payment terms (see [[stage-payment-shield]]) · insurance/certification64 lines where the trade has them. Flag: certification claims must be real —65 never draft one the user didn't state.6667## Output Format6869```70## Internal costing (yours only)71| Task | Hours | Rate | Labor | ‖ Materials | Qty+waste | Cost |72Subtotals · margin % · price floor: [the number below which this job loses]7374## The quote (send this)75[One page, structured as above, in plain confident language]7677## Fixed vs day rate for THIS job78[Recommendation + why · which unknowns would flip it]7980## Confirm before starting81[The sight-unseen assumptions a site visit must check]82```8384## Quality Checks8586- [ ] Every task's hours include setup/cleanup/disposal — the forgotten87 hours are named individually88- [ ] The exclusions section is specific to this job, not boilerplate alone89- [ ] The variation rule appears with a real rate and "in writing before it90 starts"91- [ ] The price floor is computed and stated internally — the user knows the92 number below which walking away wins93- [ ] No certifications, insurance, or guarantee claims invented — only what94 the user stated goes on the quote9596## Anti-Patterns9798- [ ] Do not price to win by shaving hours — the costing sheet is honest even99 when the final price discounts; know what the discount costs100- [ ] Do not bury exclusions in small print tone — they're customer-facing101 clarity, not gotchas102- [ ] Do not quote firm on sight-unseen unknowns; that's what assumption103 flags and variations are for104- [ ] Do not use legalistic language a homeowner distrusts — plain and firm105 wins jobs106107## Related108109[[stage-payment-shield]] for deposits and payment stages;110[[home-contractor-quote-decoder]] is the customer's side of this table —111write quotes that survive it; [[late-invoice-escalation]] for afterwards.112113## Example Trigger Phrases114115- "Help me quote this job."116- "I keep losing money on jobs."117- "How do I quote a day rate vs fixed?"