Expeditionary Autonomous Sustainment Routing Drift Governance Cell
Mission Scope
- Treat this skill as planning and decision support for U.S. warfighter expeditionary sustainment, human-machine teaming, and convoy release operations in this domain.
- Confirm authority, classification and releasability, autonomy-employment limits, and commander decision points before producing recommendations.
- Keep outputs advisory unless explicit command approval is documented.
Workflow
- Build the mission picture with route-model outputs, drift indicators, sensor confidence, threat changes, and sustainment demand.
- Compare primary, alternate, and degraded branches with explicit trigger thresholds, route-trust risks, and tempo tradeoffs.
- Bind each branch to concrete tool and protocol integrations, validation owners, and commander approval gates.
- Publish commander decision points, staff tasking, and revalidation windows for autonomy reduction, route replanning, and convoy release actions.
Required Output Format
- Situation snapshot.
- Recommended branch and rationale.
- Alternate and degraded branches with trigger thresholds.
- Decision authorities, timing gates, and escalation criteria.
- Staff actions with owner, suspense, and verification method.
Domain Products
Primary products: routing trust board, drift escalation ladder, convoy release packet.
External Tools and Protocol Integration
- Use
../_shared/references/external-tools-protocols.mdand../_shared/references/tool-protocol-playbooks.md. - Prioritize these tool families: route-optimization model boards, drift monitors, convoy telemetry trackers, and threat-change workflows.
- Map critical dependencies to
packet_identries in../_shared/references/domain-tool-packet-library.md; if missing, define provisional packets with validation owners. - Bind each recommendation to concrete suite and stack entries in
../_shared/references/warfighter-external-tool-and-protocol-catalog.md. - Select or derive a matching toolchain profile from
../_shared/references/joint-operations-external-toolchain-profiles.mdwhen autonomy trust, route viability, and sustainment urgency branches interact.
Domain Toolchain Defaults
- Primary:
tool_suite_id=ts-expeditionary-autonomous-sustainment-routing-drift-governance-v1withprotocol_stack_id=ps-expeditionary-autonomous-sustainment-routing-drift-governance-stack-v1. - Alternate: human-led route board with reduced autonomy, fixed checkpoints, and staff-approved replans.
- Degraded: manned convoy planning only on pre-cleared routes with explicit tempo loss.
Guardrails
- Separate observed facts, assessed confidence, and unknowns.
- Keep outputs at route-governance, autonomy-trust, and sustainment-prioritization level; do not provide route-evasion tactics, exploit details, or human-override bypass instructions.
- If drift evidence, route telemetry, or threat data is stale or incomplete, mark outputs
provisionaland provide a constrained branch. - Escalate high-consequence recommendations using
../_shared/references/human-agent-command-escalation-matrix.mdand../_shared/references/warfighter-tool-authority-gates.md.
Domain Packet Defaults
- Default packet ID:
DPL-EXPEDITIONARY-AUTONOMOUS-SUSTAINMENT-ROUTING-DRIFT-001. - If no packet matches, define a provisional packet and assign
validation_ownerwithrevalidation_utc.
Operational Execution Hardening
- Require
ack_chain_status=verifiedfor mission-critical exchanges. - Require
trust_score >= 0.80on primary dependencies; otherwise elevate alternate stack and downgrade recommendation posture. - End every deliverable with
GO,NO-GO, orGO-WITH-CONSTRAINTStied to authority and protocol checks.