⚠️ Community-contributed command — not part of the officially-maintained ArcKit baseline. Output should be reviewed by qualified Vergabejurist / Rechtsabteilung before reliance. Citations to Bundesvergabegesetz 2018 (BVergG 2018) / EU directive transpositions may lag the current text — verify against the source. Items marked [NEEDS VERIFICATION] must be confirmed against the current BVergG 2018 text (as amended by the Vergaberechtsgesetz 2026, BGBl. I Nr. 8/2026) and the latest EU threshold regulation before external use — thresholds are updated every two years.
You are helping an enterprise architect generate Austrian public procurement documentation aligned with the Bundesvergabegesetz 2018 (BVergG 2018, BGBl. I Nr. 65/2018), as amended most recently by the Vergaberechtsgesetz 2026 (BGBl. I Nr. 8/2026 — the largest procurement reform since 2018; in force 1 March 2026, with the new Bekanntmachungen/eForms rules from 1 October 2026), and relevant secondary rules (BVergGVS, BVergGKonz, sectoral instruments). The Vergaberechtsgesetz 2026 is a Novelle: the BVergG 2018 keeps its name and paragraph numbering. Procedures started before 1 March 2026 continue under the pre-reform BVergG 2018.
User Input
$ARGUMENTS
Instructions
Note: Before generating, scan projects/ for existing project directories. For each project, list all ARC-*.md artifacts, check external/ for reference documents, and check 000-global/ for cross-project policies. If no external docs exist but they would improve output, ask the user.
Step 0: Read existing artifacts from the project context
MANDATORY (warn if missing):
- REQ (Requirements) — Extract: functional requirements (FR-xxx) for procurement scope, non-functional requirements (NFR-xxx), integration requirements (INT-xxx), data sovereignty and security requirements
- If missing: warn that procurement documentation requires defined requirements to produce a valid Leistungsbeschreibung
RECOMMENDED (read if available, note if missing):
- RISK (Risk Register) — Extract: vendor risks, technology risks, lock-in risks, sovereignty risks, supply chain risks
- ATNISG (AT NISG Assessment) — Extract: supply chain obligations for Essential/Important entities to include as contract clauses
- ATDSG (AT DSG Assessment) — Extract: data protection clauses for Auftragsverarbeitung (processor) engagements
- SECD (Secure by Design) — Extract: security controls that must be contractually required of the supplier
OPTIONAL (read if available, skip silently):
- PRIN (Architecture Principles, 000-global) — Extract: open source policy, cloud strategy, technology standards
- DATA (Data Model) — Extract: data categories (health data → ELGA/HDS clause, personal data → DPA clause)
Step 0b: Read external documents and policies
- Read any external documents in
external/ — extract previous procurement files (Ausschreibungsunterlagen), ANKÖ publication records, BBG framework references, budget documents, existing supplier contracts
- Read any global policies in
000-global/policies/ — extract procurement policy, open source policy, data classification policy
- If procurement-related external documents found, use them to pre-populate threshold analysis and budget constraints.
Step 1: Identify or Create Project
Identify the target project from the hook context. If the project doesn't exist:
- Use Glob to list
projects/*/ directories and find the highest NNN-* number
- Calculate the next number (zero-padded to 3 digits)
- Slugify the project name
- Use the Write tool to create
projects/{NNN}-{slug}/README.md and projects/{NNN}-{slug}/vendors/README.md
- Set
PROJECT_ID and PROJECT_PATH
Step 2: Read Source Artifacts
Read all documents from Step 0. Extract key information for the procurement file:
- Total estimated value (Auftragswert, excl. VAT) — from requirements or user input
- Contracting authority type (klassischer Sektor vs Sektorenauftraggeber) — affects thresholds and rules
- Data categories (drives sovereignty, HDS/ELGA, and DPA clauses)
- Security classification level (drives NISG supply-chain clauses)
- Cloud involvement (drives BRZ / sovereign cloud and data-location requirements)
Step 3: Template Reading
Read the template (with user override support):
- First, check if
.arckit/templates-custom/at-bvergg-template.md exists in the project root
- If found: Read the user's customized template
- If not found: Read
.arckit/templates/at-bvergg-template.md
- Then read
.arckit/templates/_partials/RENDERING.md and resolve the <!-- DOC-CONTROL-HEADER --> marker in the template before writing. BVERGG carries the Austria regime, which hard-routes to _partials/document-control-at.md whatever the operator's user config says.
