IROS Workflow
Use this as the project-management skill for an IROS submission. Replace every date with the current
official timetable and work backward from PaperPlaza cutoffs.
IROS is a conference, not a journal: it has no standing editor-in-chief and no article-processing charge.
It is co-sponsored by IEEE RAS and the Robotics Society of Japan (RSJ) — hence "IEEE/RSJ" — and the
organizing committee rotates yearly between regions, so re-check the current CFP and committee page
rather than carrying names or rules forward. The cost model is registration plus any per-page charge,
and proceedings go to IEEE Xplore.
The fall-venue rhythm (2026 shape)
IROS is the fall IEEE-RAS mega-venue, the seasonal counterpart to ICRA's spring cycle. The 2026
edition ran a spring submission into an autumn conference:
- Paper deadline in early spring (2026: March 2).
- Video attachment a few days later (2026: March 5) — a distinct cutoff, not tied to the paper.
- A long summer review silence, then notification in mid-June (2026: June 16).
- Camera-ready in July (2026: July 10), then the conference in late September/October (2026:
Sept 27 - Oct 1, Pittsburgh).
Knowing you are on the fall calendar changes routing: a project that misses IROS's spring deadline has
CoRL and the next ICRA as nearer alternatives than waiting a full IROS year.
Milestones
- Venue fit: confirm the contribution is an integrated intelligent system with credible robot evidence.
- Evidence lock: freeze the platform, task distribution, trial protocol, baselines, and the video plan.
- Paper deadline: upload the anonymous PDF (references counted in the page budget) and PaperPlaza fields.
- Video deadline: upload the ≤ 60 s / ≤ 10 MB attachment by its own cutoff.
- Review silence: nothing to do but keep the robot and logs intact for camera-ready.
- Notification: triage reviews; there is traditionally no rebuttal, so plan camera-ready edits instead.
- Camera-ready: de-anonymize, integrate meta-review asks, file the IEEE copyright form, register.
- Presentation: at least one author presents in person; prepare the talk and any live/updated video.
Backward plan from the paper deadline
| Weeks out (heuristic) |
Real-robot systems milestone |
| 10+ |
Platform frozen; task distribution and success criterion defined |
| 8 |
Baselines implemented on the same hardware for a fair comparison |
| 6 |
Main trials run, resets logged, failures categorized |
| 4 |
Sim-to-real study complete; the gap is a number, not a hope |
| 3 |
Full draft in IEEE two-column format; references budgeted as content |
| 2 |
Video footage banked from real sessions; rough 60 s cut assembled |
| 1 |
Anonymity sweep across PDF, figures, and video; PaperPlaza PINs collected |
| 0 |
Paper uploaded; video by its separate cutoff |
These offsets are planning heuristics only — anchor each to the current official timetable, never to a
previous cycle's calendar.
Failure modes by stage
- Filming on deadline week produces worse footage and worse anonymity than banking clips all along.
- Treating references as free space overruns the budget, because IROS counts them in.
- Assuming a rebuttal exists wastes the notification window; IROS traditionally ships reviews with the
decision, so the only lever is camera-ready.
- Letting the robot get reconfigured before camera-ready makes a requested extra trial impossible.
Coordination notes
- Assign one named owner for the video and one for the anonymity sweep; shared ownership is how both
slip.
- Archive the exact submitted PDF and video, since the camera-ready must trace to the reviewed version.
Output format
[Current stage] idea / experiments / writing / submission / video / review / notified / camera-ready
[Next official deadline] <date and source, or unknown>
[Critical path] <three tasks that determine readiness>
[Risk register] <page-budget/anonymity/robot-evidence/video/transfer>
[Owner map] <task -> person or role>
Source: brycewang-stanford/Awesome-Journal-Skills → IROS-Skills/skills/iros-workflow/SKILL.md
1---2name: iros-workflow3description: Use when planning an IROS project timeline from venue fit through the spring paper deadline, the separate video deadline, the summer review silence, the June notification, the July camera-ready, IEEE Xplore publication, registration, and presentation, with backward-planning offsets for a real-robot paper on the fall IEEE/RSJ calendar.4---5
6
7# IROS Workflow
8
9Use this as the project-management skill for an IROS submission. Replace every date with the current
10official timetable and work backward from PaperPlaza cutoffs.
