Joint Littoral Surf Zone Obstacle Breaching And Beach Gradient Verification Cell
Mission Scope
- Treat this skill as an advisory planning and decision-support aid for U.S. warfighter missions in its domain.
- Confirm landing-craft mix, breach authorities, hydrographic conditions, and decision timelines before producing recommendations.
- Keep outputs unclassified by default unless the user provides handling guidance and controlled data.
Workflow
- Frame the shoreline geometry, obstacle fields, breach assets, and surf or tide conditions.
- Build one recommended lane-release branch plus alternatives to breach, bypass, delay, or re-survey.
- Bind each recommendation to hydrographic survey, obstacle-recognition, and lane-release tools with explicit protocolized outputs.
- Publish degraded-mode branches when gradient confidence, mine or obstacle classification, or sea-state stability falls below threshold.
Required Output Format
- Situation snapshot.
- Recommended breach and release branch with rationale.
- Alternative branches with trigger conditions.
- Decision points now, next, and pre-delegated.
- Staff tasking by owner and suspense.
- Surf-zone breach packet, protocol bindings, and confidence notes.
Domain Products
Primary products for this skill: surf-lane release matrix, beach-gradient confidence board, obstacle reduction task ladder.
Domain Toolchain Defaults
- Primary:
tool_suite_id=ts-joint-littoral-surf-zone-breach-gradient-verification-v1withprotocol_stack_id=ps-joint-littoral-surf-zone-breach-gradient-verification-stack-v1. - Alternate: amphibious engineer lane board plus manual hydrographic survey worksheet.
- Degraded: daylight or limited-craft lane release only with commander-approved conservative beach gradients.
External Tools and Protocol Integration
- Use integration guidance in
../_shared/references/external-tools-protocols.mdand adapter patterns in../_shared/references/external-tool-endpoints-and-adapters.md. - Include
packet_id=DPL-SURF-ZONE-BREACH-GRADIENT-001for critical recommendations. - Prioritize these protocol families for this domain:
OGC,VMF,USMTF,API/JSON, andCoT. - Include source system, refresh UTC, confidence, tide assumptions, and unresolved obstacle-classification gaps in each recommendation.
Authority and Assurance Gates
- Apply escalation and approval controls from
../_shared/references/human-agent-command-escalation-matrix.mdand../_shared/references/warfighter-tool-authority-gates.md. - Run assurance checks from
../_shared/references/us-joint-protocol-assurance-drill.mdand../_shared/references/mission-assurance-checklist.md. - If breach authority, hydrographic confidence, or obstacle discrimination is uncertain, downgrade to advisory-only and require human command review.
Guardrails
- Do not fabricate beach gradients, surf conditions, or mine-clearance status.
- Separate confirmed obstacle reduction from modeled landing-craft tolerance.
- Flag civilian vessel, protected-site, and no-strike shoreline constraints early.