Step 4: Threshold Analysis
Before generating the document, determine the applicable procedure. EU thresholds are updated every 2 years — the values below reflect the three Commission Delegated Regulations of 22 October 2025, all in force from 1 January 2026 for the 2026–2027 period: (EU) 2025/2152 amends Directive 2014/24/EU (classical sectors — the central and sub-central supplies/services and works figures), (EU) 2025/2150 amends Directive 2014/25/EU (Sektorenauftraggeber / utilities), and (EU) 2025/2151 amends Directive 2014/23/EU (concessions). Cite the regulation matching the tier — the utilities figure is not from 2025/2152. Verify against the current Delegierte Verordnung and the §12 BVergG 2018 transposition before use.
Domestic reform (Vergaberechtsgesetz 2026): the temporary Schwellenwerteverordnung has lapsed; the raised domestic Direktvergabe values are now permanent statutory law under the Vergaberechtsgesetz 2026 (BGBl. I Nr. 8/2026), in force 1 March 2026. New documentation rule: from €50,000, a Direktvergabe must document the attempt to obtain at least three Vergleichsangebote or Preisauskünfte.
| Threshold Tier |
Auftragswert (excl. VAT) |
Procedure |
Publication |
| Direktvergabe — supplies/services (§46) |
< €143,000 (for central/Bund authorities effectively capped at the €140,000 EU Oberschwelle) |
Direct award (no formal procedure) |
Informal |
| Direktvergabe — works/Bau (§46) |
< €200,000 |
Direct award (no formal procedure) |
Informal |
| Direktvergabe mit vorheriger Bekanntmachung (§47) |
domestic Unterschwellen instrument |
Direct award with notice |
ANKÖ |
| Unterschwellenbereich (non-open) |
Up to EU threshold |
Verhandlungsverfahren / nicht-offen |
ANKÖ |
| Oberschwellenbereich — classical, central govt (Bund) (supplies/services) |
≥ €140,000 |
Offenes / Nicht-offenes / Verhandlungsverfahren |
ANKÖ + TED |
| Oberschwellenbereich — classical, sub-central (supplies/services) |
≥ €216,000 |
Offenes / Nicht-offenes / Verhandlungsverfahren |
ANKÖ + TED |
| Oberschwellenbereich — Sektorenauftraggeber (supplies/services) |
≥ €432,000 (VO (EU) 2025/2150) |
Sektor rules |
ANKÖ + TED |
| Bauaufträge (Works) — Oberschwellenbereich |
≥ €5,404,000 |
Same as supplies/services |
ANKÖ + TED |
Show threshold determination to the user before generating the full document. Confirm:
- Contracting authority classification (klassisch / Sektor / subsidised under §4 BVergG)
- Whether value aggregation across lots / framework agreement applies (§13 BVergG)
- Whether §9 BVergG exceptions apply (e.g. in-house exemption, inter-authority cooperation)
Step 5: Generate Procurement Documentation
CRITICAL: Use the Write tool to create the procurement document.
Detect version: Check for existing ARC-{PROJECT_ID}-BVERGG-v*.md files:
- No existing file → VERSION="1.0"
- Existing file → minor increment for updates, major for procedure change
Auto-populate Document Control:
- Document ID:
ARC-{PROJECT_ID}-BVERGG-v{VERSION}
- Status: DRAFT
- Created Date: {current_date}
- Next Review Date: {current_date + 6 months}
- Classification: Offen (rising to Eingeschränkt while in draft); procurement docs become public at publication.
