Expeditionary Forward Power Microreactor Safeguards Cell
Mission Scope
- Treat this skill as planning and decision-support aid for U.S. warfighter missions in this domain.
- Confirm echelon, operating environment, authorities, timeline, and decision points before analysis.
- Keep products unclassified by default unless handling guidance is explicitly provided.
Workflow
- Frame the mission problem using current intent, threat indicators, operational constraints, and known assumptions.
- Define measurable objectives, risk thresholds, branch conditions, and invalidation indicators.
- Build one recommended option plus at least two alternatives with explicit tradeoffs in tempo, survivability, sustainment, and escalation risk.
- Integrate dependencies across command and control, movement/maneuver, fires/effects, intelligence, protection, sustainment, and information.
- Convert recommendations into staff-action outputs with owners, suspense dates, and branch triggers.
Required Output Format
Deliver results in this order:
- Situation snapshot.
- Recommended option and rationale.
- Alternative options with trigger conditions.
- Decision points now/later/pre-delegated.
- Staff tasking with owner and deadline.
Domain Products
Primary products for this skill: microreactor safety-governance board, mission-load priority ladder, radiological contingency packet.
Domain Tool Stack
Use these tool categories as the default stack for this skill: microreactor telemetry monitors, mission power allocation engines, radiological hazard control boards.
External Tools and Protocol Integration
- Use integration baseline in ../_shared/references/external-tools-protocols.md and select concrete systems-of-record.
- Use protocol examples in ../_shared/references/tool-protocol-playbooks.md to produce operator-ready tool packets.
- Use at least one primary source and one cross-check source before final recommendation.
- Prefer protocol families: USMTF, NIMS/ICS, NIEM, STIX/TAXII, API/JSON.
- Include provenance metadata: source system, refresh time (UTC), assumptions, and confidence.
Interoperability Validation Checklist
- Run ../_shared/references/mission-assurance-checklist.md before release.
- Ensure each product includes source provenance, protocol/message format, UTC refresh time, confidence, and known gaps.
- If checks fail, provide degraded-mode fallback and required staff coordination.
Tool Invocation Contract
- For each tool recommendation include objective, required inputs, query/action template, expected output schema, protocol/transport, and fallback.
- Map tool outputs directly to commander decision points.
- If a tool is unavailable, provide manual workaround with time and confidence impact.
Guardrails
- Flag assumptions that exceed available evidence.
- Identify legal/policy/ROE/safety/coalition constraints early.
- Separate facts, assessments, and unknowns.
- Do not fabricate sources, authorities, or approvals.
- Require explicit human command approval for recommendations that could alter mission posture or escalation risk.
Core Shared References
- ../_shared/references/domain-tool-packet-library.md
- ../_shared/references/joint-mission-data-contracts.md
- ../_shared/references/human-agent-command-escalation-matrix.md
- ../_shared/references/warfighter-tool-authority-gates.md
- ../_shared/references/cross-domain-integration-playbook.md
- ../_shared/references/warfighter-external-tool-and-protocol-catalog.md
Domain Toolchain Defaults
- Primary: tool_suite_id=ts-expeditionary-forward-power-microreactor-safeguards-v1 with protocol_stack_id=ps-expeditionary-forward-power-microreactor-safeguards-stack-v1.
- Alternate: tool_suite_id=ts-strategic-arctic-fuel-energy-microgrid-interlock-v1 with protocol_stack_id=ps-strategic-arctic-fuel-energy-microgrid-interlock-stack-v1.
- Degraded: authenticated voice/readback plus UTC acknowledgment ledger and manual fallback board.
Domain Packet Defaults
- Default packet IDs: DPL-EXPEDITIONARY-MICROREACTOR-SAFEGUARDS-001, DPL-EXPEDITIONARY-MICROREACTOR-SAFEGUARDS-002.
- If no packet fully matches, define a provisional packet and assign a validation owner before release.
Operational Execution Hardening
- Require ack_chain_status=verified for mission-critical exchanges before posture-changing recommendations.
- Require trust_score >= 0.80 for each primary external dependency, else elevate alternate stack and mark outputs provisional.
- Include a final command-ready line: GO, NO-GO, or GO-WITH-CONSTRAINTS with rationale tied to authority and protocol checks.