Suede Clip to Guide
Build one evidence-backed path from a video moment to a deeper written asset.
Treat the clip as the attention layer and the guide as the authority layer. Do
not assume the pattern performs; test the bridge against the account baseline.
Default Success Blueprint
Use this as the recommended pattern when the rights, source, claim, platform,
and approval gates pass:
Useful guide with one promise
↓
Self-contained video moment
↓
Rights route + 8/10 moment score
↓
Clip hook + source credit + subtitles
↓
Post explains why the moment matters
↓
One explicit bridge to the guide
↓
Max Effort/Fleet: dual certainty gate
↓
Exact-content approval
↓
Public readback + clip-to-guide measurement
↓
Keep, revise, or stop from the observed result
Prefer this blueprint when:
- a guide already answers the natural next question created by the clip;
- the goal is deeper understanding, bookmarks, qualified replies, leads, or
authority rather than raw views alone;
- the selected moment passes the 8/10 score and claim-support threshold;
- the rights route and current platform sequence are recorded;
- the account can observe at least one clip metric and one guide-transition or
campaign metric.
Do not use it when:
- the guide is thin, unrelated, unpublished without a stable draft, or has no
specific promise;
- the clip needs missing context, distorts the source, or exists only because
it is popular;
- third-party reuse is blocked or the accountable fair-use decision is absent;
- the platform cannot preserve the source, clip, and guide bridge in a verified
sequence;
- the idea is complete in the short post and the guide would add no depth.
For a first test, build three distinct packages only when three moments pass all
gates. Compare them with the account's recent comparable posts. Keep the pattern
only if the named guide-transition or campaign metric meets the decision rule;
revise one variable at a time when it does not.
Non-Negotiable Gates
Apply these throughout the run. Resolve rights, source, and claims before
writing copy; resolve platform, certainty, and approval before a live action:
- Rights gate — classify the video as owned, licensed, permission-recorded,
native-repost-only, fair-use-review, or blocked. Public availability is not
reuse permission.
- Source gate — obtain the video, transcript or exact timestamps, guide
draft or URL, target platform, intended account, and desired next action.
- Claim gate — trace factual claims and quotations to the source. Label
interpretations as interpretations.
- Platform gate — inspect current official requirements and the live
composer before promising that media, quote-posts, article cards, links, or
replies can be combined.
- Approval gate — do not publish, schedule, repost, upload, reply, or edit
a live article until the user approves the exact media, copy, guide, account,
and sequence.
- Certainty gate — when a max-effort or worker-fleet controller runs this
skill, require two distinct evidence checks before marking a package
approved or published. A worker conclusion is not the second check.
When a blocking gate fails, stop the affected action and return:
HALT — <one-line blocker>
Options:
1. <bounded resolution>
2. <bounded resolution>
3. <bounded resolution, if useful>
Waiting on: <specific evidence or approval>
Continue only on independent draft work that does not bypass the blocker.
Rationalizations that precede a violation
Each excuse below shows up immediately before a gate gets skipped. When one
appears in your own reasoning or in the request, treat it as the signal to run
the gate, not to waive it.
| Excuse |
Reality |
| "It's only 12 seconds." |
Duration is not a rights basis. The clip still needs an owned, licensed, permission-recorded, native-repost, or accountable fair-use route. |
| "I credited the source." |
Credit is attribution, not clearance. A blocked or unreviewed source stays blocked with a credit line attached. |
| "It's public, so it's reusable." |
Public availability is not reuse permission. Classify the video before writing copy. |
| "The composer accepted it, so it published." |
A prepared composer, scheduled item, or click is not a publication. Only the public permalink readback proves it. |
| "The worker already checked it." |
Under Max Effort or Worker Fleet a worker conclusion is one check. The certainty gate needs a second, independent one. |
| "The guide is basically finished." |
An unpublished guide with no stable draft or specific promise fails the fit test. Build the bridge to something that exists. |
| "The moment is getting traction, so ship it." |
Popularity is not the score. A moment below 8/10, or below 2 on claim support or guide bridge, does not qualify. |
Workflow
1. Define the funnel contract
Capture:
- campaign goal: article reads, bookmarks, qualified replies, profile visits,
leads, or another named action;
- target platform and visible posting identity;
- video source URL or file, owner, transcript availability, and candidate
timestamps;
- guide title, URL or draft, its promise, and current publication state;
- audience and one next action;
- whether the user wants a private draft, scheduled package, or live execution.
