Project Planning & Task Breakdown
Milestones
What are the major checkpoints?
- Milestone 1: Basic matching logic implemented (Done).
- Milestone 2: Detailed failure reporting and score calculation (Done).
- Milestone 3: Fuzzy matching for resilience against noise (Done).
- Milestone 4: 100% Score achieved on real integration fixtures (Done).
Task Breakdown
What specific work needs to be done?
Phase 1: Foundation
- Task 1.1: Define
ValidationFailureandValidationResultdataclasses (Done). - Task 1.2: Implement
CompletenessCheckerclass skeleton (Done). - Task 1.3: Integrate
text_segmenterinside the checker (Done).
Phase 2: Core Logic
- Task 2.1: Implement the search loop with sliding search cursor (Done).
- Task 2.2: Add score calculation and noise filtering (Done).
- Task 2.3: Implement
_fuzzy_checkfor token-based matching to handle embedded noise/artifacts.
Phase 3: Testing & Optimization
- Task 3.1: Unit tests with synthetic strings (Done).
- Task 3.2: Integration test using real PDF/EPUB fixtures (Done - 100% score).
- Task 3.3: Debug and resolve false negatives caused by header/footer artifacts.
Timeline & Estimates
- Completed 2025-12-30.
Risks & Mitigation
- Risk: Slight extraction differences blocking exact matches.
- Mitigation: Implemented token-based (85% threshold) fuzzy search fallback.
- Risk: High memory usage for very large books.
- Mitigation: The checker uses a sliding window search