- Auftragswert, procedure and threshold tier captured in header
Section 1: Contracting Authority and Procedure
- Legal identity of the Auftraggeber and classification (klassisch / Sektor / subsidised)
- Applicable BVergG 2018 provisions
- Selected procedure (Offen / Nicht-offen / Verhandlungsverfahren mit/ohne Bekanntmachung / Wettbewerblicher Dialog / Innovationspartnerschaft)
- Justification for procedure choice (especially for non-open procedures)
- Framework agreement (Rahmenvereinbarung) considerations if applicable
Section 2: Leistungsbeschreibung (Requirements Statement)
- Functional scope derived from REQ (FR-xxx)
- Non-functional requirements (performance, availability, security)
- Integration scope (INT-xxx)
- Data sovereignty and location requirements
- Open standards and interoperability requirements
- Barrier-free / Accessibility (§107 BVergG / EN 301 549) requirements — cite EN 301 549 v3.2.1, the version cited in the Official Journal and therefore the one carrying a presumption of conformity; it normatively references WCAG 2.1 AA. Do not set WCAG 2.2 AA as the contractual baseline: the revision carrying it (v4.1.1) is expected to be OJ-cited around October 2026
[NEEDS VERIFICATION: confirm the OJ citation date and version], so name 2.2 AA only as a forward-looking requirement where the contract runs past that date
Section 3: Eignung (Suitability Criteria)
- Berufliche Zuverlässigkeit (trade registration, no Ausschlussgründe under §78 BVergG — the Vergaberechtsgesetz 2026 harmonised the exclusion-ground offences and clarified the Selbstreinigung/self-cleaning rules)
- Wirtschaftliche und finanzielle Leistungsfähigkeit (financial criteria)
- Technische Leistungsfähigkeit (references, certifications)
- ISO 27001 / ISO 22301 / ISO 9001 where justified and proportionate
- Maximum document burden — proportionality under §20 BVergG
Section 4: Zuschlagskriterien (Award Criteria)
- Best-price or best-price-performance ratio (Bestbieterprinzip) — BVergG default is Bestbieter for most supplies/services
- Criteria table with weightings (price %, quality %, sustainability %, innovation %)
- Sub-criteria and scoring methodology
- Disclose scoring formulas in the notice
Section 5: Vertragliche Regelungen (Contractual Terms)
- Service Level Agreement (SLA) requirements
- Data processing addendum (Auftragsverarbeitung, Art. 28 GDPR + DSG)
- NISG supply chain clauses (if contracting authority is Essential/Important)
- Intellectual property / open-source handling
- Exit management / transition obligations
- Sovereign/Austrian hosting or EU-only data-residency clauses where required
- Penalty (Vertragsstrafe) and termination rights
- Applicable law: Austrian law; jurisdiction
Section 6: Publication and Timeline
- ANKÖ publication (mandatory for most above-threshold)
- TED publication for Oberschwellenbereich
- eForms (Digital-by-Default): from 1 October 2026 the Vergaberechtsgesetz 2026 requires standardised electronic forms for Bekanntmachungen and Bekanntgaben including in the Unterschwellenbereich
- Minimum Angebotsfrist per §§71–76 BVergG (above-threshold open procedure: min. 30 days, classical sector)
- Bidder question window (Bewerberfragen) and answers (Q&A published to all)
- Opening session (Angebotsöffnung) formalities
- Standstill period (Stillhaltefrist) and notifications
- Contract award (Zuschlag) announcement
Section 7: Review and Remedies (BVergG Book 4)
- Review before the Bundesverwaltungsgericht (BVwG) for Bundesvergaben
- Landesverwaltungsgerichte for Land procurements
- Application fees: the Vergaberechtsgesetz 2026 replaced the flat Pauschalgebühren with a tiered fee system with defined value categories; interim measures (einstweilige Verfügung) available
- Standstill period compliance
- Record-keeping for defensibility
Section 8: Documentation and File
- Vergabeakt (procurement file) structure expected by audit bodies (Rechnungshof, EU auditors)
- Retention obligations
- Audit trail of decisions and justifications
- Annex: self-declaration forms (Eigenerklärung / ESPD)
Before writing the file, read .arckit/references/quality-checklist.md and verify all Common Checks pass.
Write the document to:
projects/{project_id}/ARC-{PROJECT_ID}-BVERGG-v{VERSION}.md
Step 6: Summary Output
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
✅ AT BVergG Procurement Documentation Generated
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
📄 Document: projects/{project_id}/ARC-{PROJECT_ID}-BVERGG-v{VERSION}.md
📋 Document ID: {document_id}
📅 Planned Publication Date: {date}
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
📋 Procedure Decision
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Auftragswert: €{value} (excl. VAT)
Tier: {Direktvergabe / Unterschwellen / Oberschwellen — classical / Sektor}
Procedure: {Offen / Nicht-offen / Verhandlung / etc.}
Publication: {ANKÖ only / ANKÖ + TED}
Minimum Angebotsfrist: {days}
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
⚡ Critical Actions
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
{List ⚠️ Items requiring Vergabejurist review before publication}
Next steps:
1. {If personal data: Include DPA from $arckit-at-dsgvo}
2. {If Essential/Important: Include NISG supply clauses from $arckit-at-nisg}
3. Legal review before ANKÖ publication
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
Important Notes
- Vergaberechtsgesetz 2026 (BGBl. I Nr. 8/2026): the largest reform since the BVergG 2018, in force 1 March 2026 (Bekanntmachungen/eForms from 1 October 2026). It amends the BVergG 2018 (name and numbering retained), makes the raised Direktvergabe limits permanent (supplies/services €143,000, works €200,000; from €50,000 document ≥3 Vergleichsangebote/Preisauskünfte), harmonises Ausschlussgründe and clarifies Selbstreinigung, tightens Rahmenvereinbarungen (binding Höchstwerte), mandates eForms including below-threshold, and replaces the flat Nachprüfungs-Pauschalgebühren with a tiered system. Procedures started before 1 March 2026 run out under the old text.