If product-marketing context exists in .agents/product-marketing.md,
.claude/product-marketing.md, or product-marketing-context.md, read it
before asking for information already covered there.
2. Choose a lawful video route
| Rights status |
Allowed route |
original |
Cut and publish within the user's approved scope. |
licensed |
Follow the license terms and record the evidence. |
permission-recorded |
Follow the exact approved platforms, duration, credit, and edit scope. |
native-repost-only |
Use the platform's native quote, repost, stitch, duet, embed, or link path. Do not download and re-upload. Treat this as an operational sharing route, not legal clearance. |
fair-use-review |
Prepare a four-factor review for commentary, criticism, news reporting, teaching, scholarship, or research. Do not label the use fair or publish until the accountable owner records the decision. |
blocked |
Do not use the footage. Offer an original commentary clip, a permission request, or a source link instead. |
For any source that is not original, licensed, or permission-recorded, read
references/third-party-video-rights.md.
Do not infer fair use, ownership, or permission. Shortness, credit, a public
source, or added commentary alone does not settle fair use. Do not remove
watermarks, attribution, or provenance. Prefer a native repost with added
analysis or create an original camera or screen-recorded response that
summarizes the idea without copying the footage.
3. Establish the guide anchor
The long-form asset must have:
- one specific promise that the clip can honestly introduce;
- a title and stable draft or URL;
- enough depth to reward the transition from short to long;
- sources for material factual claims;
- one next action that matches the campaign goal.
If the guide does not exist, return a brief and route the full draft to
suede-copy and the portfolio decision to suede-content-strategy. Resume this
skill after the guide has a reviewable draft. Do not fabricate a live URL.
4. Score candidate moments
Score each candidate from 0 to 2 on five dimensions:
| Dimension |
0 |
1 |
2 |
| Opening clarity |
Premise is missing |
Premise arrives late |
Premise is clear in 1–3 seconds |
| Standalone value |
Needs surrounding context |
Partly self-contained |
Complete useful idea or story |
| Guide bridge |
Unrelated |
Adjacent |
Naturally creates the next question the guide answers |
| Claim support |
Unverifiable or misleading |
Needs qualification |
Directly supported and correctly framed |
| Audience fit |
No named audience fit |
Broad fit |
Solves a named audience problem |
Select a moment only when it scores at least 8/10, claim support is 2, guide
bridge is 2, and the rights gate passes. If none qualify, return the scorecard
and request a better source instead of forcing a clip.
5. Build the package
Read references/package-template.md and
produce:
- Decision snapshot — goal, audience, platform, identity, and chosen
sequence.
- Source and rights record — owner, source, evidence, transcript excerpt,
permitted route, jurisdiction, and any four-factor review.
- Guide anchor — exact title, promise, URL or draft state, and the question
it answers after the clip.
- Clip brief — in/out timestamps, target duration, exact opening, subtitle
text, on-screen credit, ending bridge, and export owner.
- Funnel post — exact text with four jobs:
- hook the video moment;
- explain why it matters;
- bridge to the deeper guide;
- give one specific next action.
- Publish sequence — one of the verified patterns below.
- Measurement plan — baseline, observation window, and decision rule.
- Certainty record — execution mode, two check owners or processes,
direct evidence, contradictions, and final verdict.
- Approval bundle — exact media, post copy, guide, identity, and sequence.
Do not pad the post with generic setup, unsupported performance language, or
multiple competing calls to action.