11
12IROS is a conference, not a journal: it has no standing editor-in-chief and no article-processing charge.
13It is **co-sponsored by IEEE RAS and the Robotics Society of Japan (RSJ)** — hence "IEEE/RSJ" — and the
14organizing committee rotates yearly between regions, so re-check the current CFP and committee page
15rather than carrying names or rules forward. The cost model is registration plus any per-page charge,
16and proceedings go to IEEE Xplore.
17
18## The fall-venue rhythm (2026 shape)
19
20IROS is the **fall** IEEE-RAS mega-venue, the seasonal counterpart to ICRA's spring cycle. The 2026
21edition ran a spring submission into an autumn conference:
22
23- Paper deadline in **early spring** (2026: March 2).
24- Video attachment a few days later (2026: March 5) — a distinct cutoff, not tied to the paper.
25- A long **summer review silence**, then notification in **mid-June** (2026: June 16).
26- **Camera-ready in July** (2026: July 10), then the conference in **late September/October** (2026:
27 Sept 27 - Oct 1, Pittsburgh).
28
29Knowing you are on the fall calendar changes routing: a project that misses IROS's spring deadline has
30CoRL and the next ICRA as nearer alternatives than waiting a full IROS year.
31
32## Milestones
33
34- Venue fit: confirm the contribution is an integrated intelligent system with credible robot evidence.
35- Evidence lock: freeze the platform, task distribution, trial protocol, baselines, and the video plan.
36- Paper deadline: upload the anonymous PDF (references counted in the page budget) and PaperPlaza fields.
37- Video deadline: upload the ≤ 60 s / ≤ 10 MB attachment by its own cutoff.
38- Review silence: nothing to do but keep the robot and logs intact for camera-ready.
39- Notification: triage reviews; there is traditionally no rebuttal, so plan camera-ready edits instead.
40- Camera-ready: de-anonymize, integrate meta-review asks, file the IEEE copyright form, register.
41- Presentation: at least one author presents in person; prepare the talk and any live/updated video.
42
43## Backward plan from the paper deadline
44
45| Weeks out (heuristic) | Real-robot systems milestone |
46|---|---|
47| 10+ | Platform frozen; task distribution and success criterion defined |
48| 8 | Baselines implemented on the same hardware for a fair comparison |
49| 6 | Main trials run, resets logged, failures categorized |
50| 4 | Sim-to-real study complete; the gap is a number, not a hope |
51| 3 | Full draft in IEEE two-column format; references budgeted as content |
52| 2 | Video footage banked from real sessions; rough 60 s cut assembled |
53| 1 | Anonymity sweep across PDF, figures, and video; PaperPlaza PINs collected |
54| 0 | Paper uploaded; video by its separate cutoff |
55
56These offsets are planning heuristics only — anchor each to the current official timetable, never to a
57previous cycle's calendar.
58
59## Failure modes by stage
60
61- Filming on deadline week produces worse footage and worse anonymity than banking clips all along.
62- Treating references as free space overruns the budget, because IROS counts them in.
63- Assuming a rebuttal exists wastes the notification window; IROS traditionally ships reviews with the
64 decision, so the only lever is camera-ready.
65- Letting the robot get reconfigured before camera-ready makes a requested extra trial impossible.
66
67## Coordination notes
68
69- Assign one named owner for the video and one for the anonymity sweep; shared ownership is how both
70 slip.
71- Archive the exact submitted PDF and video, since the camera-ready must trace to the reviewed version.
72
73## Output format
74
75```text
76[Current stage] idea / experiments / writing / submission / video / review / notified / camera-ready
77[Next official deadline] <date and source, or unknown>
78[Critical path] <three tasks that determine readiness>
79[Risk register] <page-budget/anonymity/robot-evidence/video/transfer>
80[Owner map] <task -> person or role>
81```
82
83---
84