- Thresholds change every 2 years: EU Oberschwellenwerte are revised biennially. Always verify the current values against the latest Commission Delegated Regulation and BVergG text — do not rely on the indicative numbers without verification.
- Bundesvergaben vs Landesvergaben: BVergG 2018 covers federal procurement; Land procurement procedures may be subject to additional Landesgesetze. Confirm venue for review.
- ANKÖ publication is mandatory: Most above-threshold procedures require ANKÖ (Auftragnehmerkataster Österreich) publication. TED publication is additionally required for EU Oberschwellen.
- Bestbieter is the default: For most supplies and services, BVergG 2018 requires the best-price-performance-ratio criterion, not lowest-price. Justify clearly if using lowest-price only.
- NISG and DSG interplay: Where the contracting authority is an Essential / Important entity under NISG, or where personal data is processed, the contract must carry the corresponding supply-chain security and Auftragsverarbeitung clauses.
- Standstill period is a hard requirement: Non-observance of the Stillhaltefrist is a frequent basis for successful BVwG applications. Document timing precisely.
- Use Write Tool: BVergG procurement docs cover 8 sections with legal and technical content. Always use the Write tool.
Success Criteria
- ✅ Procurement document created at
projects/{project_id}/ARC-{PROJECT_ID}-BVERGG-v{VERSION}.md
- ✅ Contracting authority classification confirmed (klassisch / Sektor / subsidised)
- ✅ Threshold tier determined with current values verified
- ✅ Procedure selected with BVergG 2018 justification
- ✅ Leistungsbeschreibung traced to REQ (FR/NFR/INT)
- ✅ Eignungskriterien proportionate under §20 BVergG
- ✅ Zuschlagskriterien weighted and transparent (Bestbieterprinzip justified)
- ✅ DPA clauses included where personal data processed (Art. 28 GDPR + DSG)
- ✅ NISG supply-chain clauses included where applicable
- ✅ ANKÖ (and TED if Oberschwellen) publication plan
- ✅ Angebotsfrist and Stillhaltefrist compliant with BVergG
- ✅ Review pathway (BVwG / LVwG) documented
- ✅ Vergabeakt structure defined for defensibility
Example Usage
$arckit-at-bvergg Austrian procurement for 001 — federal digital identity platform, Auftragswert €1.8M, classical sector, Oberschwellenbereich, processes personal data, Essential entity under NISG
$arckit-at-bvergg BVergG 2018 procurement pack for a municipal water utility SCADA upgrade — Sektorenauftraggeber, Oberschwellenbereich, €3.2M, Essential entity
$arckit-at-bvergg Direct award for a €60K proof-of-concept integration, classical sector, no personal data
Suggested Next Steps
After completing this command, consider running:
$arckit-evaluate -- Score vendor responses against the award criteria defined in this document (when Tenders received and ready for evaluation)
$arckit-traceability -- Link procurement requirements back to functional and non-functional requirements
$arckit-at-dsgvo -- Include GDPR/DPA obligations in procurement documentation where personal data processed (when Procurement involves processors of personal data)
$arckit-at-nisg -- Reflect NISG supply chain obligations in vendor security clauses (when Contracting entity is Essential or Important under NISG)
1---2name: arckit-at-bvergg3description: [COMMUNITY] Generate Austrian public procurement documentation aligned with Bundesvergabegesetz 2018 — Oberschwellen/Unterschwellen determination, ANKÖ publication, BVergGVS secondary rules, and BVwG review pathway4---56> ⚠️ **Community-contributed command** — not part of the officially-maintained ArcKit baseline. Output should be reviewed by qualified Vergabejurist / Rechtsabteilung before reliance. Citations to Bundesvergabegesetz 2018 (BVergG 2018) / EU directive transpositions may lag the current text — verify against the source. Items marked `[NEEDS VERIFICATION]` must be confirmed against the **current BVergG 2018 text (as amended by the Vergaberechtsgesetz 2026, BGBl. I Nr. 8/2026) and the latest EU threshold regulation** before external use — thresholds are updated every two years.78You are helping an enterprise architect generate **Austrian public procurement documentation** aligned with the Bundesvergabegesetz 2018 (BVergG 2018, BGBl. I Nr. 65/2018), **as amended most recently by the Vergaberechtsgesetz 2026 (BGBl. I Nr. 8/2026 — the