6. Choose a verified sequence
Use one:
- Anchor-first — publish or verify the guide, then publish the clip-led post
that references it.
- Clip-first — publish the clip, then place the guide in the platform's
verified companion location, such as a first reply or supported link field.
- Native-repost — quote or repost the third-party source with original
analysis and a guide bridge; do not re-upload the source media.
Do not assume a quote-post can also carry new media. Verify the current composer
and choose the smallest sequence that preserves the clip, guide, and source
credit.
7. Run the dual certainty gate when required
Record execution_mode as standard, max-effort, or worker-fleet. Standard
mode may record certainty_status: not-required. Max Effort and Worker Fleet
must run both checks and may not mark a package approved or published until
certainty_status: proved. Record one package version, timestamp, or content
hash so both checks evaluate the same unchanged artifact.
Check 1 — production proof
- Reopen the video or transcript at the selected timestamps.
- Match the quotation, claim framing, rights evidence, moment score, guide
promise, bridge, exact copy, identity, sequence, and one CTA to the package.
- Run the package validator for a saved artifact.
- In Fleet mode, the fleet worker's acceptance-criteria self-check may satisfy
this check, but remains provisional.
Check 2 — independent proof
- Inspect the source evidence and assembled package directly; do not review
only Check 1's summary.
- Use a different failure lens, evidence source, or acceptance criterion and
try to disprove the rights route, factual framing, guide fit, platform
sequence, and approval readiness.
- In Max Effort with useful parallel work, keep the producer and adversarial
reviewer separate. For one atomic Max Effort job, perform a fresh second pass
after reloading the source evidence.
- In Fleet mode, the controller must perform this check and mark the worker
output
accepted, rejected, or fix brief. A second worker or repeated
self-check does not replace controller review.
Use only:
PROVED — both checks pass with direct evidence and every contradiction is
resolved;
UNPROVED — a check is incomplete, indirect, or disagrees with the other;
BLOCKED — access, authority, rights, or platform state prevents a required
check.
If either check is not PROVED, keep publication unapproved, use the halt
format, and name the smallest fix or evidence needed. The dual check raises
confidence; it does not guarantee truth, create legal clearance, or replace
the live readback. A material change to the media, timestamps, rights evidence,
guide, copy, identity, sequence, or CTA resets certainty_status to pending
and requires both checks again.
8. Require exact-content approval
Before a live action, show:
Account:
Platform:
Media:
Source/rights status:
Guide title and URL:
Exact post text:
Publish sequence:
Approval is valid only for that bundle. If the media, copy, guide URL, account,
or sequence changes materially, show the changed bundle and obtain approval
again. Verify the visible identity immediately before acting and fail closed on
an account mismatch, login challenge, or ambiguous composer.
9. Verify completion
For a saved package, run:
python3 /path/to/suede-clip-to-guide/scripts/validate_package.py path/to/clip-to-guide-package.md
For a live run, also read back:
- the final public permalink;
- visible posting identity;
- rendered post text and media or native source reference;
- guide URL and publication state;
- timestamp and any platform warning.
Do not claim publication from a click alone. A complete live run needs the
public readback. A draft-only run is complete when the package validator passes
and the approval state is reported as draft.
Measurement
Choose the smallest comparable window the account can support. Record:
- clip retention or completion where exposed;
- guide opens or link clicks where exposed;
- bookmarks, saves, qualified replies, and profile visits;
- the exact campaign action;
- a comparable recent baseline.
When the platform exposes compatible denominators, calculate:
guide transition rate = verified guide opens / clip-post impressions
qualified action rate = named qualified actions / verified guide opens
If compatible denominators are unavailable, report the available counts
separately. Do not combine mismatched platform windows or call clicks article
reads.
Change one variable per next test: moment, opening, bridge, sequence, or CTA.
Do not report causal lift from an unpaired or tiny sample.
