ISCA Workflow
An ISCA year has one gate. Miss mid-November and the next identical opportunity is
twelve months away, which is why experienced groups treat the ISCA calendar as an
engineering schedule with the deadline as tape-out. This skill lays out that
schedule using the verified ISCA 2026 dates as the template; as of 2026-07-08 the
ISCA 2027 CFP was not yet posted, so every 2027 date below is an expectation to
confirm against iscaconf.org/isca2027/ the moment it exists (待核实).
The verified 2026-cycle skeleton
| Milestone |
ISCA 2026 date (verified) |
What it means operationally |
| Abstract registration |
November 10, 2025 |
Title, abstract, authors, conflicts locked in HotCRP; paper content still fluid |
| Full paper |
November 17, 2025 |
The reviewed PDF — one week after abstracts, so the abstract week is a writing week, not a buffer |
| Round 1 reviews due |
December 19, 2025 |
First reviewer wave completes before the holidays |
| Round 2 reviews due |
February 13, 2026 |
Additional reviews on papers that advanced |
| Rebuttal + revision |
February 16 - March 6, 2026 |
Authors see reviews, respond, and may revise — a three-week working window |
| Conference |
June 27 - July 1, 2026 (Raleigh, NC) |
Presentation; artifact badges resolved before publication |
Industry-track submissions ran about a month behind (abstracts December 5, papers
December 12, 2025). Final notification date for 2026 was not captured in this
pack's verification — 待核实.
Working backward from November
Count in weeks from the expected paper deadline (call it P, likely mid-November
2026 for ISCA 2027):
- P minus 16 weeks (late July): venue decision final (
isca-topic-selection);
simulation or prototype infrastructure chosen and validated
(isca-experiments); the one-sentence claim written on the whiteboard.
- P minus 10 weeks: baseline configurations frozen and reproduced from scratch
by a second person. Baseline drift discovered later invalidates every downstream
number.
- P minus 6 weeks: main-result experiments complete. From here, compute goes to
sensitivity studies and reviewer-anticipation runs, not to the headline.
- P minus 4 weeks: full draft exists — bad prose, complete structure. Internal
"mock PC" read by two colleagues who did not build the system.
- P minus 1 week (abstract deadline): title/abstract/topics/conflicts final in
HotCRP. The abstract steers reviewer assignment; write it for bidding, not as a
placeholder.
- P: upload per
isca-submission, then freeze the artifact snapshot that
matches the submitted numbers (isca-reproducibility).
The winter: silence, then three loud weeks
Between November and mid-February the authors' only jobs are (a) keep the
evaluation environment resurrectable and (b) pre-build rebuttal ammunition: the
five most likely objections, each with a ready experiment or a pointer into the
submitted PDF. The 2026 cycle then opened a combined rebuttal/revision period
(February 16 - March 6) — unusually long by conference standards precisely because
ISCA lets authors change the paper, not just argue about it. Staff those three
weeks like a sprint: compute reserved, coauthors on call, no conference travel
booked. Details of what to do inside the window live in isca-author-response.
Branch plans after notification
- Accept: camera-ready under the edition's publisher workflow
(
isca-camera-ready), voluntary artifact submission (isca-artifact-evaluation),
talk and travel for late June.
- Reject with salvageable reviews: map every misunderstanding to the sentence
that permitted it; decide MICRO (spring gate) vs HPCA (summer gate) within two
weeks while the reviews are fresh.
- Reject with a fit objection: rerun
isca-topic-selection honestly — the
committee may have told you the paper's true venue.
Team ledger
Keep a single tracking file in the paper repo; every risk has one owner.
# isca-campaign.yaml
target: ISCA 2027 # 54th by arithmetic - ordinal 待核实
gate:
abstract: TBD-2026-11 # confirm on iscaconf.org/isca2027 when live
paper: TBD-2026-11
source: "not yet posted as of 2026-07-08"
owners:
claim_and_story: <name> # one sentence, defended weekly
simulation_infra: <name> # versions pinned, configs archived
baselines: <name> # frozen P-10w, independently reproduced
writing: <name> # draft complete P-4w
submission_admin: <name> # HotCRP, conflicts, template, metadata
rebuttal_reserve: <name> # compute + calendar hold, mid-Feb to early Mar
checks:
- abstract written for reviewer bidding, not filler
- artifact snapshot tagged at submission commit
- mock-PC read completed and objections filed
- fallback venue named with trigger condition
Failure modes this calendar prevents
- The November collision: abstract and paper a week apart means groups that
planned "we'll write after the abstract" write the whole paper in seven days.