largest procurement reform since 2018; in force 1 March 2026, with the new Bekanntmachungen/eForms rules from 1 October 2026)**, and relevant secondary rules (BVergGVS, BVergGKonz, sectoral instruments). The Vergaberechtsgesetz 2026 is a Novelle: the BVergG 2018 keeps its name and paragraph numbering. Procedures started before 1 March 2026 continue under the pre-reform BVergG 2018.910## User Input1112```text13$ARGUMENTS14```1516## Instructions1718> **Note**: Before generating, scan `projects/` for existing project directories. For each project, list all `ARC-*.md` artifacts, check `external/` for reference documents, and check `000-global/` for cross-project policies. If no external docs exist but they would improve output, ask the user.1920### Step 0: Read existing artifacts from the project context2122**MANDATORY** (warn if missing):2324- **REQ** (Requirements) — Extract: functional requirements (FR-xxx) for procurement scope, non-functional requirements (NFR-xxx), integration requirements (INT-xxx), data sovereignty and security requirements25 - If missing: warn that procurement documentation requires defined requirements to produce a valid Leistungsbeschreibung2627**RECOMMENDED** (read if available, note if missing):2829- **RISK** (Risk Register) — Extract: vendor risks, technology risks, lock-in risks, sovereignty risks, supply chain risks30- **ATNISG** (AT NISG Assessment) — Extract: supply chain obligations for Essential/Important entities to include as contract clauses31- **ATDSG** (AT DSG Assessment) — Extract: data protection clauses for Auftragsverarbeitung (processor) engagements32- **SECD** (Secure by Design) — Extract: security controls that must be contractually required of the supplier3334**OPTIONAL** (read if available, skip silently):3536- **PRIN** (Architecture Principles, 000-global) — Extract: open source policy, cloud strategy, technology standards37- **DATA** (Data Model) — Extract: data categories (health data → ELGA/HDS clause, personal data → DPA clause)3839### Step 0b: Read external documents and policies4041- Read any **external documents** in `external/` — extract previous procurement files (Ausschreibungsunterlagen), ANKÖ publication records, BBG framework references, budget documents, existing supplier contracts42- Read any **global policies** in `000-global/policies/` — extract procurement policy, open source policy, data classification policy43- If procurement-related external documents found, use them to pre-populate threshold analysis and budget constraints.4445### Step 1: Identify or Create Project4647Identify the target project from the hook context. If the project doesn't exist:48491. Use Glob to list `projects/*/` directories and find the highest `NNN-*` number502. Calculate the next number (zero-padded to 3 digits)513. Slugify the project name524. Use the Write tool to create `projects/{NNN}-{slug}/README.md` and `projects/{NNN}-{slug}/vendors/README.md`535. Set `PROJECT_ID` and `PROJECT_PATH`5455### Step 2: Read Source Artifacts5657Read all documents from Step 0. Extract key information for the procurement file:5859- Total estimated value (Auftragswert, excl. VAT) — from requirements or user input60- Contracting authority type (klassischer Sektor vs Sektorenauftraggeber) — affects thresholds and rules61- Data categories (drives sovereignty, HDS/ELGA, and DPA clauses)62- Security classification level (drives NISG supply-chain clauses)63- Cloud involvement (drives BRZ / sovereign cloud and data-location requirements)6465### Step 3: Template Reading6667**Read the template** (with user override support):6869- **First**, check if `.arckit/templates-custom/at-bvergg-template.md` exists in the project root70- **If found**: Read the user's customized template71- **If not found**: Read `.arckit/templates/at-bvergg-template.md`72- **Then read** `.arckit/templates/_partials/RENDERING.md` and resolve the `<!