Purpose
project-decisions-log.md is an append-only history of locked decisions with rationale, alternatives, and SHA stamps. It exists so that:
- Future agents (or humans) can understand WHY past decisions were made
- Drift detection can compare current state to locked intent
- Retrospectives have evidence of decisions vs outcomes
- Reopening a decision requires explicit supersession, not silent override
This skill is the ONLY way to write to the log. Other skills invoke this one.
When to Run
Triggered by other skills at phase boundaries. The triggering skill provides:
- Phase name (e.g., "product-contract", "evidence-contract", "epic-plan", "story-plan")
- Decision title
- At least 3 alternatives considered + tradeoffs
- Chosen option + rationale
- Consequences accepted
If the calling skill provides fewer than 3 alternatives: REFUSE and tell the calling skill to run the skeptical-review primitive first.
Execution Steps
1. Locate or create the log
Find specs/projects/<PROJECT_ID>/project-decisions-log.md. If missing, create from template.
2. Generate next decision ID
Band selection (prevents number races under concurrent epic execution):
| Context | Band | Next ID rule |
|---|---|---|
Project-level phases (project-specify, product-contract, evidence-contract, project-plan, project-architecture, recheck) |
DEC-0001–DEC-0099 |
Max in DEC-0001…DEC-0099 + 1 |
Epic-level phases (epic-plan, epic-architecture, epic-specify, story-plan inside epic) |
DEC-{NN}01–DEC-{NN}99 |
{NN} = epic number from active epic ID (E002 → 02); max in band + 1 |
Detect active epic: cwd under epics/E###-* or caller-provided epic ID in $ARGUMENTS. If epic context is clear, use epic band even on epic/* branches.
Scan the log body for ### DEC-NNNN headings in the target band only (source of truth — do NOT rely solely on the index table). Next ID = monotonic max in band + 1.
- Project band empty → start
DEC-0001 - Epic
E002band empty → startDEC-0201(notDEC-0002) - Epic band exhausted (
DEC-{NN}99used) → STOP; escalate — band needs expansion or sequential merge
2b. Reconcile Decision Index table
If ## Decision Index is missing, out of sync, or has gaps:
- Parse all
### DEC-NNNNentries and their metadata (Date, Phase, Status from entry body). - Rebuild the index table under
## Decision Indexfrom parsed headings. - Preserve all
## Decisionsbody entries unchanged (append-only discipline).
If the index exists and is current, append one row for the new entry only.
3. Validate inputs
The caller (skill) provided:
- Phase ✅
- Decision title ✅
- At least 3 alternatives ✅
- Chosen option ✅
- Rationale ✅
If anything is missing or only 1-2 alternatives present: STOP. Tell the calling skill "Run skeptical-review with N≥3 alternatives first."
4. Capture context
- SHA at decision time:
git rev-parse --short HEAD - Date: today
- Owner: [AI agent / human / both]
5. Append the entry
Append to ## Decisions section. Do NOT modify any existing entry (other than updating Supersedes: on a superseded entry's Status field).
6. Update the index table
Add a row to the Decision Index table (or rebuild per step 2b if missing/stale).
7. Re-stamp the file
.speck/scripts/stamp-truth.sh specs/projects/<PROJECT_ID>/project-decisions-log.md
8. Report
Return to caller:
✅ DEC-NNNN logged: <title>
Behavior Rules
- NEVER assign global sequential DEC IDs when epic context is active — use the epic's band
- NEVER skip the SHA + date stamping
- NEVER allow fewer than 3 alternatives to be logged
- NEVER edit a locked decision; supersede instead
- ALWAYS update or rebuild the index table when appending (scan
### DEC-headings as source of truth) - ALWAYS re-stamp the file footer
Integration Points
Invoked by:
/project-specify(at project lock)/project-product-contract(paid promise, differentiator, magic moment locks)/project-evidence-contract(valid/invalid proof sources, gate criteria locks)/project-architecture(architectural pattern, tech stack locks)/project-plan(epic split decisions)/epic-plan(technical approach lock)/epic-architecture(cross-cutting decisions)/story-plan(significant technical choices only)/speck-recheck(decisions reopened by drift findings)- Any skill that runs the skeptical-review primitive