GMP Standard Operating Procedure
Produces a GMP-compliant SOP that is inspection-ready and operationally executable.
Quick Start
- Gather inputs: process scope, applicable regulations, QMS context, equipment list, record systems.
- Walk through each SOP section below, filling tables and templates.
- Mark any unverified citations with
[VERIFY].
- Route for QA review and approval before release.
Prerequisites
Collect before drafting:
- Process scope — product type, dosage form, facility class, target markets
- Applicable regs — FDA CGMP, ICH, WHO, PIC/S, EU GMP, local requirements
- QMS context — document numbering, approval matrix, related SOPs
- Equipment — asset IDs, calibration/maintenance/qualification status
- Record systems — paper vs electronic, Part 11 status
- Inspection history — FDA 483s, warning letters, open CAPAs
- SME/approver list — production, QA, QC, engineering, management
SOP Sections
1. Document Control Page
| Field |
Content |
| SOP Title |
Precise scope (process/area) |
| SOP ID |
Site numbering convention |
| Version |
Numeric or semantic |
| Effective Date |
Approved use date |
| Supersedes |
Prior SOP ID/version |
| Prepared By |
Name, role, date |
| Reviewed By |
QA, SMEs |
| Approved By |
QA/Management |
| Distribution |
Controlled locations |
| Related SOPs |
IDs and titles |
| Electronic Signatures |
Part 11 status |
2. Purpose and Scope
Purpose:
This SOP establishes controlled steps for [process] to ensure GMP compliance under [reg citations].
Scope:
Applies to [areas, equipment, product types, personnel]. Excludes [exclusions with rationale].
Interfaces: [related SOP IDs].
3. Regulatory Basis
List only applicable regulations. Use [VERIFY] for unconfirmed citations.
| Authority |
Citation |
| FDA CGMP |
21 CFR Parts 210/211 |
| Electronic records |
21 CFR Part 11 |
| ICH |
Q7 (API), Q9, Q10 |
| WHO |
TRS GMP guidance |
| PIC/S |
GMP Guide |
| EU |
EU GMP Guide + Annexes |
4. Definitions
Provide GMP-aligned definitions consistent with site QMS. Minimum set: CPP, CQA, deviation, OOS, OOT, batch record, validation, qualification, calibration.
5. Responsibilities Matrix
| Role |
Duties |
Decisions/Approvals |
Records Owned |
| Production |
Execute SOP steps |
Stop work for deviations |
Batch records |
| QA |
Approve SOP, review deviations |
Release/closure authority |
QA review logs |
| QC |
Testing, sampling |
OOS disposition |
Lab records |
| Engineering |
Maintenance/calibration |
Equipment readiness |
PM/calibration logs |
| Management |
Resource allocation |
Final approval |
Training matrix |
6. Materials, Equipment, and Utilities
| Item |
ID/Spec |
Qualification |
Calibration/PM |
Acceptance Criteria |
| Equipment |
Asset ID |
IQ/OQ/PQ status |
Frequency |
Tolerance |
| Materials |
Grade/spec |
Supplier status |
Storage |
COA required |
| Utilities |
Water/HVAC/gases |
Monitoring |
Limits |
Action levels |
7. Procedure Steps
Each step must specify role, action, records, and acceptance criteria.
| Step |
Role |
Action |
CPP/CQA |
Hold Point |
Records |
| 1 |
Production |
[imperative action] |
[range] |
QA if required |
[record] |
| 2 |
QC |
[sample/test] |
[spec] |
QA review |
[record] |
| 3 |
QA |
[verification] |
N/A |
Release |
[record] |
Step rules:
- Include decision points and stop-work criteria
- Define acceptance ranges for all CPPs/CQAs
- State required PPE/cleanroom behavior where applicable
- Require documentation at time of action (concurrent recording)
8. In-Process Controls
| Control |
Frequency |
Method |
Acceptance |
Action if OOR |
| [Control] |
[per batch/time] |
[method] |
[spec] |
[action] |
9. Deviations, OOS/OOT, and CAPA
- Document deviation within same shift or defined timeframe
- Quarantine affected material/lots
- Initiate root cause investigation
- Assess impact on product quality and patient safety
- Implement CAPA with effectiveness checks
- Document QA disposition and release decision
10. Documentation and Records
| Record |
Owner |
System |
Review Timeline |
Retention |
| Batch record |
Production |
Paper/eQMS |
[timeframe] |
Per 21 CFR 211.180 [VERIFY] |
| Calibration log |
Engineering |
Paper/eQMS |
[timeframe] |
[policy] |
| Training record |
QA/HR |
LMS/eQMS |
[timeframe] |
[policy] |
If electronic: require validation, audit trails, access control, e-signatures per Part 11.