-- DOC-CONTROL-HEADER -->` marker in the template before writing. `BVERGG` carries the Austria regime, which hard-routes to `_partials/document-control-at.md` whatever the operator's user config says.7374### Step 4: Threshold Analysis7576Before generating the document, determine the applicable procedure. **EU thresholds are updated every 2 years** — the values below reflect the three Commission Delegated Regulations of 22 October 2025, all in force from **1 January 2026** for the **2026–2027** period: **(EU) 2025/2152** amends Directive 2014/24/EU (classical sectors — the central and sub-central supplies/services and works figures), **(EU) 2025/2150** amends Directive 2014/25/EU (**Sektorenauftraggeber / utilities**), and **(EU) 2025/2151** amends Directive 2014/23/EU (concessions). Cite the regulation matching the tier — the utilities figure is **not** from 2025/2152. Verify against the current Delegierte Verordnung and the §12 BVergG 2018 transposition before use.7778> **Domestic reform (Vergaberechtsgesetz 2026)**: the temporary Schwellenwerteverordnung has lapsed; the raised domestic Direktvergabe values are now **permanent statutory law** under the **Vergaberechtsgesetz 2026 (BGBl. I Nr. 8/2026)**, in force **1 March 2026**. New documentation rule: from **€50,000**, a Direktvergabe must document the attempt to obtain **at least three Vergleichsangebote or Preisauskünfte**.7980| Threshold Tier | Auftragswert (excl. VAT) | Procedure | Publication |81|----------------|--------------------------|-----------|-------------|82| **Direktvergabe** — supplies/services (§46) | < €143,000 (for central/Bund authorities effectively capped at the €140,000 EU Oberschwelle) | Direct award (no formal procedure) | Informal |83| **Direktvergabe** — works/Bau (§46) | < €200,000 | Direct award (no formal procedure) | Informal |84| **Direktvergabe mit vorheriger Bekanntmachung** (§47) | domestic Unterschwellen instrument | Direct award with notice | ANKÖ |85| **Unterschwellenbereich** (non-open) | Up to EU threshold | Verhandlungsverfahren / nicht-offen | ANKÖ |86| **Oberschwellenbereich — classical, central govt (Bund)** (supplies/services) | ≥ €140,000 | Offenes / Nicht-offenes / Verhandlungsverfahren | ANKÖ + TED |87| **Oberschwellenbereich — classical, sub-central** (supplies/services) | ≥ €216,000 | Offenes / Nicht-offenes / Verhandlungsverfahren | ANKÖ + TED |88| **Oberschwellenbereich — Sektorenauftraggeber** (supplies/services) | ≥ €432,000 (VO (EU) 2025/2150) | Sektor rules | ANKÖ + TED |89| **Bauaufträge (Works)** — Oberschwellenbereich | ≥ €5,404,000 | Same as supplies/services | ANKÖ + TED |9091Show threshold determination to the user before generating the full document. Confirm:9293- Contracting authority classification (klassisch / Sektor / subsidised under §4 BVergG)94- Whether value aggregation across lots / framework agreement applies (§13 BVergG)95- Whether §9 BVergG exceptions apply (e.g. in-house exemption, inter-authority cooperation)9697### Step 5: Generate Procurement Documentation9899**CRITICAL**: Use the **Write tool** to create the procurement document.1001011. **Detect version**: Check for existing `ARC-{PROJECT_ID}-BVERGG-v*.md` files:102 - No existing file → VERSION="1.0"103 - Existing file → minor increment for updates, major for procedure change1041052. **Auto-populate Document Control**:106 - Document ID: `ARC-{PROJECT_ID}-BVERGG-v{VERSION}`107 - Status: DRAFT108 - Created Date: {current_date}109 - Next Review Date: {current_date + 6 months}110 - Classification: **Offen** (rising to **Eingeschränkt** while in draft); procurement docs become public at publication.111 - Auftragswert, procedure and threshold tier captured in header1121133. **Section 1: Contracting Authority and Procedure**114 - Legal identity of the Auftraggeber and classification (klassisch / Sektor / subsidised)115 - Applicable BVergG 2018 provisions116 - Selected procedure (Offen / Nicht-offen / Verhandlungsverfahren mit/ohne Bekanntmachung / Wettbewerblicher Dialog / Innovationspartnerschaft)117 - Justification for procedure choice (especially for non-open procedures)118 - Framework agreement (Rahmenvereinbarung) considerations if applicable1191204. **Section 2: Leistungsbeschreibung (Requirements Statement)**121 - Functional scope derived from REQ (FR-xxx)122 - Non-functional requirements (performance, availability, security)123 - Integration scope (INT-xxx)124 - Data sovereignty and location requirements125 - Open standards and interoperability requirements126 - Barrier-free / Accessibility (§107 BVergG / EN 301 549) requirements — cite **EN 301 549 v3.2.1**, the version cited in the Official Journal and therefore the one carrying a presumption of conformity; it normatively references **WCAG 2.1 AA**. Do **not** set WCAG 2.2 AA as the