Sprint Planner
Instructions
Step 1: Gather Context
Ask the user for:
- Sprint goal (one sentence describing the sprint's purpose)
- Sprint duration (default: 2 weeks)
- Team members (names and roles)
Then fetch current project state:
Use Linear MCP: list_issues with status "In Progress" or "Backlog"
Step 2: Analyze Capacity
Based on team size and sprint duration, calculate:
- Total story points available: team_size x 10 points per person per sprint
- Already committed: sum of in-progress issue points
- Available capacity: total - committed
Tell the user: "Your team has ~{available} points of capacity this sprint."
Step 3: Create Task Breakdown
For each piece of work the user describes:
- Title: Short, action-oriented (e.g., "Add password reset flow")
- Description: What "done" looks like in 2-3 sentences
- Estimate: Story points (1 = few hours, 3 = a day, 5 = 2-3 days, 8 = a week)
- Priority: Urgent / High / Medium / Low
- Labels: Feature, Bug, Tech Debt, or Infrastructure
Present the full list to the user for approval BEFORE creating anything.
Step 4: Create in Linear
After user approves:
For each task, call Linear MCP: create_issue
Parameters:
- title: from breakdown
- description: from breakdown
- estimate: story points
- priority: mapped to Linear priority (1-4)
- labels: from breakdown
- assignee: if user specified
Confirm each creation. If any fail, report which ones and why.
Step 5: Summary
Provide a sprint summary:
- Total tasks created
- Total story points committed
- Capacity remaining
- Any risks (over-committed, unbalanced workload)
Examples
Example 1: Small Sprint
User says: "Plan a sprint for our auth improvements"
Actions:
- Fetch current Linear backlog
- Ask about team and goals
- Suggest breakdown: "Add SSO login" (5pts), "Fix session timeout bug" (3pts), "Add rate limiting" (3pts)
- User approves
- Create 3 issues in Linear
Result: 3 tasks created, 11 points committed, sprint ready.
Example 2: Large Feature Breakdown
User says: "Break down the checkout redesign into sprint tasks"
Actions:
- Ask user to describe the checkout flow changes
- Break into atomic tasks (no task > 8 points)
- Suggest ordering by dependency
- Flag if total exceeds sprint capacity
Troubleshooting
Error: "Issue creation failed — authentication error" Cause: Linear API token expired or missing permissions. Solution: Ask user to reconnect Linear in Settings > Extensions.
Error: "Team not found"
Cause: Team name doesn't match Linear workspace.
Solution: Use list_teams via Linear MCP to show available teams.
Sprint seems overloaded If total points > 80% of capacity, warn: "This sprint is at {percent}% capacity. Consider moving {lowest_priority_task} to the backlog."