11. Training and Qualification
- Initial training before first execution
- Retraining on each revision
- Qualification for roles with critical steps
- Document training effectiveness
12. Change Control and Revision History
| Version |
Effective Date |
Change Summary |
Rationale |
Approvers |
| 1.0 |
[date] |
Initial release |
[reason] |
[names] |
13. References
List all cited standards with version/date. Mark uncertain items [VERIFY].
14. Appendices
Include controlled templates: SOP execution checklist, batch record template, deviation report template, in-process control log, equipment cleaning log.
Pitfalls and Checks
- Language — use imperative, unambiguous phrasing; never advisory ("should consider")
- Citations — verify all regulatory citations are current; mark uncertain ones
[VERIFY]
- Role segregation — maintain separation between production and QA/QC functions
- Retention — apply the strictest applicable retention requirement across jurisdictions
- Jurisdiction — add annexes for non-U.S. markets (EU, WHO, PIC/S requirements)
- Part 11 — confirm electronic record controls whenever eQMS or e-signatures are used
1---2name: gmp-sop3description: Drafts inspection-ready GMP standard operating procedures for regulated manufacturing. Covers document control, role accountability, process controls, deviation/CAPA handling, and records management aligned to FDA CGMP (21 CFR 210/211), Part 11, ICH Q7/Q9/Q10, WHO GMP, PIC/S, and EU GMP. Use when creating or overhauling a GMP SOP, preparing for audits or inspections, or building compliance-ready procedures. Trigger: GMP, SOP, CGMP, 21 CFR 210, 21 CFR 211, Part 11, ICH Q7, ICH Q9, ICH Q10, WHO GMP, PIC/S, EU GMP.4license: Apache-2.05---67# GMP Standard Operating Procedure89Produces a GMP-compliant SOP that is inspection-ready and operationally executable.1011## Quick Start12131. Gather inputs: process scope, applicable regulations, QMS context, equipment list, record systems.142. Walk through each SOP section below, filling tables and templates.153. Mark any unverified citations with `[VERIFY]`.164. Route for QA review and approval before release.1718## Prerequisites1920Collect before drafting:2122- **Process scope** — product type, dosage form, facility class, target markets23- **Applicable regs** — FDA CGMP, ICH, WHO, PIC/S, EU GMP, local requirements24- **QMS context** — document numbering, approval matrix, related SOPs25- **Equipment** — asset IDs, calibration/maintenance/qualification status26- **Record systems** — paper vs electronic, Part 11 status27- **Inspection history** — FDA 483s, warning letters, open CAPAs28- **SME/approver list** — production, QA, QC, engineering, management2930## SOP Sections3132### 1. Document Control Page3334| Field | Content |35|---|---|36| SOP Title | Precise scope (process/area) |37| SOP ID | Site numbering convention |38| Version | Numeric or semantic |39| Effective Date | Approved use date |40| Supersedes | Prior SOP ID/version |41| Prepared By | Name, role, date |42| Reviewed By | QA, SMEs |43| Approved By | QA/Management |44| Distribution | Controlled locations |45| Related SOPs | IDs and titles |46| Electronic Signatures | Part 11 status |4748### 2. Purpose and Scope4950```51Purpose:52This SOP establishes controlled steps for [process] to ensure GMP compliance under [reg citations].5354Scope:55Applies to [areas, equipment, product types, personnel]. Excludes [exclusions with rationale].56Interfaces: [related SOP IDs].57```5859### 3. Regulatory Basis6061List only applicable regulations. Use `[VERIFY]` for unconfirmed citations.6263| Authority | Citation |64|---|---|65| FDA CGMP | 21 CFR Parts 210/211 |66| Electronic records | 21 CFR Part 11 |67| ICH | Q7 (API), Q9, Q10 |68| WHO | TRS GMP guidance |69| PIC/S | GMP Guide |70| EU | EU GMP Guide + Annexes |7172### 4. Definitions7374Provide GMP-aligned definitions