contractual baseline: the revision carrying it (v4.1.1) is expected to be OJ-cited around October 2026 `[NEEDS VERIFICATION: confirm the OJ citation date and version]`, so name 2.2 AA only as a forward-looking requirement where the contract runs past that date1271285. **Section 3: Eignung (Suitability Criteria)**129 - Berufliche Zuverlässigkeit (trade registration, no Ausschlussgründe under §78 BVergG — the Vergaberechtsgesetz 2026 harmonised the exclusion-ground offences and clarified the Selbstreinigung/self-cleaning rules)130 - Wirtschaftliche und finanzielle Leistungsfähigkeit (financial criteria)131 - Technische Leistungsfähigkeit (references, certifications)132 - ISO 27001 / ISO 22301 / ISO 9001 where justified and proportionate133 - Maximum document burden — proportionality under §20 BVergG1341356. **Section 4: Zuschlagskriterien (Award Criteria)**136 - Best-price or best-price-performance ratio (Bestbieterprinzip) — BVergG default is Bestbieter for most supplies/services137 - Criteria table with weightings (price %, quality %, sustainability %, innovation %)138 - Sub-criteria and scoring methodology139 - Disclose scoring formulas in the notice1401417. **Section 5: Vertragliche Regelungen (Contractual Terms)**142 - Service Level Agreement (SLA) requirements143 - Data processing addendum (Auftragsverarbeitung, Art. 28 GDPR + DSG)144 - NISG supply chain clauses (if contracting authority is Essential/Important)145 - Intellectual property / open-source handling146 - Exit management / transition obligations147 - Sovereign/Austrian hosting or EU-only data-residency clauses where required148 - Penalty (Vertragsstrafe) and termination rights149 - Applicable law: Austrian law; jurisdiction1501518. **Section 6: Publication and Timeline**152 - ANKÖ publication (mandatory for most above-threshold)153 - TED publication for Oberschwellenbereich154 - **eForms (Digital-by-Default)**: from 1 October 2026 the Vergaberechtsgesetz 2026 requires standardised electronic forms for Bekanntmachungen and Bekanntgaben **including in the Unterschwellenbereich**155 - Minimum Angebotsfrist per §§71–76 BVergG (above-threshold open procedure: min. 30 days, classical sector)156 - Bidder question window (Bewerberfragen) and answers (Q&A published to all)157 - Opening session (Angebotsöffnung) formalities158 - Standstill period (Stillhaltefrist) and notifications159 - Contract award (Zuschlag) announcement1601619. **Section 7: Review and Remedies (BVergG Book 4)**162 - Review before the Bundesverwaltungsgericht (BVwG) for Bundesvergaben163 - Landesverwaltungsgerichte for Land procurements164 - Application fees: the Vergaberechtsgesetz 2026 replaced the flat Pauschalgebühren with a **tiered fee system with defined value categories**; interim measures (einstweilige Verfügung) available165 - Standstill period compliance166 - Record-keeping for defensibility16716810. **Section 8: Documentation and File**169 - Vergabeakt (procurement file) structure expected by audit bodies (Rechnungshof, EU auditors)170 - Retention obligations171 - Audit trail of decisions and justifications172 - Annex: self-declaration forms (Eigenerklärung / ESPD)173174Before writing the file, read `.arckit/references/quality-checklist.md` and verify all **Common Checks** pass.175176Write the document to:177178```text179projects/{project_id}/ARC-{PROJECT_ID}-BVERGG-v{VERSION}.md180```181182### Step 6: Summary Output183184```text185━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━186✅ AT BVergG Procurement Documentation Generated187━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━188189📄 Document: projects/{project_id}/ARC-{PROJECT_ID}-BVERGG-v{VERSION}.md190📋 Document ID: {document_id}191📅 Planned Publication Date: {date}192193━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━194📋 Procedure Decision195━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━196197Auftragswert: €{value} (excl. VAT)198Tier: {Direktvergabe / Unterschwellen / Oberschwellen — classical / Sektor}199Procedure: {Offen / Nicht-offen / Verhandlung / etc.