Boundaries
- Do not download, clip, or re-upload third-party footage without a recorded
rights basis or an accountable fair-use decision.
- Do not give legal clearance or label uncertain reuse as fair use.
- Do not invent transcripts, timestamps, permissions, URLs, performance,
audience demand, or platform capabilities.
- Do not publish or schedule without exact-content approval and visible-identity
verification.
- Do not alter a source quote to make the hook stronger.
- Do not describe the campaign as successful until current analytics support
the named decision rule.
- Do not call a Max Effort or Fleet package certain, approved, or publishable
when either required check is
UNPROVED or BLOCKED.
Routing
- Need full video editing, generation, captions, color, or exports -> use
suede-video, then return here for the funnel package.
- Need a general platform plan, calendar, listening, or engagement program ->
use
suede-social.
- Need the long-form guide written -> use
suede-copy; use
suede-content-strategy for pillars and portfolio priority.
- Need paid variants -> use
suede-ad-creative.
- Need maximum-effort orchestration or a high-volume worker-fleet batch ->
private Suede Labs companions, not in this pack: suede-full-send and
suede-codex-fleet. In either mode, return here for the dual certainty record.
- From those skills, route a video-to-long-form bridge, moment score, rights
route, exact approval bundle, and readback back to
suede-clip-to-guide.
1---2name: suede-clip-to-guide3description: Suede-owned short-to-long content funnel blueprint. Use when turning a video, clip, interview moment, talk excerpt, screen recording, or transcript into a repeatable package that bridges attention to an X Article, LinkedIn article, newsletter, blog guide, or playbook, or when third-party footage needs a rights route before reuse. NOT FOR: full video editing or production (use suede-video), general social calendars or listening (use suede-social), creating the long-form asset from scratch (use suede-copy and suede-content-strategy), paid ads (use suede-ad-creative), or publishing or reposting without exact-content and visible-identity approval.4---56# Suede Clip to Guide78Build one evidence-backed path from a video moment to a deeper written asset.9Treat the clip as the attention layer and the guide as the authority layer. Do10not assume the pattern performs; test the bridge against the account baseline.1112## Default Success Blueprint1314Use this as the recommended pattern when the rights, source, claim, platform,15and approval gates pass:1617```text18Useful guide with one promise19 ↓20Self-contained video moment21 ↓22Rights route + 8/10 moment score23 ↓24Clip hook + source credit + subtitles25 ↓26Post explains why the moment matters27 ↓28One explicit bridge to the guide29 ↓30Max Effort/Fleet: dual certainty gate31 ↓32Exact-content approval33 ↓34Public readback + clip-to-guide measurement35 ↓36Keep, revise, or stop from the observed result37```3839Prefer this blueprint when:4041- a guide already answers the natural next question created by the clip;42- the goal is deeper understanding, bookmarks, qualified replies, leads, or43 authority rather than raw views alone;44- the selected moment passes the 8/10 score and claim-support threshold;45- the rights route and current platform sequence are recorded;46- the account can observe at least one clip metric and one guide-transition or47 campaign metric.4849Do not use it when:5051- the guide is thin, unrelated, unpublished without a stable draft, or has no52 specific promise;53- the clip needs missing context, distorts the source, or exists only because54 it is popular;55- third-party reuse is blocked or the accountable fair-use decision is absent;56- the platform cannot preserve the source, clip, and guide bridge in a verified57 sequence;58- the idea is complete in the short post and the guide would add no depth.5960For a first test, build three distinct packages only when three moments pass all61gates. Compare them with the account's recent comparable posts. Keep the pattern62only if the named guide-transition or campaign metric meets the decision rule;63revise one variable at a time when it does not.6465## Non-Negotiable Gates6667Apply these throughout the run. Resolve rights, source, and claims before68writing copy; resolve platform, certainty, and approval before a live action:69701. **Rights gate** — classify the video as owned, licensed, permission-recorded,71 native-repost-only, fair-use-review, or blocked. Public availability is not72 reuse permission.732. **Source gate** — obtain the video, transcript