update-project-trackers
Manage project tracking for the libgraphql workspace via project-tracker.md files and code TODO comments.
Overview
The libgraphql project tracks work in two ways:
project-tracker.mdfiles — Structured tracking documents at crate roots and workspace root- Code TODOs — Inline comments marking work to be done
This skill keeps these synchronized and helps prioritize work.
File Hierarchy
libgraphql/
├── project-tracker.md # Workspace-level items (outside crates)
└── crates/
├── libgraphql-parser/project-tracker.md # Parser crate
├── libgraphql-core/project-tracker.md # Core crate
└── libgraphql-macros/project-tracker.md # Macros crate
Rule: TODOs go to the nearest project-tracker.md — if in a crate, use that crate's file; otherwise use the root.
Workflows
1. Sync TODOs from Codebase
When asked to sync or update project trackers:
- Run
.claude/skills/update-project-trackers/scripts/scan_todos.py <repo-path>to find all TODOs - For each
project-tracker.mdfile, compare found TODOs against the "Appendix: Code TODOs" table - New TODOs: Present them to the user for review before adding to the appropriate section
- Missing TODOs: If a TODO in the appendix no longer exists in code, it may have been completed or removed — investigate and update accordingly
- Regenerate the "Appendix: Code TODOs" table
- Update "Last Updated" date
2. Mark Work Complete
When asked to mark something done:
- Locate the item by section number (e.g., "2.1") or description
- Wholly complete:
- Move to "Past Completed Work" section with title, terse description, and date
- Check all "Definition of Done" boxes
- Partially complete:
- Leave in place
- Update "Current Progress" to reflect what's done
- Update description to reflect remaining work
- NEVER re-number identifiers — IDs like 2.1, 4.3 must remain stable
- Update "Last Updated" date
3. Add New Task
When asked to track a new task:
- Determine the appropriate
project-tracker.mdfile based on which crate it affects - Determine the appropriate section (or create a new section if needed)
- Draft the new item following the format in
references/project_tracker_format.md - Present to user for review before adding
- Assign the next available ID within that section (never reuse IDs)
- Update "Last Updated" date
4. Identify High-Impact Work
When asked what to work on next:
- First, sync TODOs and update all
project-tracker.mdfiles - Analyze by priority markers (HIGH/MEDIUM/LOW) in the Priority Summary
- Consider dependencies (blocked items vs ready items)
- Consider scope (quick wins vs large efforts)
- Present top 3-5 recommendations with rationale
TODO Comment Patterns
Scan for these patterns in .rs files:
Explicit markers:
// TODO:or// TODO— Standard TODO// FIXME:or// FIXME— Bug or broken code// NOTE:— May indicate future consideration. Exclude these if they only explain something but do not indicate a need to come back and change or otherwise take action on something.// HACK:— Temporary solution needing cleanup
Semantic patterns (use judgment):
- Comments mentioning "fix this", "clean up", "reconsider", "revisit"
- Comments about "temporary", "workaround", "should be changed"
- Comments with future tense about changes ("will need to", "should eventually")
Not every comment needs to become a tracked item — only clear action items.
project-tracker.md Format
See references/project_tracker_format.md for the full template.
General style:
- All markdown table cells in a column should have consistent width for human-readability
Key sections:
- Current State Summary — Test counts, implementation status
- Numbered Sections — Grouped by category (Testing, Performance, etc.)
- Priority Summary — HIGH/MEDIUM/LOW categorization
- Past Completed Work — Archive of finished items
- Appendix: Code TODOs — Auto-generated table of inline TODOs
Each item includes:
- Purpose — Why this matters
- Current Progress — What's done
- Priority — HIGH/MEDIUM/LOW
- Tasks — Numbered subtasks
- Definition of Done — Checkboxes for completion criteria
Important Rules
Stable IDs: Never renumber items. If Section 2.1 is completed, the next item in Section 2 is 2.7 (or whatever follows), not 2.1.
Always regenerate Code TODOs appendix when updating any
project-tracker.md.Ask before adding: New items from TODO scans should be presented for user review.
Update timestamps: Always update "Last Updated" date when modifying a
project-tracker.md.Terse completions: When moving to "Past Completed Work", use only a title and one-line description.
Converted and distributed by TomeVault — claim your Tome and manage your conversions.