File contents 🗺️ Roadmap Planner
Implementation roadmap ve proje planlama rehberi.
📋 Roadmap Template
# [Proje Adı] Roadmap
## Vision
[Uzun vadeli hedef]
## Milestones
### Phase 1: Foundation (Q1)
- [ ] Milestone 1.1
- [ ] Milestone 1.2
### Phase 2: Core Features (Q2)
- [ ] Milestone 2.1
- [ ] Milestone 2.2
### Phase 3: Polish & Launch (Q3)
- [ ] Milestone 3.1
- [ ] Milestone 3.2
⏱️ Timeline Oluşturma
Gantt Chart Formatı
Task | W1 | W2 | W3 | W4 | W5 | W6 |
------------------|----|----|----|----|----|----|
Research | ██ | ██ | | | | |
Design | | ██ | ██ | | | |
Development | | | ██ | ██ | ██ | |
Testing | | | | | ██ | ██ |
Launch | | | | | | ██ |
Estimation Guideline
Complexity
Duration
Buffer
Simple
1-2 gün
+20%
Medium
3-5 gün
+30%
Complex
1-2 hafta
+40%
Unknown
2+ hafta
+50%
⚠️ Risk Yönetimi
Risk Matrix
IMPACT
Low Med High
Low 🟢 🟢 🟡
L
I Med 🟢 🟡 🔴
K
E High 🟡 🔴 🔴
L
I
H
O
O
D
Risk Register Template
ID
Risk
Likelihood
Impact
Mitigation
Owner
R1
API rate limits
Med
High
Caching, retry
Dev
R2
Scope creep
High
Med
Strict PR
PM
👥 Kaynak Planlaması
Team Allocation
Role
Phase 1
Phase 2
Phase 3
Frontend
1
2
1
Backend
2
2
1
QA
0
1
2
DevOps
0.5
0.5
1
Capacity Planning
Haftalık saat = Kişi sayısı × 40 × Verimlilik(0.7)
Örnek: 3 dev × 40 × 0.7 = 84 saat/hafta
📊 Progress Tracking
Status Indicators
🟢 On track
🟡 At risk
🔴 Blocked
✅ Completed
Weekly Status Template
## Week [N] Status
### Completed
- [x] Task A
- [x] Task B
### In Progress
- [ ] Task C (60%)
- [ ] Task D (30%)
### Blocked
- Task E - Waiting for API access
### Next Week
- Task F
- Task G
Roadmap Planner v1.1 - Enhanced
🔄 Workflow
Kaynak: Product Roadmap Guide (Atlassian) & Outcome-Based Roadmaps
Aşama 1: Strategic Alignment (Outcome Oriented)
Aşama 2: Execution Planning (Output Oriented)
Aşama 3: Review & Adapt
Kontrol Noktaları
Aşama
Doğrulama
1
Hedefler SMART (Specific, Measurable, Achievable, Relevant, Time-bound) mı?
2
Kritik yol (Critical Path) üzerinde darboğaz var mı?
3
Ekip kapasitesi gerçekçi hesaplandı mı? (Tatiller, toplantılar düştü mü?).
1 --- 2 name: roadmap-planner 3 description: 🗺️ Roadmap Planner 4 --- 5 6 # 🗺️ Roadmap Planner 7 8 > Implementation roadmap ve proje planlama rehberi. 9 10 --- 11 12 ## 📋 Roadmap Template 13 14 ```markdown 15 # [Proje Adı] Roadmap 16 17 ## Vision 18 [Uzun vadeli hedef] 19 20 ## Milestones 21 22 ### Phase 1: Foundation (Q1) 23 - [ ] Milestone 1.1 24 - [ ] Milestone 1.2 25 26 ### Phase 2: Core Features (Q2) 27 - [ ] Milestone 2.1 28 - [ ] Milestone 2.2 29 30 ### Phase 3: Polish & Launch (Q3) 31 - [ ] Milestone 3.1 32 - [ ] Milestone 3.2 33 ``` 34 35 --- 36 37 ## ⏱️ Timeline Oluşturma 38 39 ### Gantt Chart Formatı 40 ``` 41 Task | W1 | W2 | W3 | W4 | W5 | W6 | 42 ------------------|----|----|----|----|----|----| 43 Research | ██ | ██ | | | | | 44 Design | | ██ | ██ | | | | 45 Development | | | ██ | ██ | ██ | | 46 Testing | | | | | ██ | ██ | 47 Launch | | | | | | ██ | 48 ``` 49 50 ### Estimation Guideline 51 | Complexity | Duration | Buffer | 52 |------------|----------|--------| 53 | Simple | 1-2 gün | +20% | 54 | Medium | 3-5 gün | +30% | 55 | Complex | 1-2 hafta | +40% | 56 | Unknown | 2+ hafta | +50% | 57 58 --- 59 60 ## ⚠️ Risk Yönetimi 61 62 ### Risk Matrix 63 ``` 64 IMPACT 65 Low Med High 66 Low 🟢 🟢 🟡 67 L 68 I Med 🟢 🟡 🔴 69 K 70 E High 🟡 🔴 🔴 71 L 72 I 73 H 74 O 75 O 76 D 77 ``` 78 79 ### Risk Register Template 80 | ID | Risk | Likelihood | Impact | Mitigation | Owner | 81 |----|------|------------|--------|------------|-------| 82 | R1 | API rate limits | Med | High | Caching, retry | Dev | 83 | R2 | Scope creep | High | Med | Strict PR | PM | 84 85 --- 86 87 ## 👥 Kaynak Planlaması 88 89 ### Team Allocation 90 | Role | Phase 1 | Phase 2 | Phase 3 | 91 |------|---------|---------|---------| 92 | Frontend | 1 | 2 | 1 | 93 | Backend | 2 | 2 | 1 | 94 | QA | 0 | 1 | 2 | 95 | DevOps | 0.5 | 0.5 | 1 | 96 97 ### Capacity Planning 98 ``` 99 Haftalık saat = Kişi sayısı × 40 × Verimlilik(0.7) 100 Örnek: 3 dev × 40 × 0.7 = 84 saat/hafta 101 ``` 102 103 --- 104 105 ## 📊 Progress Tracking 106 107 ### Status Indicators 108 - 🟢 On track 109 - 🟡 At risk 110 - 🔴 Blocked 111 - ✅ Completed 112 113 ### Weekly Status Template 114 ```markdown 115 ## Week [N] Status 116 117 ### Completed 118 - [x] Task A 119 - [x] Task B 120 121 ### In Progress 122 - [ ] Task C (60%) 123 - [ ] Task D (30%) 124 125 ### Blocked 126 - Task E - Waiting for API access 127 128 ### Next Week 129 - Task F 130 - Task G 131 ``` 132 133 --- 134 135 *Roadmap Planner v1.1 - Enhanced* 136 137 ## 🔄 Workflow 138 139 > **Kaynak:** [Product Roadmap Guide (Atlassian)](https://www.atlassian.com/agile/product-management/product-roadmaps) & [Outcome-Based Roadmaps](https://www.prodpad.com/blog/outcome-based-roadmaps/) 140 141 ### Aşama 1: Strategic Alignment (Outcome Oriented) 142 - [ ] **Goal Definition**: "Özellik" (Feature) yerine "Çıktı" (Outcome) odaklı hedefler belirle (Örn: "Login sayfası yap" ❌ → "Kayıt olma süresini %20 düşür" ✅). 143 - [ ] **Now-Next-Later**: Tarih bazlı (Ocak, Şubat) yerine zaman dilimi bazlı (Şimdi, Sonra, İlerde) planlama yap. 144 - [ ] **Stakeholder Mapping**: Kimin ne beklediğini belirle ve öncelikleri şeffaf bir şekilde paylaş. 145 146 ### Aşama 2: Execution Planning (Output Oriented) 147 - [ ] **Vertical Slicing**: Büyük özellikleri (Epics) bağımsız deploy edilebilir küçük parçalara böl (MVP mantığı). 148 - [ ] **Dependency Graph**: Hangi işin hangisine bağlı olduğunu görselleştir (Critical Path Analysis). 149 - [ ] **Buffer Management**: Her faz için %20-30 oranında "bilinmeyen" (unknown) zamanı ekle. 150 151 ### Aşama 3: Review & Adapt 152 - [ ] **Bi-Weekly Review**: Yol haritasını 2 haftada bir gözden geçir ve statik kalmadığından emin ol. 153 - [ ] **Risk Re-assessment**: Her milestone bitiminde riskleri tekrar puanla (Likelihood x Impact). 154 - [ ] **Communication**: Değişiklikleri proaktif olarak duyur (Neden gecikildi? Plan ne?). 155 156 ### Kontrol Noktaları 157 | Aşama | Doğrulama | 158 |-------|-----------| 159 | 1 | Hedefler SMART (Specific, Measurable, Achievable, Relevant, Time-bound) mı? | 160 | 2 | Kritik yol (Critical Path) üzerinde darboğaz var mı? | 161 | 3 | Ekip kapasitesi gerçekçi hesaplandı mı? (Tatiller, toplantılar düştü mü?). |
vuralserhat86/antigravity-agentic-skills/tree/main/skills/roadmap_planner commit 6edcfd0b4b
Frequently asked questions How do I install the Roadmap Planner skill? Run npx skillmds@latest add vuralserhat86/roadmap-planner in your terminal (requires Node.js), paste this page's agent-chat prompt into Claude, Cursor, or any MCP-connected agent, or download the SKILL.md file and copy it into your agent's skills directory.
What does the Roadmap Planner skill do? 🗺️ Roadmap Planner It is listed under Product & Planning on SkillMD.
Is Roadmap Planner safe to use? This skill has not completed SkillMD's automated safety review yet. SkillMD never runs a skill's scripts for you; review the SKILL.md before installing.
Which AI agents work with Roadmap Planner? This skill is tagged as working with Claude Code, Claude.ai, OpenAI Codex. SKILL.md is an open format, so most agents that read a skills directory can load it too.
Is Roadmap Planner free to use? Yes. Installing skills from SkillMD is free, and the skill stays under its author's original license.
Who published Roadmap Planner? vuralserhat86 (@vuralserhat86) published this skill. Their other Agent Skills are listed on their SkillMD profile.