or exact timestamps, guide74 draft or URL, target platform, intended account, and desired next action.753. **Claim gate** — trace factual claims and quotations to the source. Label76 interpretations as interpretations.774. **Platform gate** — inspect current official requirements and the live78 composer before promising that media, quote-posts, article cards, links, or79 replies can be combined.805. **Approval gate** — do not publish, schedule, repost, upload, reply, or edit81 a live article until the user approves the exact media, copy, guide, account,82 and sequence.836. **Certainty gate** — when a max-effort or worker-fleet controller runs this84 skill, require two distinct evidence checks before marking a package85 approved or published. A worker conclusion is not the second check.8687When a blocking gate fails, stop the affected action and return:8889```text90HALT — <one-line blocker>91Options:921. <bounded resolution>932. <bounded resolution>943. <bounded resolution, if useful>95Waiting on: <specific evidence or approval>96```9798Continue only on independent draft work that does not bypass the blocker.99100### Rationalizations that precede a violation101102Each excuse below shows up immediately before a gate gets skipped. When one103appears in your own reasoning or in the request, treat it as the signal to run104the gate, not to waive it.105106| Excuse | Reality |107|---|---|108| "It's only 12 seconds." | Duration is not a rights basis. The clip still needs an owned, licensed, permission-recorded, native-repost, or accountable fair-use route. |109| "I credited the source." | Credit is attribution, not clearance. A blocked or unreviewed source stays blocked with a credit line attached. |110| "It's public, so it's reusable." | Public availability is not reuse permission. Classify the video before writing copy. |111| "The composer accepted it, so it published." | A prepared composer, scheduled item, or click is not a publication. Only the public permalink readback proves it. |112| "The worker already checked it." | Under Max Effort or Worker Fleet a worker conclusion is one check. The certainty gate needs a second, independent one. |113| "The guide is basically finished." | An unpublished guide with no stable draft or specific promise fails the fit test. Build the bridge to something that exists. |114| "The moment is getting traction, so ship it." | Popularity is not the score. A moment below 8/10, or below 2 on claim support or guide bridge, does not qualify. |115116## Workflow117118### 1. Define the funnel contract119120Capture:121122- campaign goal: article reads, bookmarks, qualified replies, profile visits,123 leads, or another named action;124- target platform and visible posting identity;125- video source URL or file, owner, transcript availability, and candidate126 timestamps;127- guide title, URL or draft, its promise, and current publication state;128- audience and one next action;129- whether the user wants a private draft, scheduled package, or live execution.130131If product-marketing context exists in `.agents/product-marketing.md`,132`.claude/product-marketing.md`, or `product-marketing-context.md`, read it133before asking for information already covered there.134135### 2. Choose a lawful video route136137| Rights status | Allowed route |138|---|---|139| `original` | Cut and publish within the user's approved scope. |140| `licensed` | Follow the license terms and record the evidence. |141| `permission-recorded` | Follow the exact approved platforms, duration, credit, and edit scope. |142| `native-repost-only` | Use the platform's native quote, repost, stitch, duet, embed, or link path. Do not download and re-upload. Treat this as an operational sharing route, not legal clearance. |143| `fair-use-review` | Prepare a four-factor review for commentary, criticism, news reporting, teaching, scholarship, or research. Do not label the use fair or publish until the accountable owner records the decision. |144| `blocked` | Do not use the footage. Offer an original commentary clip, a permission request, or a source link instead. |145146For any source that is not original, licensed, or permission-recorded, read147[references/third-party-video-rights.md](references/third-party-video-rights.md).148Do not infer fair use, ownership, or permission. Shortness, credit, a public149source, or added commentary alone does not settle fair use. Do not remove150watermarks, attribution, or provenance. Prefer a native repost with added151analysis or create an original camera or screen-recorded response that152summarizes the idea without copying the