Execute Plan — Autonomous Phase Runner
Start with .cursor/agent-map.md for navigation and focused test commands.
When to use
Developer points at a plan file and asks to execute it. Common phrasings:
- "execute plan ongoing/something.md"
- "do @ongoing/something.md"
- "run @ongoing/something-sub-phases.md"
- "execute phases", "start plan"
Plans and sub-phase plans live in ongoing/*.md. Sub-phase documents
(ongoing/<plan-name>-<phase-number>-sub-phases.md) follow the same loop
as top-level plans.
Jidoka principle (autonomation)
Run with full autonomy but stop the line when something requires a developer's brain — a learning moment, not a mechanical task.
Stop conditions (report and wait):
- Value decision — multiple valid directions with different user-facing trade-offs; the plan says "TBD", "decide", "option A / B", or you discover such a fork during implementation.
- Design decision — a structural choice that affects future phases or overall architecture.
- Authentication / credentials — secrets, API keys, login flows, or permissions the agent cannot supply.
- Unexpected failure you cannot diagnose — a test fails for reasons unrelated to the current change, CI breaks on something external, etc.
- Ambiguity — the phase description is unclear and guessing wrong would waste a commit.
When stopping: explain what you learned, why you stopped, and what decision the developer needs to make. Then wait.
Check Jidoka both before and after each phase, with separate focuses:
- Before (coordinator, on the phase description) — is this phase safe to start autonomously? Look for value/design forks, ambiguity, or missing credentials in what the plan asks for.
- After (sub-agent, on what was learned implementing the phase) — did doing the work reveal something the plan did not anticipate? A discovered value/design fork, an assumption proven wrong, or a learning that changes downstream phases. Stop even if the phase itself succeeded.
Do NOT stop for:
- Routine implementation choices (naming, file placement, test structure) where existing rules and conventions give a clear answer.
- Minor refactoring needed to make the phase fit.
- Test failures caused by your own change (fix them).
The loop (coordinator)
You are a thin coordinator. You do NOT implement phases yourself. Each phase is delegated to a fresh sub-agent so that context does not accumulate across phases.
1. Read the plan file (ongoing/*.md)
2. Find the next phase/sub-phase whose status is NOT "done"
3. Check stop conditions on the phase description
→ If stop condition → report & STOP
4. DELEGATE the phase to a sub-agent (see "Delegation" below)
5. When sub-agent finishes:
a. Verify the plan file shows the phase as "done"
b. Verify a new commit was pushed (`git log -1`, `git status`)
c. If the sub-agent reported a Jidoka stop → relay to developer & STOP
d. If the sub-agent reported REVERT & SPLIT → re-read plan, continue loop
6. Go to step 1 (next phase)
7. All phases done → report "plan complete" & STOP
Delegation — one sub-agent per phase
Use the Task tool (subagent_type: "generalPurpose") for each phase.
The sub-agent prompt must include:
- Plan file path and which phase/sub-phase to implement (paste the phase text so the sub-agent does not need to guess).
- Jidoka stop conditions (copy the list above).
- Implementation rules: follow
planning.mdcand the phased-planning skill (TDD, test-first, phase discipline). Use.cursor/rules/for the areas touched — e.g.backend-code.mdc,backend-testing.mdc,e2e-authoring.mdc,frontend-component.mdc,frontend-testing.mdc,frontend-api.mdc,db-migration.mdc,mcp-server.mdc,cli.mdc. Naming rule: all permanent artifacts (file names, test names, feature files, class names) are named by capability/domain, never by phase number. Phases drive when work happens; code/tests present a static consumer's view of the system. - Wrap-up checklist (see below).
- Revert & split instructions (see below).
- Nix prefix: run repo tooling through
CURSOR_DEV=true nix develop -c <command>unless on Cloud VM (usecloud-vm-setupskill). Git commands do not need the Nix prefix. - What to return: a short summary — phase done, or Jidoka stop with reason, or reverted and split (with updated plan content).
Do NOT pass the entire plan history or prior phase details — only the current phase and enough context for the sub-agent to work.
Sub-agent: wrap-up checklist (after tests pass)
Delegate refactoring to a fresh sub-agent — Before committing, the phase sub-agent spawns another sub-agent (Task tool,
subagent_type: "generalPurpose") that runs the post-change-refactor skill (.cursor/skills/post-change-refactor/SKILL.md) against the current uncommitted change. Pass it:- The phase being closed (paste the phase text from the plan).
- The path to the plan file, so it can read the immediate next phase when deciding what is justified.
- The nix prefix rule (
CURSOR_DEV=true nix develop -c <command>; git without prefix). - Instruction to follow the post-change-refactor skill end-to-end and not to commit.
- Instruction to return a short summary of what it cleaned up and which related tests it confirmed passing.
When the refactor sub-agent returns, the phase sub-agent continues with the remaining wrap-up steps below.
Lint & format — run
CURSOR_DEV=true nix develop -c pnpm lint:allandCURSOR_DEV=true nix develop -c pnpm format:all. Fix any issues.Regenerate API client — if backend controller or DTO signatures changed, run the generate-api-client skill before committing.
Reflect & re-plan the plan file — based on what this phase taught you:
- Summarize learnings — capture anything that changes future work (surprises, constraints, assumptions proven wrong). Keep it brief; drop it if there is nothing worth carrying forward.
- Prune done phases — mark the phase "done" and remove now-obsolete implementation detail from completed phases. The plan reflects the current state and what remains, not a development diary.
- Adjust future phases — revise, reorder, add, or remove downstream phases when the learnings warrant it.
Post-phase Jidoka check — if the learnings surface a value/design fork, a wrong assumption, or anything needing developer judgment (see the after focus in the Jidoka section), do not commit blindly: commit and push the work so far, then return a Jidoka stop to the coordinator instead of silently continuing.
Commit — stage all changes and commit with a message that references the phase. Use the conventional format from the repo's recent history.
Push —
git push.
Sub-agent: revert & split
A phase is too big when:
- Changes span many unrelated files with no clear single behavior emerging.
- Tests are not converging after reasonable effort.
When this happens:
git checkout .— revert all uncommitted changes.git clean -fd— remove untracked files from the attempt.- Invoke the phased-planning skill to split the phase into sub-phases.
- Update the plan file: replace the original phase with the sub-phases.
- Commit and push the updated plan file.
- Return a "reverted and split" result to the coordinator.
Sub-phases follow the same rules — if a sub-phase is still too big, split again.
Reading the plan file
Plans live in ongoing/*.md. Each phase typically looks like:
### Phase N: Short description
Status: planned / in-progress / done
Details about what to implement...
Sub-phase documents (ongoing/<plan-name>-<phase-number>-sub-phases.md) use
the same format with sub-phase headings. The executor treats both identically.
The executor recognizes phases by headings and status markers. When closing a phase, update its status and prune/adjust as described in the wrap-up checklist; otherwise leave unrelated parts of the plan intact.
Reporting
When the loop ends (either all phases done or a stop condition), provide:
- Summary — which phases were completed this run.
- Current state — what the plan looks like now.
- Next action — what the developer needs to do or decide (if stopped).