}200Publication: {ANKÖ only / ANKÖ + TED}201Minimum Angebotsfrist: {days}202203━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━204⚡ Critical Actions205━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━206207{List ⚠️ Items requiring Vergabejurist review before publication}208209Next steps:2101. {If personal data: Include DPA from $arckit-at-dsgvo}2112. {If Essential/Important: Include NISG supply clauses from $arckit-at-nisg}2123. Legal review before ANKÖ publication213━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━214```215216## Important Notes217218- **Vergaberechtsgesetz 2026 (BGBl. I Nr. 8/2026)**: the largest reform since the BVergG 2018, in force 1 March 2026 (Bekanntmachungen/eForms from 1 October 2026). It amends the BVergG 2018 (name and numbering retained), makes the raised Direktvergabe limits permanent (supplies/services €143,000, works €200,000; from €50,000 document ≥3 Vergleichsangebote/Preisauskünfte), harmonises Ausschlussgründe and clarifies Selbstreinigung, tightens Rahmenvereinbarungen (binding Höchstwerte), mandates eForms including below-threshold, and replaces the flat Nachprüfungs-Pauschalgebühren with a tiered system. Procedures started before 1 March 2026 run out under the old text.219- **Thresholds change every 2 years**: EU Oberschwellenwerte are revised biennially. Always verify the current values against the latest Commission Delegated Regulation and BVergG text — do not rely on the indicative numbers without verification.220- **Bundesvergaben vs Landesvergaben**: BVergG 2018 covers federal procurement; Land procurement procedures may be subject to additional Landesgesetze. Confirm venue for review.221- **ANKÖ publication is mandatory**: Most above-threshold procedures require ANKÖ (Auftragnehmerkataster Österreich) publication. TED publication is additionally required for EU Oberschwellen.222- **Bestbieter is the default**: For most supplies and services, BVergG 2018 requires the best-price-performance-ratio criterion, not lowest-price. Justify clearly if using lowest-price only.223- **NISG and DSG interplay**: Where the contracting authority is an Essential / Important entity under NISG, or where personal data is processed, the contract must carry the corresponding supply-chain security and Auftragsverarbeitung clauses.224- **Standstill period is a hard requirement**: Non-observance of the Stillhaltefrist is a frequent basis for successful BVwG applications. Document timing precisely.225- **Use Write Tool**: BVergG procurement docs cover 8 sections with legal and technical content. Always use the Write tool.226227## Success Criteria228229- ✅ Procurement document created at `projects/{project_id}/ARC-{PROJECT_ID}-BVERGG-v{VERSION}.md`230- ✅ Contracting authority classification confirmed (klassisch / Sektor / subsidised)231- ✅ Threshold tier determined with current values verified232- ✅ Procedure selected with BVergG 2018 justification233- ✅ Leistungsbeschreibung traced to REQ (FR/NFR/INT)234- ✅ Eignungskriterien proportionate under §20 BVergG235- ✅ Zuschlagskriterien weighted and transparent (Bestbieterprinzip justified)236- ✅ DPA clauses included where personal data processed (Art. 28 GDPR + DSG)237- ✅ NISG supply-chain clauses included where applicable238- ✅ ANKÖ (and TED if Oberschwellen) publication plan239- ✅ Angebotsfrist and Stillhaltefrist compliant with BVergG240- ✅ Review pathway (BVwG / LVwG) documented241- ✅ Vergabeakt structure defined for defensibility242243## Example Usage244245```text246$arckit-at-bvergg Austrian procurement for 001 — federal digital identity platform, Auftragswert €1.8M, classical sector, Oberschwellenbereich, processes personal data, Essential entity under NISG247248$arckit-at-bvergg BVergG 2018 procurement pack for a municipal water utility SCADA upgrade — Sektorenauftraggeber, Oberschwellenbereich, €3.2M, Essential entity249250$arckit-at-bvergg Direct award for a €60K proof-of-concept integration, classical sector, no personal data251```252253## Suggested Next Steps254255After completing this command, consider running:256257- `$arckit-evaluate` -- Score vendor responses against the award criteria defined in this document *(when Tenders received and ready for evaluation)*258- `$arckit-traceability` -- Link procurement requirements back to functional and non-functional requirements259- `$arckit-at-dsgvo` -- Include GDPR/DPA obligations in procurement documentation where personal data processed *(when Procurement involves processors of personal data)*260- `$arckit-at-nisg` -- Reflect NISG supply chain obligations in vendor security clauses *(when Contracting entity is Essential or Important under NISG)*