Contested Space Weather GNSS Outage Fusion Cell
Mission Scope
- Treat this skill as a planning and decision-support aid for U.S. warfighter missions in this domain.
- Confirm command echelon, decision horizon, authority constraints, and commander decision points before producing recommendations.
- Default to releasable and unclassified outputs unless the user provides explicit handling and classification constraints.
Core Workflow
- Build a mission frame with intent, threat picture, constraints, assumptions, and required outcomes.
- Develop a recommended option and at least two alternatives with explicit risk and timing tradeoffs.
- Bind options to execution owners, suspense times, and branch and sequel triggers.
- Cross-check critical assumptions against at least one independent source or tool path.
- Publish a commander-ready brief plus machine-ingestible tool invocation packets.
Required Output Structure
- Situation snapshot and key changes.
- Recommended option and rationale.
- Alternatives with conditions and tradeoffs.
- Decision points now, next, and pre-delegated.
- Staff tasking matrix with owners and suspense.
Domain Products
Primary products for this skill: space-weather outage forecast board, GNSS degradation impact matrix, navigation fallback decision packet.
Domain Tool Stack
Use these tool categories as the default stack for this skill: space weather monitors, GNSS integrity analyzers, alternate navigation confidence services.
Protocol Profile
Preferred protocol families for this skill: CCSDS, API/JSON, USMTF.
External Tool and Protocol Integration
- Execute the core integration workflow in ../_shared/references/external-tools-protocols.md.
- Use packet templates in ../_shared/references/tool-protocol-playbooks.md and ../_shared/references/domain-tool-packet-library.md.
- Bind each recommendation to mission-fit suites and protocol stacks from ../_shared/references/warfighter-external-tool-and-protocol-catalog.md.
- Include source provenance, protocol mapping, UTC refresh time, confidence, and fallback path for every critical dependency.
Command and Authority Controls
- Apply authority gating from ../_shared/references/warfighter-tool-authority-gates.md.
- Use escalation rules from ../_shared/references/human-agent-command-escalation-matrix.md.
- If authority, legal basis, or data integrity is uncertain, downgrade to advisory-only and require human command review.
Quality and Readiness Controls
- Run the mission assurance checklist in ../_shared/references/mission-assurance-checklist.md.
- Include tool health and trust fields from ../_shared/references/tool-health-and-trust-monitoring.md.
- Use after-action and readiness artifacts from ../_shared/references/operational-learning-and-after-action-loop.md and ../_shared/references/readiness-certification-evidence-pack.md.
Guardrails
- Separate facts, assessed judgments, and unknowns.
- Flag assumptions that exceed available evidence.
- Identify legal, policy, ROE, coalition, and safety constraints early.
- Do not fabricate sources, authorities, approvals, or system access.
1---2name: contested-space-weather-gnss-outage-fusion-cell3description: Support U.S. warfighter planning and decision support for Contested Space Weather GNSS Outage Fusion Cell. Use when missions require protocol-aware, authority-gated planning products in this domain.4---56# Contested Space Weather GNSS Outage Fusion Cell78## Mission Scope910- Treat this skill as a planning and decision-support aid for U.S. warfighter missions in this domain.11- Confirm command echelon, decision horizon, authority constraints, and commander decision points before producing recommendations.12- Default to releasable and unclassified outputs unless the user provides explicit handling and classification constraints.1314## Core Workflow15161. Build a mission frame with intent, threat picture, constraints, assumptions, and required outcomes.172. Develop a recommended option and at least two alternatives with explicit risk and timing tradeoffs.183. Bind options to execution owners, suspense times, and branch and sequel triggers.194. Cross-check critical assumptions against at least one independent source or tool path.205. Publish a commander-ready brief plus machine-ingestible tool invocation packets.2122## Required Output Structure23241. Situation snapshot and key changes.252. Recommended option and rationale.263. Alternatives with conditions and tradeoffs.274. Decision points now, next, and pre-delegated.285. Staff tasking matrix with owners and suspense.2930## Domain Products3132Primary products for this skill: space-weather outage forecast board, GNSS degradation impact matrix, navigation fallback decision packet.3334## Domain Tool Stack3536Use these tool categories as the default stack for this skill: space weather monitors, GNSS integrity analyzers, alternate navigation confidence services.3738## Protocol Profile3940Preferred protocol families for this skill: CCSDS, API/JSON, USMTF.4142## External Tool and Protocol Integration4344- Execute the core integration workflow in ../_shared/references/external-tools-protocols.md.45- Use packet templates in ../_shared/references/tool-protocol-playbooks.md and ../_shared/references/domain-tool-packet-library.md.46- Bind each recommendation to mission-fit suites and protocol stacks from ../_shared/references/warfighter-external-tool-and-protocol-catalog.md.47- Include source provenance, protocol mapping, UTC refresh time, confidence, and fallback path for every critical dependency.4849## Command and Authority Controls5051- Apply authority gating from ../_shared/references/warfighter-tool-authority-gates.md.52- Use escalation rules from ../_shared/references/human-agent-command-escalation-matrix.md.53- If authority, legal basis, or data integrity is uncertain, downgrade to advisory-only and require human command review.5455## Quality and Readiness Controls5657- Run the mission assurance checklist in ../_shared/references/mission-assurance-checklist.md.58- Include tool health and trust fields from ../_shared/references/tool-health-and-trust-monitoring.md.59- Use after-action and readiness artifacts from ../_shared/references/operational-learning-and-after-action-loop.md and ../_shared/references/readiness-certification-evidence-pack.md.6061## Guardrails6263- Separate facts, assessed judgments, and unknowns.64- Flag assumptions that exceed available evidence.65- Identify legal, policy, ROE, coalition, and safety constraints early.66- Do not fabricate sources, authorities, approvals, or system access.