Populate Phase State
Generate .claude/phase-state.json from the active greenfield execution plan and git history.
Use this command when:
- Starting to use the orchestrator on an existing project
- phase-state.json is missing or corrupted
- State has drifted from actual progress
Workflow
Copy this checklist and track progress:
Populate State Progress:
- [ ] Directory guard (verify main execution plan exists)
- [ ] Ensure .claude directory exists
- [ ] Parse the main execution plan (phases, tasks, criteria)
- [ ] Parse git history (commits, branches, timestamps)
- [ ] Detect features (features/*/EXECUTION_PLAN.md)
- [ ] Identify blockers (BLOCKED markers, stale tasks)
- [ ] Generate .claude/phase-state.json
- [ ] Determine task and phase statuses
- [ ] Output summary report
Directory Guard (Wrong Directory Check)
Before starting:
- If the current directory appears to be the toolkit repo (e.g.,
.toolkit-markerexists), STOP and tell the user to run/populate-statefrom their project directory instead. - Resolve the main execution plan in this order:
EXECUTION_PLAN.mdin the current working directoryplans/greenfield/EXECUTION_PLAN.mdin the current working directory
- If neither exists, STOP and tell the user to
cdinto the directory containing the activeEXECUTION_PLAN.mdand re-run/populate-state.
Instructions
Ensure directory exists
mkdir -p .claudeParse the main execution plan to extract:
- Total phases (count
## Phase Nheaders) - Tasks per phase (count
#### Task X.Y.Zheaders) - Completion status per task (count
- [x]vs- [ ]in acceptance criteria) - A task is COMPLETE if ALL its acceptance criteria are
[x]
- Total phases (count
Parse git history to extract:
- Task completion timestamps (from commits matching
task(X.Y.Z):) - Phase branches (from branches matching
phase-N) - Last activity date per phase
- Task completion timestamps (from commits matching
Detect features by scanning for:
features/*/EXECUTION_PLAN.mdfiles- Parse each feature's execution plan the same way
Identify blockers by scanning the main execution plan for:
- Tasks with
**Status:** BLOCKEDmarker - Tasks with incomplete criteria that have no recent git activity (7+ days)
- Mark these as potentially blocked
- Tasks with
Generate
.claude/phase-state.jsonwith this structure:
{
"schema_version": "1.0",
"project_name": "{from directory name}",
"last_updated": "{ISO timestamp}",
"generated_by": "populate-state",
"main": {
"current_phase": 2,
"total_phases": 6,
"status": "IN_PROGRESS",
"phases": [
{
"number": 1,
"name": "Foundation",
"status": "COMPLETE",
"tasks_total": 8,
"tasks_complete": 8,
"completed_at": "2026-01-10T14:22:00Z"
},
{
"number": 2,
"name": "Core Features",
"status": "IN_PROGRESS",
"tasks_total": 12,
"tasks_complete": 5,
"started_at": "2026-01-11T09:00:00Z",
"tasks": {
"2.1.A": {"status": "COMPLETE", "completed_at": "..."},
"2.1.B": {"status": "COMPLETE", "completed_at": "..."},
"2.2.A": {"status": "IN_PROGRESS", "failures": {"consecutive": 0, "verification_attempts": {}, "last_errors": []}},
"2.2.B": {"status": "NOT_STARTED"},
"2.3.A": {"status": "BLOCKED", "blocker": "Needs API key", "since": "...", "failures": {"consecutive": 1, "verification_attempts": {"V-003": 3}, "last_errors": ["timeout connecting to API"]}}
}
}
]
},
"features": {
"improved_metrics": {
"path": "features/improved_metrics",
"current_phase": 2,
"total_phases": 4,
"status": "IN_PROGRESS",
"phases": [...]
}
}
}
Determine task status using this logic:
COMPLETE: All acceptance criteria are[x]AND git commit exists for taskIN_PROGRESS: Some criteria are[x]OR git commit exists but not all criteria doneBLOCKED: Has**Status:** BLOCKEDmarker OR stale (7+ days, incomplete)NOT_STARTED: No criteria are[x]AND no git commit for task
Determine phase status using this logic:
COMPLETE: All tasks are COMPLETEIN_PROGRESS: At least one task is IN_PROGRESS or COMPLETE, but not all COMPLETEBLOCKED: Current task is BLOCKEDNOT_STARTED: No tasks have any progress
Output summary after generation:
Phase State Generated: .claude/phase-state.json
Main Project: Phase 2 of 6 (IN_PROGRESS)
- Phase 1: COMPLETE (8/8 tasks)
- Phase 2: IN_PROGRESS (5/12 tasks, 1 blocked)
Features:
- improved_metrics: Phase 2 of 4 (IN_PROGRESS)
- github_oauth: Phase 3 of 4 (IN_PROGRESS)
Blockers Found: 2
- Task 2.3.A: Needs API key (blocked 3 days)
- Feature improved_metrics Task 2.1.C: Test failures (blocked 1 day)
Error Handling
| Situation | Action |
|---|---|
| No main execution plan found in working directory | STOP and tell user to cd into the directory containing the active EXECUTION_PLAN.md |
| Main execution plan has non-standard phase/task headers that cannot be parsed | Report which headers were unrecognized, generate state for parseable phases, and warn about skipped sections |
| Git history is unavailable (not a git repo or shallow clone) | Skip git-based timestamp and commit detection; derive status solely from checkbox state in the main execution plan |
.claude/ directory cannot be created (permissions issue) |
Report the permission error and suggest running with appropriate permissions or creating the directory manually |
Existing phase-state.json is malformed or from an incompatible schema version |
Overwrite it with freshly generated state and warn user that the previous file was replaced |
Notes
- This command is read-only for the main execution plan - it only generates state
- If phase-state.json exists, it will be overwritten
- Run this after manually updating execution-plan checkboxes
- The orchestrator can trigger this command on projects missing phase-state.json