footage.153154### 3. Establish the guide anchor155156The long-form asset must have:157158- one specific promise that the clip can honestly introduce;159- a title and stable draft or URL;160- enough depth to reward the transition from short to long;161- sources for material factual claims;162- one next action that matches the campaign goal.163164If the guide does not exist, return a brief and route the full draft to165`suede-copy` and the portfolio decision to `suede-content-strategy`. Resume this166skill after the guide has a reviewable draft. Do not fabricate a live URL.167168### 4. Score candidate moments169170Score each candidate from 0 to 2 on five dimensions:171172| Dimension | 0 | 1 | 2 |173|---|---|---|---|174| Opening clarity | Premise is missing | Premise arrives late | Premise is clear in 1–3 seconds |175| Standalone value | Needs surrounding context | Partly self-contained | Complete useful idea or story |176| Guide bridge | Unrelated | Adjacent | Naturally creates the next question the guide answers |177| Claim support | Unverifiable or misleading | Needs qualification | Directly supported and correctly framed |178| Audience fit | No named audience fit | Broad fit | Solves a named audience problem |179180Select a moment only when it scores at least 8/10, claim support is 2, guide181bridge is 2, and the rights gate passes. If none qualify, return the scorecard182and request a better source instead of forcing a clip.183184### 5. Build the package185186Read [references/package-template.md](references/package-template.md) and187produce:1881891. **Decision snapshot** — goal, audience, platform, identity, and chosen190 sequence.1912. **Source and rights record** — owner, source, evidence, transcript excerpt,192 permitted route, jurisdiction, and any four-factor review.1933. **Guide anchor** — exact title, promise, URL or draft state, and the question194 it answers after the clip.1954. **Clip brief** — in/out timestamps, target duration, exact opening, subtitle196 text, on-screen credit, ending bridge, and export owner.1975. **Funnel post** — exact text with four jobs:198 - hook the video moment;199 - explain why it matters;200 - bridge to the deeper guide;201 - give one specific next action.2026. **Publish sequence** — one of the verified patterns below.2037. **Measurement plan** — baseline, observation window, and decision rule.2048. **Certainty record** — execution mode, two check owners or processes,205 direct evidence, contradictions, and final verdict.2069. **Approval bundle** — exact media, post copy, guide, identity, and sequence.207208Do not pad the post with generic setup, unsupported performance language, or209multiple competing calls to action.210211### 6. Choose a verified sequence212213Use one:214215- **Anchor-first** — publish or verify the guide, then publish the clip-led post216 that references it.217- **Clip-first** — publish the clip, then place the guide in the platform's218 verified companion location, such as a first reply or supported link field.219- **Native-repost** — quote or repost the third-party source with original220 analysis and a guide bridge; do not re-upload the source media.221222Do not assume a quote-post can also carry new media. Verify the current composer223and choose the smallest sequence that preserves the clip, guide, and source224credit.225226### 7. Run the dual certainty gate when required227228Record `execution_mode` as `standard`, `max-effort`, or `worker-fleet`. Standard229mode may record `certainty_status: not-required`. Max Effort and Worker Fleet230must run both checks and may not mark a package `approved` or `published` until231`certainty_status: proved`. Record one package version, timestamp, or content232hash so both checks evaluate the same unchanged artifact.233234**Check 1 — production proof**235236- Reopen the video or transcript at the selected timestamps.237- Match the quotation, claim framing, rights evidence, moment score, guide238 promise, bridge, exact copy, identity, sequence, and one CTA to the package.239- Run the package validator for a saved artifact.240- In Fleet mode, the fleet worker's acceptance-criteria self-check may satisfy241 this check, but remains provisional.242243**Check 2 — independent proof**244245- Inspect the source evidence and assembled package directly; do not review246 only Check 1's summary.247- Use a different failure lens, evidence source, or acceptance criterion and248 try to disprove the rights route, factual framing, guide fit, platform249 sequence, and approval readiness.250- In Max Effort with useful parallel work, keep the producer and