The P-4w draft rule exists for this.
- The dead environment: rebuttal-window experiments that fail because the
simulator tree no longer builds in February. Tag and containerize at submission.
- The unstaffed revision: ISCA's revision option is leverage only for teams
that can produce new results in days; treat the window as scheduled work.
- The stale retarget: rejected papers resubmitted unchanged to MICRO carry
their ISCA reviews' fingerprints; committees overlap. Budget a real revision.
Milestone-to-skill routing
| When you are at... |
Open... |
| Venue decision (P-16w) |
isca-topic-selection, exemplars library |
| Infrastructure setup |
isca-experiments, isca-reproducibility |
| Drafting (P-6w to P-1w) |
isca-writing-style, isca-related-work, isca-supplementary |
| Upload week |
isca-submission (twice: abstract step, paper step) |
| Winter wait |
isca-review-process |
| February window |
isca-author-response |
| Post-decision |
isca-camera-ready, isca-artifact-evaluation, or the retarget branch |
All dates above are the 2026-cycle record
(../../resources/official-source-map.md, checked 2026-07-08). Confirm the 2027
calendar, page rules, and review mechanics on the official site before acting on
any of them.
Source: brycewang-stanford/Awesome-Journal-Skills → ISCA-Skills/skills/isca-workflow/SKILL.md
1---2name: isca-workflow3description: Use when planning a full ISCA campaign on a calendar — working back from the expected mid-November abstract and paper deadlines to freeze simulation evidence in time, staffing the winter two-round review wait, preparing for the February-March rebuttal and revision window, and branching to camera-ready, artifacts, and the June conference.4---5
6
7# ISCA Workflow
8
9An ISCA year has one gate. Miss mid-November and the next identical opportunity is
10twelve months away, which is why experienced groups treat the ISCA calendar as an
11engineering schedule with the deadline as tape-out. This skill lays out that
12schedule using the verified ISCA 2026 dates as the template; as of 2026-07-08 the
13ISCA 2027 CFP was not yet posted, so every 2027 date below is an expectation to
14confirm against `iscaconf.org/isca2027/` the moment it exists (待核实).
15
16## The verified 2026-cycle skeleton
17
18| Milestone | ISCA 2026 date (verified) | What it means operationally |
19|---|---|---|
20| Abstract registration | November 10, 2025 | Title, abstract, authors, conflicts locked in HotCRP; paper content still fluid |
21| Full paper | November 17, 2025 | The reviewed PDF — one week after abstracts, so the abstract week is a writing week, not a buffer |
22| Round 1 reviews due | December 19, 2025 | First reviewer wave completes before the holidays |
23| Round 2 reviews due | February 13, 2026 | Additional reviews on papers that advanced |
24| Rebuttal + revision | February 16 - March 6, 2026 | Authors see reviews, respond, and may revise — a three-week working window |
25| Conference | June 27 - July 1, 2026 (Raleigh, NC) | Presentation; artifact badges resolved before publication |
26
27Industry-track submissions ran about a month behind (abstracts December 5, papers
28December 12, 2025). Final notification date for 2026 was not captured in this
29pack's verification — 待核实.
30
31## Working backward from November
32
33Count in weeks from the expected paper deadline (call it P, likely mid-November
342026 for ISCA 2027):
35
36- **P minus 16 weeks (late July):** venue decision final (`isca-topic-selection`);
37 simulation or prototype infrastructure chosen and validated
38 (`isca-experiments`); the one-sentence claim written on the whiteboard.
39- **P minus 10 weeks:** baseline configurations frozen and reproduced from scratch
40 by a second person. Baseline drift discovered later invalidates every downstream
41 number.
42- **P minus 6 weeks:** main-result experiments complete. From here, compute goes to
43 sensitivity studies and reviewer-anticipation runs, not to the headline.
44- **P minus 4 weeks:** full draft exists — bad prose, complete structure. Internal
45 "mock PC" read by two colleagues who did not build the system.
