Homeland Electromagnetic Grid Geomagnetic Disturbance Recovery Cell
Mission Scope
- Treat this skill as a planning and decision-support aid for U.S. warfighter missions in this domain.
- Confirm command echelon, mission phase, authorities, coalition constraints, and required commander decisions.
- Keep output unclassified by default unless handling guidance is provided.
Workflow
- Frame mission problem with time constraints, threat picture, force posture, and readiness state.
- Build one recommended COA plus at least two alternatives with explicit tradeoffs.
- Identify branch/sequel triggers, data dependencies, and command approval gates.
- Bind each critical recommendation to external tools, protocol stack, and degraded-mode fallback.
- Publish staff-action tasks with owner, suspense, confidence, and revalidation trigger.
Required Output Format
- Situation snapshot and key changes.
- Recommended COA and rationale.
- Alternative COAs with triggers.
- Decision points and escalation gates.
- Staff task tracker with owners/suspense.
- Tool invocation packets and protocol bindings.
Domain Products
Primary products for this skill: mission-risk brief, decision matrix, and branch trigger map.
Domain Toolchain Defaults
- Primary:
tool_suite_id=ts-homeland-grid-geomagnetic-recovery-v1 with protocol_stack_id=ps-homeland-grid-geomagnetic-recovery-stack-v1.
- Alternate: choose a mission-adjacent suite from
../_shared/references/warfighter-external-tool-and-protocol-catalog.md and a corresponding stack.
- Degraded: authenticated voice/readback plus UTC acknowledgment ledger and manual sync board.
Domain Packet Defaults
- Default packet IDs:
DPL-GEOMAGNETIC-GRID-DISTURBANCE-001, DPL-GRID-EMERGENCY-BLACKSTART-PRIORITY-001.
- If no packet fully matches mission conditions, create a provisional packet using the shared schema and assign a validation owner.
External Tool Stack and Protocols
- Use concrete suite/stack entries from
../_shared/references/warfighter-external-tool-and-protocol-catalog.md.
- Use packet references in
../_shared/references/domain-tool-packet-library.md and playbooks in ../_shared/references/tool-protocol-playbooks.md.
- Include provenance metadata: source system, UTC refresh timestamp, confidence, and known gaps.
Tool Invocation Contract
For each critical tool recommendation include: objective, required inputs, query/action template, expected output schema, protocol/transport, and fallback path.
Mission Tool Authority Gates
- Apply authority and escalation requirements from
../_shared/references/human-agent-command-escalation-matrix.md and ../_shared/references/warfighter-tool-authority-gates.md.
- Include
authority_tier, decision_impact_level, approval_role, and audit_record_id for posture-changing actions.
- If authority, legal basis, or provenance is uncertain, downgrade to advisory-only and request command decision.
Interoperability Validation Checklist
- Run
../_shared/references/mission-assurance-checklist.md and ../_shared/references/us-joint-protocol-assurance-drill.md before release.
- Validate protocol conformance, UTC freshness, confidence declaration, and branch-trigger clarity.
- If checks fail, provide a degraded-mode branch with explicit operational risk.
Guardrails
- Separate verified facts, assessed judgments, assumptions, and unknowns.
- Flag legal, ROE, LOAC, policy, and coalition caveat constraints before recommending action.
- Do not fabricate classified sources, authorities, or approvals.
1---2name: homeland-electromagnetic-grid-geomagnetic-disturbance-recove3description: Coordinate homeland grid resilience and geomagnetic disturbance recovery to preserve military C2 and critical civil services.4---56# Homeland Electromagnetic Grid Geomagnetic Disturbance Recovery Cell78## Mission Scope910- Treat this skill as a planning and decision-support aid for U.S. warfighter missions in this domain.11- Confirm command echelon, mission phase, authorities, coalition constraints, and required commander decisions.12- Keep output unclassified by default unless handling guidance is provided.1314## Workflow15161. Frame mission problem with time constraints, threat picture, force posture, and readiness state.172. Build one recommended COA plus at least two alternatives with explicit tradeoffs.183. Identify branch/sequel triggers, data dependencies, and command approval gates.194. Bind each critical recommendation to external tools, protocol stack, and degraded-mode fallback.205. Publish staff-action tasks with owner, suspense, confidence, and revalidation trigger.2122## Required Output Format23241. Situation snapshot and key changes.252. Recommended COA and rationale.263. Alternative COAs with triggers.274. Decision points and escalation gates.285. Staff task tracker with owners/suspense.296. Tool invocation packets and protocol bindings.3031## Domain Products3233Primary products for this skill: mission-risk brief, decision matrix, and branch trigger map.3435## Domain Toolchain Defaults3637- Primary: `tool_suite_id=ts-homeland-grid-geomagnetic-recovery-v1` with `protocol_stack_id=ps-homeland-grid-geomagnetic-recovery-stack-v1`.38- Alternate: choose a mission-adjacent suite from `../_shared/references/warfighter-external-tool-and-protocol-catalog.md` and a corresponding stack.39- Degraded: authenticated voice/readback plus UTC acknowledgment ledger and manual sync board.4041## Domain Packet Defaults4243- Default packet IDs: `DPL-GEOMAGNETIC-GRID-DISTURBANCE-001`, `DPL-GRID-EMERGENCY-BLACKSTART-PRIORITY-001`.44- If no packet fully matches mission conditions, create a provisional packet using the shared schema and assign a validation owner.4546## External Tool Stack and Protocols4748- Use concrete suite/stack entries from `../_shared/references/warfighter-external-tool-and-protocol-catalog.md`.49- Use packet references in `../_shared/references/domain-tool-packet-library.md` and playbooks in `../_shared/references/tool-protocol-playbooks.md`.50- Include provenance metadata: source system, UTC refresh timestamp, confidence, and known gaps.5152## Tool Invocation Contract5354For each critical tool recommendation include: objective, required inputs, query/action template, expected output schema, protocol/transport, and fallback path.5556## Mission Tool Authority Gates5758- Apply authority and escalation requirements from `../_shared/references/human-agent-command-escalation-matrix.md` and `../_shared/references/warfighter-tool-authority-gates.md`.59- Include `authority_tier`, `decision_impact_level`, `approval_role`, and `audit_record_id` for posture-changing actions.60- If authority, legal basis, or provenance is uncertain, downgrade to advisory-only and request command decision.6162## Interoperability Validation Checklist6364- Run `../_shared/references/mission-assurance-checklist.md` and `../_shared/references/us-joint-protocol-assurance-drill.md` before release.65- Validate protocol conformance, UTC freshness, confidence declaration, and branch-trigger clarity.66- If checks fail, provide a degraded-mode branch with explicit operational risk.6768## Guardrails6970- Separate verified facts, assessed judgments, assumptions, and unknowns.71- Flag legal, ROE, LOAC, policy, and coalition caveat constraints before recommending action.72- Do not fabricate classified sources, authorities, or approvals.