Event Timeline Compiler
What This Skill Does
Compiles key events into a structured, scannable timeline — formatted as a table or numbered list — designed for use in graphic production, digital interactives, sidebar fact boxes, and editorial planning documents.
When To Use This Skill
- You need a timeline formatted for a designer or web developer to turn into a visual element
- An editor has asked for a sidebar chronology to accompany a feature or investigation
- You are building an editorial planning document and need a compact reference of key dates
- You want a quick-scan version of events (not narrative prose) to share in a pitch or briefing
What You Need To Provide
Required: The topic or event sequence to compile, and the time period to cover.
Optional: Preferred output format (table, numbered list, or both); maximum number of entries (useful if you need it to fit a fixed layout); whether to include a brief annotation on each entry or just the bare date and event; the publication context (print sidebar, web interactive, broadcast rundown, pitch document).
How the Assistant Approaches This
- Identifies the key events that define the arc of the story — trigger, escalation, turning points, and current status — prioritising entries that are independently significant over entries that are merely part of the background.
- Assigns each entry the most specific date available (day/month/year where possible; month/year where exact date is unknown; year only as a last resort) and flags any approximate dates.
- Writes each entry as a single, precise sentence — no more than 20 words — that states what happened and, if space permits, why it matters.
- Formats the output as requested: a markdown table for digital/design use, a numbered list for documents, or both if no preference is given.
Output Format
Table format: Three columns — Date | Event | Significance (one word or short phrase). Dates in the first column, left-aligned. Maximum 25 entries unless more are requested.
List format: Numbered entries, each on a single line: **Month Year** — Event description.
Both formats use plain, neutral language. No bullet-point sub-entries. No paragraph prose. Output should be copy-paste ready for a designer's brief or an editorial doc.
Quality Criteria
Example
Input
Topic: A national housing affordability crisis and subsequent government policy response.
Period: 2018–2024.
Format: Table, for a web interactive. Maximum 12 entries. Include a one-phrase significance note per entry.
Output
| Date |
Event |
Significance |
| Q1 2018 |
National median house price exceeds ten times median household income for the first time on record. |
Crisis benchmark reached |
| June 2019 |
Parliamentary housing committee publishes inquiry report; recommends 14 policy reforms including zoning liberalisation. |
Reform agenda set |
| March 2020 |
Pandemic lockdowns trigger short-term rent falls in major cities; government declares moratorium on evictions. |
Temporary relief |
| November 2020 |
Mortgage rates hit historic low of 0.9%; demand surges; prices recover and accelerate. |
Crisis deepens |
| August 2021 |
National homelessness register shows 22% year-on-year increase; advocacy groups call for emergency housing fund. |
Social cost visible |
| February 2022 |
Central bank signals imminent rate rises; property industry warns of market correction. |
Turning point signals |
| June 2022 |
Interest rates begin rising; first-home buyer mortgage approvals fall 34% over six months. |
Demand squeeze begins |
| January 2023 |
Government announces National Housing Compact: target of 1.2 million new homes by 2029. |
Policy response launched |
| May 2023 |
Senate passes amended Housing Fund legislation after three-month impasse; $10 billion committed. |
Funding secured |
| October 2023 |
First Housing Compact progress report finds 38,000 homes completed against an annual target of 240,000. |
Implementation lag exposed |
| March 2024 |
Independent review of zoning rules finds 60% of urban land still restricted to single-dwelling development. |
Structural barrier confirmed |
| June 2024 (approx.) |
Government announces emergency planning powers to override local zoning in designated supply zones. |
Policy escalation |
Dates marked "approx." are based on available reporting and should be verified before publication.
Known Limitations
- This skill produces a structured reference tool, not a publication-ready narrative. A writer will still need to interpret the timeline for readers rather than reproducing it verbatim in a text piece.
- The assistant cannot guarantee completeness for fast-moving stories or events that occurred close to its training cutoff. Always verify the final entry against current sources.
- For topics with significant regional or language variation (policy enacted differently in different jurisdictions, events covered primarily in non-English press), the timeline may reflect English-language coverage more than the full picture.
- The 20-word entry limit is a discipline, not a hard technical constraint — if a critical event cannot be accurately summarised in 20 words, ask the assistant to expand that specific entry.