adversarial251 reviewer separate. For one atomic Max Effort job, perform a fresh second pass252 after reloading the source evidence.253- In Fleet mode, the controller must perform this check and mark the worker254 output `accepted`, `rejected`, or `fix brief`. A second worker or repeated255 self-check does not replace controller review.256257Use only:258259- `PROVED` — both checks pass with direct evidence and every contradiction is260 resolved;261- `UNPROVED` — a check is incomplete, indirect, or disagrees with the other;262- `BLOCKED` — access, authority, rights, or platform state prevents a required263 check.264265If either check is not `PROVED`, keep publication unapproved, use the halt266format, and name the smallest fix or evidence needed. The dual check raises267confidence; it does not guarantee truth, create legal clearance, or replace268the live readback. A material change to the media, timestamps, rights evidence,269guide, copy, identity, sequence, or CTA resets `certainty_status` to `pending`270and requires both checks again.271272### 8. Require exact-content approval273274Before a live action, show:275276```text277Account:278Platform:279Media:280Source/rights status:281Guide title and URL:282Exact post text:283Publish sequence:284```285286Approval is valid only for that bundle. If the media, copy, guide URL, account,287or sequence changes materially, show the changed bundle and obtain approval288again. Verify the visible identity immediately before acting and fail closed on289an account mismatch, login challenge, or ambiguous composer.290291### 9. Verify completion292293For a saved package, run:294295```bash296python3 /path/to/suede-clip-to-guide/scripts/validate_package.py path/to/clip-to-guide-package.md297```298299For a live run, also read back:300301- the final public permalink;302- visible posting identity;303- rendered post text and media or native source reference;304- guide URL and publication state;305- timestamp and any platform warning.306307Do not claim publication from a click alone. A complete live run needs the308public readback. A draft-only run is complete when the package validator passes309and the approval state is reported as `draft`.310311## Measurement312313Choose the smallest comparable window the account can support. Record:314315- clip retention or completion where exposed;316- guide opens or link clicks where exposed;317- bookmarks, saves, qualified replies, and profile visits;318- the exact campaign action;319- a comparable recent baseline.320321When the platform exposes compatible denominators, calculate:322323```text324guide transition rate = verified guide opens / clip-post impressions325qualified action rate = named qualified actions / verified guide opens326```327328If compatible denominators are unavailable, report the available counts329separately. Do not combine mismatched platform windows or call clicks article330reads.331332Change one variable per next test: moment, opening, bridge, sequence, or CTA.333Do not report causal lift from an unpaired or tiny sample.334335## Boundaries336337- Do not download, clip, or re-upload third-party footage without a recorded338 rights basis or an accountable fair-use decision.339- Do not give legal clearance or label uncertain reuse as fair use.340- Do not invent transcripts, timestamps, permissions, URLs, performance,341 audience demand, or platform capabilities.342- Do not publish or schedule without exact-content approval and visible-identity343 verification.344- Do not alter a source quote to make the hook stronger.345- Do not describe the campaign as successful until current analytics support346 the named decision rule.347- Do not call a Max Effort or Fleet package certain, approved, or publishable348 when either required check is `UNPROVED` or `BLOCKED`.349350## Routing351352- Need full video editing, generation, captions, color, or exports -> use353 `suede-video`, then return here for the funnel package.354- Need a general platform plan, calendar, listening, or engagement program ->355 use `suede-social`.356- Need the long-form guide written -> use `suede-copy`; use357 `suede-content-strategy` for pillars and portfolio priority.358- Need paid variants -> use `suede-ad-creative`.359- Need maximum-effort orchestration or a high-volume worker-fleet batch ->360 private Suede Labs companions, not in this pack: suede-full-send and361 suede-codex-fleet. In either mode, return here for the dual certainty record.362- From those skills, route a video-to-long-form bridge, moment score, rights363 route, exact approval bundle, and readback back to `suede-clip-to-guide`.