Scoring Summary
Scoring Summary
| Category | Notes |
|---|---|
| Trajectory accuracy | Distance from planned path to each target |
| Drilling efficiency | ROP achieved, time to TD |
| Dysfunction avoidance | Stick-slip, washout, lost circulation events |
| Well control | Kick detection speed, shut-in execution, false-alarm rate |
| HMI quality | Alarm management, automation levels design |
| Phase I report | Technical rigor of design document |
| Edge-AI bonus | +15 pts — optional offline small-model AI project |