SOSP Workflow
Use this to place a project on the SOSP calendar and to decide what to do in the
current phase. SOSP has been annual since 2024 (the SIGOPS announcement is at
sigops.org/2023/sosp-is-going-annual/), which changed campaign planning from a
two-year bet into a rolling circuit. All dates below were checked 2026-07-08.
The 2026 cycle as the template
| Milestone (2026 cycle) |
Date |
Phase it opens |
| Abstract registration |
March 27, 2026 (Apr 1 AoE window rendered in EDT on HotCRP) |
Freeze title/authors/conflicts |
| Full paper deadline |
April 2, 2026, 7:59:59 AM EDT |
Review |
| Author response window |
Announced with reviews, pre-PC-meeting |
sosp-author-response |
| Notification |
July 3, 2026 |
Camera-ready + AE (accepted) or retarget (rejected) |
| Camera-ready |
August 28, 2026 |
Shepherded final version |
| Conference |
Sep 29 - Oct 2, 2026, Prague, Czech Republic |
Talk, posters, workshops |
As of 2026-07-08 the notification has just landed: teams are either five days
into the acceptance track or five days into retargeting. SOSP 2027 dates are
unpublished (待核实 at sigops.org and sosp.org); the annual pattern implies a
spring 2027 deadline, but never back-schedule against an implied date — only
against a posted one.
Accepted: three threads, two months
July 3 to August 28 runs three deadline-bound conversations in parallel, and the
standing failure is one person owning all three:
- Shepherd thread — revision plan within days, agreed scope, 13th/14th page
negotiation (see
sosp-camera-ready). Owner A.
- Artifact thread — sysartifacts registration opens days after notification;
the evaluation window is interactive (see
sosp-artifact-evaluation). Owner B.
- Logistics thread — ACM rights form, registration, Czech-entry visas where
needed, talk preparation. Owner C, earliest start wins on visas.
Rejected: the retargeting circuit
Annual SOSP plus annual OSDI plus the EuroSys/ATC/NSDI ring means a systems paper
is rarely more than a few months from its next natural deadline. Retarget on a
decision tree, not on grief:
- Reviews attack soundness (evaluation holes, unisolated mechanisms): fix the
evidence first; the next deadline is whichever one the new experiments make.
- Reviews attack fit or significance but concede soundness: the paper may be
right for a sibling with a different center of gravity — networked-systems
framing to NSDI, storage framing to FAST, deployment/practitioner framing to ATC.
- Reviews are strong with one blocker: an OSDI resubmission in the next window
with a surgical fix and a cover-your-delta introduction paragraph is the highest
expected-value move. Exact sibling deadlines shift every cycle (待核实 against
each venue's current CFP before promising a date to co-authors).
Back-scheduling the next submission
T-9 months problem locked; motivating measurement exists; skeleton design review
T-6 months system runs end-to-end on one workload; claim list drafted
T-4 months evaluation matrix frozen (sosp-experiments); baselines built and tuned
T-10 weeks full experimental sweep begins; env capture automated (sosp-reproducibility)
T-6 weeks complete draft; strict 15-minute read by an outside systems reader
T-3 weeks evaluation freeze; figures one-command from logs
T-10 days format compile, leak sweep, conflict list drafted (sosp-submission)
T-6 days abstract registration
T-0 upload; verify the HotCRP-held PDF, not the local one
The two intervals teams misjudge: baselines (building and fairly tuning someone
else's system routinely costs a month) and the draft-to-freeze gap (a SOSP draft
that first exists three weeks before the deadline reads like it).
Cadence discipline for a group
- Track the circuit in one shared calendar: SOSP, OSDI, EuroSys, ATC, NSDI, FAST,
plus HotOS in odd rhythm for early-stage ideas — each with abstract and paper
gates, refreshed from official CFPs each fall and spring.
- One project, one primary venue bet, one named fallback — deciding the fallback
before notification removes the week of post-rejection drift.
- Never submit the same work to overlapping review cycles; systems venues share PC
members and treat dual submission as an integrity violation.
Output format
[Phase] where this project sits on the cycle today
[Owners] shepherd / artifact / logistics threads assigned?
[If rejected] soundness vs fit diagnosis -> named next venue + posted deadline
[Back-schedule] T-milestones with dates against the next posted deadline
[Calendar risk] the interval currently underestimated
Source: brycewang-stanford/Awesome-Journal-Skills → SOSP-Skills/skills/sosp-workflow/SKILL.md
1---2name: sosp-workflow3description: Use when planning a SOSP campaign across the annual cycle — back-scheduling from the spring abstract and paper deadlines, running the summer response and July notification, stacking the August camera-ready with artifact evaluation, and retargeting rejections across the SOSP/OSDI/EuroSys circuit.4---5
6
7# SOSP Workflow
8
9Use this to place a project on the SOSP calendar and to decide what to do in the
10current phase. SOSP has been **annual since 2024** (the SIGOPS announcement is at
11`sigops.org/2023/sosp-is-going-annual/`), which changed campaign planning from a
12two-year bet into a rolling circuit. All dates below were checked 2026-07-08.
