Deliver — a delivery is proven by its effect
cadence deliver reads cadence.yaml at the repository root:
deliver:
ci: github # github | none | { command: "…" }
deploy:
- ./scripts/deploy.sh "$CADENCE_SHORT"
verify:
- url: https://app.example.com/api/health
- url: https://app.example.com/
contains: "${SHORT}" # the new version is the one being served
A project that already has its own delivery script declares it instead — cadence then keeps the preconditions, the lock, the log and the delivered lots, and the script keeps the CI wait, the deploy and its business checks:
deliver:
script: ./scripts/ship.sh "$CADENCE_SHORT"
Without a deliver: key in cadence.yaml (or without the file), cadence deliver refuses (« clé deliver absente »; « pas de configuration de livraison » when the file is missing) before any step: it never looks for or runs a ./livrer.sh on its own, so declare it with deliver: { script: … } first.
A script that deploys a commit other than $CADENCE_SHA (it committed a Nouveautés timestamp itself)
writes that sha into the file named by $CADENCE_DEPLOYED_FILE: cadence logs it as delivered and never guesses
(a content that is not a hexadecimal commit sha — HEAD or a branch name included — fails the delivery; empty during a wave, the log keeps $CADENCE_SHA and a warning
says the head moved).
Its arguments go after --: cadence deliver -- api frontend (--sha <rev> to deliver a commit
other than HEAD, see « Delivering a commit that is not HEAD »). Ask the human (or the project's own
delivery skill) which arguments this delivery needs; never guess them.
Delivering a commit that is not HEAD
When HEAD holds work that must not ship and an earlier commit must, push that sha alone first, then deliver it:
git push origin <sha>:main
cadence deliver --dry-run --sha <sha>
cadence deliver --sha <sha>
The order matters. With ci: github, cadence waits for the run of that exact sha, and GitHub only
builds the tip of a push: a sha that was never pushed as the tip has no run to wait for. Pushing HEAD
instead would ship the unfinished work; never reset HEAD to get there.
The push targets the branch being delivered (main here). Two cases where it does not apply:
- The sha is already on a remote branch: skip the push, it is useless. A sha that was pushed earlier has a CI run only if it was the tip of a push; if it never was, no run exists to wait for.
- The push is refused as non-fast-forward (the sha is not a descendant of
origin/main, ororigin/mainhas moved past it): never force it,--forcewould rewind the remote branch. The sha cannot be delivered that way: stop and ask the human.
The sha pushed needs a green verdict of the gate (L426). Where the project declares a gate (orchestrate.test or
orchestrate.build), the pre-push hook a wave installs, and the gate-only hook it leaves behind, refuse with exit 3 a push
of a branch whose local sha has no green verdict of cadence verify --gate; the message names the sha and the command. The
lot's sha the lead re-checked has one, and a commit above it that changes only the plan takes it (L432); a release commit or a plan commit that also touches another file has none, and the wave's record does not cover it:
run cadence verify --gate --sha <sha> on the very sha you push (a full replay for such a commit, ~5 minutes) before the
push, HEAD included when you push main. CADENCE_PUSH_UNGATED=1 git push … lets a push through with no verdict and says so
on stderr: only when the human asks for it, never the routine.
Where to run
Every cadence / raf command works on the git repository of the current directory. When the
session runs from a parent folder that holds several projects (not itself a repository), run each
command inside the project concerned: cd <project> && cadence …. The projects are the sub-folders
that contain .cadence/raf.yaml or docs/plan/raf.yaml, or a cadence.yaml with a plan: key.
Deliver one project at a time: the one the human names, or ask.
Steps
- Before anything: tests and build green locally, everything committed and pushed — the CI can
only build what it has received, and
cadence deliverrefuses a sha that is not on a remote branch. cadence deliver --dry-run: read the resolved commands and checks. If there is nocadence.yaml, help write one: ask the human for the deploy command, and propose at least one check that proves the NEW version is live (a version string, a new endpoint), not merely that the site answers.cadence deliver. Exit codes: 0 delivered and verified, 1 a step failed, 2 refused before acting.- On failure: read which step failed and why. Fix the cause, commit, push, deliver again. Never rerun blindly, never skip a check to make it pass.
- On success:
raf done <id>(or the project's own tool when its plan is read-only) for the lots it lists whose effect you have seen; if one of them isvisible,cadence news buildand deliver the news too. With a read-only plan the list holds only the lots that were in progress when the delivery started; the project's own tool has the last word on what it marked delivered. - After a green delivery that changes what a page shows or what it is served (screen, API, data
source, configuration of either) — in practice every delivery except docs-, plan- or tests-only
ones — have the
qa-revieweragent walk the delivered app in a real browser, whether the lot isvisibleor not: give it the repository path, the base URL and the lot id. With a lot id, the agent walks only the pages the lot touched (the pages that call the changed endpoints, the pages of the changed screens, the pages that consume the services the lot changed, the home page; when the diff changes no route and no screen, or cannot be linked to pages, it walks every page and says so) and names the others under « Not walked »: they are not checked. It checks each page againstdocs/qa/expectations.md— what the user must find there — and reports a page left empty, an error shown, an API call that failed or came back empty: what the checks ofcadence.yamldo not see. Bring its blocking findings to the human. It is not a gate: the delivery stays done, a finding becomes a new lot.
Rules
- Never two deliveries at once: a second one can silently overwrite the first one's deploy. The lock enforces it; do not delete a live lock.