46- **P minus 1 week (abstract deadline):** title/abstract/topics/conflicts final in
47 HotCRP. The abstract steers reviewer assignment; write it for bidding, not as a
48 placeholder.
49- **P:** upload per `isca-submission`, then freeze the artifact snapshot that
50 matches the submitted numbers (`isca-reproducibility`).
51
52## The winter: silence, then three loud weeks
53
54Between November and mid-February the authors' only jobs are (a) keep the
55evaluation environment resurrectable and (b) pre-build rebuttal ammunition: the
56five most likely objections, each with a ready experiment or a pointer into the
57submitted PDF. The 2026 cycle then opened a combined **rebuttal/revision period**
58(February 16 - March 6) — unusually long by conference standards precisely because
59ISCA lets authors *change the paper*, not just argue about it. Staff those three
60weeks like a sprint: compute reserved, coauthors on call, no conference travel
61booked. Details of what to do inside the window live in `isca-author-response`.
62
63## Branch plans after notification
64
65- **Accept:** camera-ready under the edition's publisher workflow
66 (`isca-camera-ready`), voluntary artifact submission (`isca-artifact-evaluation`),
67 talk and travel for late June.
68- **Reject with salvageable reviews:** map every misunderstanding to the sentence
69 that permitted it; decide MICRO (spring gate) vs HPCA (summer gate) within two
70 weeks while the reviews are fresh.
71- **Reject with a fit objection:** rerun `isca-topic-selection` honestly — the
72 committee may have told you the paper's true venue.
73
74## Team ledger
75
76Keep a single tracking file in the paper repo; every risk has one owner.
77
78```yaml
79# isca-campaign.yaml
80target: ISCA 2027 # 54th by arithmetic - ordinal 待核实
81gate:
82 abstract: TBD-2026-11 # confirm on iscaconf.org/isca2027 when live
83 paper: TBD-2026-11
84 source: "not yet posted as of 2026-07-08"
85owners:
86 claim_and_story: <name> # one sentence, defended weekly
87 simulation_infra: <name> # versions pinned, configs archived
88 baselines: <name> # frozen P-10w, independently reproduced
89 writing: <name> # draft complete P-4w
90 submission_admin: <name> # HotCRP, conflicts, template, metadata
91 rebuttal_reserve: <name> # compute + calendar hold, mid-Feb to early Mar
92checks:
93 - abstract written for reviewer bidding, not filler
94 - artifact snapshot tagged at submission commit
95 - mock-PC read completed and objections filed
96 - fallback venue named with trigger condition
97```
98
99## Failure modes this calendar prevents
100
101- **The November collision:** abstract and paper a week apart means groups that
102 planned "we'll write after the abstract" write the whole paper in seven days.
103 The P-4w draft rule exists for this.
104- **The dead environment:** rebuttal-window experiments that fail because the
105 simulator tree no longer builds in February. Tag and containerize at submission.
106- **The unstaffed revision:** ISCA's revision option is leverage only for teams
107 that can produce new results in days; treat the window as scheduled work.
108- **The stale retarget:** rejected papers resubmitted unchanged to MICRO carry
109 their ISCA reviews' fingerprints; committees overlap. Budget a real revision.
110
111## Milestone-to-skill routing
112
113| When you are at... | Open... |
114|---|---|
115| Venue decision (P-16w) | `isca-topic-selection`, exemplars library |
116| Infrastructure setup | `isca-experiments`, `isca-reproducibility` |
117| Drafting (P-6w to P-1w) | `isca-writing-style`, `isca-related-work`, `isca-supplementary` |
118| Upload week | `isca-submission` (twice: abstract step, paper step) |
119| Winter wait | `isca-review-process` |
120| February window | `isca-author-response` |
121| Post-decision | `isca-camera-ready`, `isca-artifact-evaluation`, or the retarget branch |
122
123All dates above are the 2026-cycle record
124(`../../resources/official-source-map.md`, checked 2026-07-08). Confirm the 2027
125calendar, page rules, and review mechanics on the official site before acting on
126any of them.
127
128---
129
130**Source:** [`brycewang-stanford/Awesome-Journal-Skills`](https://github.com/brycewang-stanford/Awesome-Journal-Skills) → `ISCA-Skills/skills/isca-workflow/SKILL.md`