Ideas to Backlog Plan (Gait)
Execute this workflow when asked to convert strategic feature recommendations into a concrete product backlog plan.
Scope
- Repository root:
/Users/tr/gait - Input file:
/Users/tr/gait/product/ideas.md - Structure references (match level of detail and style):
/Users/tr/gait/product/PLAN_v1.md/Users/tr/gait/product/PLAN_v1.7.md/Users/tr/gait/product/PLAN_HARDENING.md/Users/tr/gait/product/PLAN_ADOPTION.md- Output file:
/Users/tr/gait/product/PLAN_NEXT.md(unless user specifies a different target) - Planning only. Do not implement code or docs outside the target plan file.
Preconditions
ideas.mdmust contain strategic recommendations with evidence.- Each recommendation should include:
- recommendation name
- why-now trigger
- strategic capability direction
- moat/benefit rationale
- source links
If these are missing, stop and output a gap note instead of inventing details.
Workflow
- Read
ideas.mdand extract candidate initiatives. - Read reference plans to mirror structure and detail level.
- Cluster ideas into coherent epics (avoid one-idea-per-epic fragmentation).
- Prioritize using
P0/P1/P2based on contract risk reduction, moat expansion, adoption leverage, and sequencing dependency. Sequence work in waves:Wave 1for contract/runtime correctness and architecture boundaries,Wave 2for docs, OSS hygiene, and distribution UX. - Produce execution-ready epics and stories.
- For every story, include concrete tasks, repo paths, run commands, acceptance criteria, test requirements, and CI matrix wiring. If a story touches public surfaces, require explicit notes for stable/internal boundaries, migration expectations, and where users integrate Gait into their code or pipeline.
- Build a plan-level test matrix section mapping stories to CI lanes (fast, integration, acceptance, cross-platform).
- Ensure each story defines tests based on work type (schema, CLI, gate/policy, determinism, runtime, SDK, docs/examples).
- Add explicit boundaries, ownership, and non-goals to prevent scope drift.
- Add delivery sequencing section (phase/week-based minimum-now path) that keeps docs/OSS/distribution work after the enabling contract/runtime work.
- Add definition of done and release/exit gate criteria.
- Write full plan to target file, overwriting prior contents.
Non-Negotiables
- Preserve Gait core contracts: determinism, offline-first defaults, fail-closed policy posture, schema stability, and exit code stability.
- Respect architecture boundaries: Go core is authoritative for enforcement/verification logic; Python remains thin adoption layer.
- Treat architecture as enforceable boundaries in code, not aspirational docs.
- Prefer thin orchestration and focused packages for parsing, persistence, reporting, and policy logic.
- Make side effects explicit in names/signatures and avoid asymmetric public semantics unless the distinction is named directly.
- Public-surface stories must cover API stability/deprecation notes, schema/versioning expectations, machine-readable error behavior, and install/version discoverability where relevant.
- Long-running workflow stories must account for timeout/cancellation propagation end-to-end.
- Add extension points early when enterprise adoption would otherwise require forks.
- Avoid dashboard-first or hosted-only dependencies in backlog core.
- Do not include implementation code, pseudo-code, or ticket boilerplate.
- Do not recommend minor polish work as primary backlog items.
- Every story must include test requirements and explicit matrix wiring.
- No story is complete without same-change test updates, except explicitly justified docs-only stories.
Test Requirements by Work Type (Mandatory)
- Schema or artifact contract work:
- Add schema validation tests.
- Add or update golden fixtures.
- Add compatibility or migration tests.
- CLI surface work (flags, args,
--json, exits):
- Add command tests for help/usage behavior.
- Add
--jsonstability tests. - Add exit code contract tests.
- Gate or policy semantics:
- Add deterministic allow/block/require_approval fixture tests.
- Add fail-closed tests for evaluator-missing or undecidable paths.
- Add reason code stability checks.
- Determinism, hashing, signing, packaging:
- Add byte-stability tests for repeated runs with identical input.
- Add canonicalization and digest stability tests.
- Add verify/diff determinism tests.
- Job runtime, state, concurrency, persistence:
- Add pause/resume/cancel/checkpoint lifecycle tests.
- Add crash-safe/atomic write tests.
- Add concurrent execution and contention tests.
- SDK or adapter boundary work:
- Add wrapper behavior/error-mapping tests.
- Add adapter conformance tests against canonical sidecar/gate path.
- Preserve Go-authoritative decision boundary tests.
- Docs/examples contract changes:
- Add command-smoke checks for documented flows.
- Add docs-versus-CLI parity checks where possible.
- Add README/quickstart/integration smoke checks for
what it is,who it is for,how it integrates, andfirst valuecoverage when public docs change. - Add install/version discoverability checks (
gait version, minimal install path) when operator onboarding changes. - Add docs source-of-truth sync tasks for
README.md,docs/,docs-site/public/llms.txt, anddocs-site/public/llm/*.md. - Add OSS trust-baseline updates (
CONTRIBUTING.md,CHANGELOG.md,CODE_OF_CONDUCT.md,SECURITY.md, issue/PR templates) when launch/distribution expectations change. - Update acceptance scripts if docs alter required operator path.
Test Matrix Wiring Contract (Plan-Level)
Every generated plan must include a section named Test Matrix Wiring with:
Fast lane: pre-push or quick CI checks required for each epic.Core CI lane: required unit/integration UAT checks in default CI.Acceptance lane: deterministic acceptance scripts required before merge or release.Cross-platform lane: Linux/macOS/Windows expectations for affected stories.Risk lane: extra suites for high-risk stories (policy, determinism, security, portability).Gating rule: merge/release block conditions tied to failed required lanes.
Plan Format Contract
Required top sections:
# PLAN <name>: <theme>Date,Source of truth,ScopeGlobal Decisions (Locked)Current Baseline (Observed)Exit CriteriaTest Matrix WiringEpicsections withObjectiveandStorybreakdownsMinimum-Now Sequence(phased execution)Explicit Non-GoalsDefinition of Done
Story template (required fields):
### Story <ID>: <title>Priority:Tasks:Repo paths:Run commands:Test requirements:Matrix wiring:Acceptance criteria:- Optional when needed:
Dependencies:Risks:
Quality Gate for Output
Before finalizing, verify:
- Every epic maps back to at least one idea from
ideas.md. - Every story is actionable without guesswork.
- Acceptance criteria are testable and deterministic.
- Paths are real and repo-relevant.
- Test requirements match story work type.
- Matrix wiring is present for every story.
- Sequence is dependency-aware.
- Wave 1 contract/runtime work lands before Wave 2 docs/OSS/distribution work.
- Public/internal boundaries, integration points, and side effects are explicit where stories touch user-facing surfaces.
- Launch-facing plans cover OSS trust baseline and docs source-of-truth responsibilities when relevant.
- Plan stays strategic and execution-relevant (not cosmetic).
Command Anchors
- Include concrete plan tasks that reference verifiable CLI surfaces, for example:
gait doctor --jsongait gate eval --policy <policy.yaml> --intent <intent.json> --jsongait pack verify <pack.zip> --json
Failure Mode
If ideas.md lacks strategic quality or evidence, write only:
No backlog plan generated.Reason:concise blocker summary.Missing inputs:exact missing fields required to proceed.
Do not fabricate backlog content when source strategy quality is insufficient.