13
14## The 2026 cycle as the template
15
16| Milestone (2026 cycle) | Date | Phase it opens |
17|---|---|---|
18| Abstract registration | March 27, 2026 (Apr 1 AoE window rendered in EDT on HotCRP) | Freeze title/authors/conflicts |
19| Full paper deadline | April 2, 2026, 7:59:59 AM EDT | Review |
20| Author response window | Announced with reviews, pre-PC-meeting | `sosp-author-response` |
21| Notification | July 3, 2026 | Camera-ready + AE (accepted) or retarget (rejected) |
22| Camera-ready | August 28, 2026 | Shepherded final version |
23| Conference | Sep 29 - Oct 2, 2026, Prague, Czech Republic | Talk, posters, workshops |
24
25As of **2026-07-08 the notification has just landed**: teams are either five days
26into the acceptance track or five days into retargeting. SOSP 2027 dates are
27unpublished (待核实 at `sigops.org` and `sosp.org`); the annual pattern implies a
28spring 2027 deadline, but never back-schedule against an implied date — only
29against a posted one.
30
31## Accepted: three threads, two months
32
33July 3 to August 28 runs three deadline-bound conversations in parallel, and the
34standing failure is one person owning all three:
35
361. **Shepherd thread** — revision plan within days, agreed scope, 13th/14th page
37 negotiation (see `sosp-camera-ready`). Owner A.
382. **Artifact thread** — sysartifacts registration opens days after notification;
39 the evaluation window is interactive (see `sosp-artifact-evaluation`). Owner B.
403. **Logistics thread** — ACM rights form, registration, Czech-entry visas where
41 needed, talk preparation. Owner C, earliest start wins on visas.
42
43## Rejected: the retargeting circuit
44
45Annual SOSP plus annual OSDI plus the EuroSys/ATC/NSDI ring means a systems paper
46is rarely more than a few months from its next natural deadline. Retarget on a
47decision tree, not on grief:
48
49- Reviews attack **soundness** (evaluation holes, unisolated mechanisms): fix the
50 evidence first; the next deadline is whichever one the new experiments make.
51- Reviews attack **fit or significance** but concede soundness: the paper may be
52 right for a sibling with a different center of gravity — networked-systems
53 framing to NSDI, storage framing to FAST, deployment/practitioner framing to ATC.
54- Reviews are **strong with one blocker**: an OSDI resubmission in the next window
55 with a surgical fix and a cover-your-delta introduction paragraph is the highest
56 expected-value move. Exact sibling deadlines shift every cycle (待核实 against
57 each venue's current CFP before promising a date to co-authors).
58
59## Back-scheduling the next submission
60
61```text
62T-9 months problem locked; motivating measurement exists; skeleton design review
63T-6 months system runs end-to-end on one workload; claim list drafted
64T-4 months evaluation matrix frozen (sosp-experiments); baselines built and tuned
65T-10 weeks full experimental sweep begins; env capture automated (sosp-reproducibility)
66T-6 weeks complete draft; strict 15-minute read by an outside systems reader
67T-3 weeks evaluation freeze; figures one-command from logs
68T-10 days format compile, leak sweep, conflict list drafted (sosp-submission)
69T-6 days abstract registration
70T-0 upload; verify the HotCRP-held PDF, not the local one
71```
72
73The two intervals teams misjudge: baselines (building and fairly tuning someone
74else's system routinely costs a month) and the draft-to-freeze gap (a SOSP draft
75that first exists three weeks before the deadline reads like it).
76
77## Cadence discipline for a group
78
79- Track the circuit in one shared calendar: SOSP, OSDI, EuroSys, ATC, NSDI, FAST,
80 plus HotOS in odd rhythm for early-stage ideas — each with abstract and paper
81 gates, refreshed from official CFPs each fall and spring.
82- One project, one primary venue bet, one named fallback — deciding the fallback
83 *before* notification removes the week of post-rejection drift.
84- Never submit the same work to overlapping review cycles; systems venues share PC
85 members and treat dual submission as an integrity violation.
86
87## Output format
88
89```text
90[Phase] where this project sits on the cycle today
91[Owners] shepherd / artifact / logistics threads assigned?
92[If rejected] soundness vs fit diagnosis -> named next venue + posted deadline
93[Back-schedule] T-milestones with dates against the next posted deadline
94[Calendar risk] the interval currently underestimated
95```
96
97---
98
99**Source:** [`brycewang-stanford/Awesome-Journal-Skills`](https://github.com/brycewang-stanford/Awesome-Journal-Skills) → `SOSP-Skills/skills/sosp-workflow/SKILL.md`