Related Skills
1---2name: event-timeline-compiler3description: Compiles key events into a structured, scannable timeline — formatted as a table or numbered list — designed for use in graphic production, digital interactives, sidebar fact boxes, and editorial planning documents.4---5# Event Timeline Compiler67## What This Skill Does8Compiles key events into a structured, scannable timeline — formatted as a table or numbered list — designed for use in graphic production, digital interactives, sidebar fact boxes, and editorial planning documents.910## When To Use This Skill11- You need a timeline formatted for a designer or web developer to turn into a visual element12- An editor has asked for a sidebar chronology to accompany a feature or investigation13- You are building an editorial planning document and need a compact reference of key dates14- You want a quick-scan version of events (not narrative prose) to share in a pitch or briefing1516## What You Need To Provide17**Required:** The topic or event sequence to compile, and the time period to cover.1819**Optional:** Preferred output format (table, numbered list, or both); maximum number of entries (useful if you need it to fit a fixed layout); whether to include a brief annotation on each entry or just the bare date and event; the publication context (print sidebar, web interactive, broadcast rundown, pitch document).2021## How the Assistant Approaches This221. Identifies the key events that define the arc of the story — trigger, escalation, turning points, and current status — prioritising entries that are independently significant over entries that are merely part of the background.232. Assigns each entry the most specific date available (day/month/year where possible; month/year where exact date is unknown; year only as a last resort) and flags any approximate dates.243. Writes each entry as a single, precise sentence — no more than 20 words — that states what happened and, if space permits, why it matters.254. Formats the output as requested: a markdown table for digital/design use, a numbered list for documents, or both if no preference is given.2627## Output Format28**Table format:** Three columns — Date | Event | Significance (one word or short phrase). Dates in the first column, left-aligned. Maximum 25 entries unless more are requested.2930**List format:** Numbered entries, each on a single line: `**Month Year** — Event description.`3132Both formats use plain, neutral language. No bullet-point sub-entries. No paragraph prose. Output should be copy-paste ready for a designer's brief or an editorial doc.3334## Quality Criteria35- [ ] Every entry has a date — day/month/year, month/year, or year, with approximate dates flagged36- [ ] Each entry is one sentence, 20 words or fewer37- [ ] The most significant events are included; minor detail entries are omitted38- [ ] No two entries say essentially the same thing in different words39- [ ] Formatting is consistent throughout — no mixed styles within the same output40- [ ] The timeline has a clear start and end point, not an open-ended trailing list4142## Example4344### Input45Topic: A national housing affordability crisis and subsequent government policy response.46Period: 2018–2024.47Format: Table, for a web interactive. Maximum 12 entries. Include a one-phrase significance note per entry.4849### Output5051| Date | Event | Significance |52|------|-------|--------------|53| Q1 2018 | National median house price exceeds ten times median household income for the first time on record. | Crisis benchmark reached |54| June 2019 | Parliamentary housing committee publishes inquiry report; recommends 14 policy reforms including zoning liberalisation. | Reform agenda set |55| March 2020 | Pandemic lockdowns trigger short-term rent falls in major cities; government declares moratorium on evictions. | Temporary relief |56| November 2020 | Mortgage rates hit historic low of 0.9%; demand surges; prices recover and accelerate. | Crisis deepens |57| August 2021 | National homelessness register shows 22% year-on-year increase; advocacy groups call for emergency housing fund. | Social cost visible |58| February 2022 | Central bank signals imminent rate rises; property industry warns of market correction. | Turning point signals |59| June 2022 | Interest rates begin rising; first-home buyer mortgage approvals fall 34% over six months. | Demand squeeze begins |60| January 2023 | Government announces National Housing Compact: target of 1.2 million new homes by 2029. | Policy response launched |61| May 2023 | Senate passes amended Housing Fund legislation after three-month impasse; $10 billion committed. | Funding secured |62| October 2023 | First Housing Compact progress report finds 38,000 homes completed against an annual target of 240,000. | Implementation lag exposed |63| March 2024 | Independent review of zoning rules finds 60% of urban land still restricted to single-dwelling development. | Structural barrier confirmed |64| June 2024 (approx.) | Government announces emergency planning powers to override local zoning in designated supply zones. | Policy escalation |6566*Dates marked "approx." are based on available reporting and should be verified before publication.*6768## Known Limitations69- This skill produces a structured reference tool, not a publication-ready narrative. A writer will still need to interpret the timeline for readers rather than reproducing it verbatim in a text piece.70- The assistant cannot guarantee completeness for fast-moving stories or events that occurred close to its training cutoff. Always verify the final entry against current sources.71- For topics with significant regional or language variation (policy enacted differently in different jurisdictions, events covered primarily in non-English press), the timeline may reflect English-language coverage more than the full picture.72- The 20-word entry limit is a discipline, not a hard technical constraint — if a critical event cannot be accurately summarised in 20 words, ask the assistant to expand that specific entry.7374## Related Skills75- [event-chronology-builder](../event-chronology-builder/SKILL.md)76- [investigation-timeline-builder](../../../magazine-journalism/investigation/investigation-timeline-builder/SKILL.md)