consistent with site QMS. Minimum set: CPP, CQA, deviation, OOS, OOT, batch record, validation, qualification, calibration.7576### 5. Responsibilities Matrix7778| Role | Duties | Decisions/Approvals | Records Owned |79|---|---|---|---|80| Production | Execute SOP steps | Stop work for deviations | Batch records |81| QA | Approve SOP, review deviations | Release/closure authority | QA review logs |82| QC | Testing, sampling | OOS disposition | Lab records |83| Engineering | Maintenance/calibration | Equipment readiness | PM/calibration logs |84| Management | Resource allocation | Final approval | Training matrix |8586### 6. Materials, Equipment, and Utilities8788| Item | ID/Spec | Qualification | Calibration/PM | Acceptance Criteria |89|---|---|---|---|---|90| Equipment | Asset ID | IQ/OQ/PQ status | Frequency | Tolerance |91| Materials | Grade/spec | Supplier status | Storage | COA required |92| Utilities | Water/HVAC/gases | Monitoring | Limits | Action levels |9394### 7. Procedure Steps9596Each step must specify role, action, records, and acceptance criteria.9798| Step | Role | Action | CPP/CQA | Hold Point | Records |99|---|---|---|---|---|---|100| 1 | Production | [imperative action] | [range] | QA if required | [record] |101| 2 | QC | [sample/test] | [spec] | QA review | [record] |102| 3 | QA | [verification] | N/A | Release | [record] |103104Step rules:105- Include decision points and stop-work criteria106- Define acceptance ranges for all CPPs/CQAs107- State required PPE/cleanroom behavior where applicable108- Require documentation at time of action (concurrent recording)109110### 8. In-Process Controls111112| Control | Frequency | Method | Acceptance | Action if OOR |113|---|---|---|---|---|114| [Control] | [per batch/time] | [method] | [spec] | [action] |115116### 9. Deviations, OOS/OOT, and CAPA117118- Document deviation within same shift or defined timeframe119- Quarantine affected material/lots120- Initiate root cause investigation121- Assess impact on product quality and patient safety122- Implement CAPA with effectiveness checks123- Document QA disposition and release decision124125### 10. Documentation and Records126127| Record | Owner | System | Review Timeline | Retention |128|---|---|---|---|---|129| Batch record | Production | Paper/eQMS | [timeframe] | Per 21 CFR 211.180 `[VERIFY]` |130| Calibration log | Engineering | Paper/eQMS | [timeframe] | [policy] |131| Training record | QA/HR | LMS/eQMS | [timeframe] | [policy] |132133If electronic: require validation, audit trails, access control, e-signatures per Part 11.134135### 11. Training and Qualification136137- Initial training before first execution138- Retraining on each revision139- Qualification for roles with critical steps140- Document training effectiveness141142### 12. Change Control and Revision History143144| Version | Effective Date | Change Summary | Rationale | Approvers |145|---|---|---|---|---|146| 1.0 | [date] | Initial release | [reason] | [names] |147148### 13. References149150List all cited standards with version/date. Mark uncertain items `[VERIFY]`.151152### 14. Appendices153154Include controlled templates: SOP execution checklist, batch record template, deviation report template, in-process control log, equipment cleaning log.155156## Pitfalls and Checks157158- **Language** — use imperative, unambiguous phrasing; never advisory ("should consider")159- **Citations** — verify all regulatory citations are current; mark uncertain ones `[VERIFY]`160- **Role segregation** — maintain separation between production and QA/QC functions161- **Retention** — apply the strictest applicable retention requirement across jurisdictions162- **Jurisdiction** — add annexes for non-U.S. markets (EU, WHO, PIC/S requirements)163- **Part 11** — confirm electronic record controls whenever eQMS or e-signatures are used