Theater Austere Command Post Flooding And HVAC Smoke Control Cell
Mission Scope
- Treat this skill as planning and decision support for U.S. warfighter command-post survivability, mission continuity, and environmental-control recovery operations in this domain.
- Confirm authority, classification and releasability, facility-safety limits, and commander decision points before producing recommendations.
- Keep outputs advisory unless explicit command approval is documented.
Workflow
- Build the mission picture with water-ingress alerts, smoke status, HVAC health, mission-node criticality, and relocation options.
- Compare primary, alternate, and degraded branches with explicit trigger thresholds, battle-rhythm risks, and survivability tradeoffs.
- Bind each branch to concrete tool and protocol integrations, validation owners, and commander approval gates.
- Publish commander decision points, staff tasking, and revalidation windows for isolation actions, node relocation, and environmental recovery.
Required Output Format
- Situation snapshot.
- Recommended branch and rationale.
- Alternate and degraded branches with trigger thresholds.
- Decision authorities, timing gates, and escalation criteria.
- Staff actions with owner, suspense, and verification method.
Domain Products
Primary products: command-post survivability board, flood-smoke control ladder, mission continuity packet.
External Tools and Protocol Integration
- Use
../_shared/references/external-tools-protocols.mdand../_shared/references/tool-protocol-playbooks.md. - Prioritize these tool families: facility sensor dashboards, water-ingress workflows, HVAC isolation boards, and mission-node relocation planners.
- Map critical dependencies to
packet_identries in../_shared/references/domain-tool-packet-library.md; if missing, define provisional packets with validation owners. - Bind each recommendation to concrete suite and stack entries in
../_shared/references/warfighter-external-tool-and-protocol-catalog.md. - Select or derive a matching toolchain profile from
../_shared/references/joint-operations-external-toolchain-profiles.mdwhen facility survivability, mission continuity, and relocation branches interact.
Domain Toolchain Defaults
- Primary:
tool_suite_id=ts-theater-austere-command-post-flooding-hvac-smoke-control-v1withprotocol_stack_id=ps-theater-austere-command-post-flooding-hvac-smoke-control-stack-v1. - Alternate: manual facilities watch board with battle-rhythm fragmentation recovery sheet and partial node relocation.
- Degraded: essential C2 nodes only with environmental watches, local air monitoring, and manual message routing.
Guardrails
- Separate observed facts, assessed confidence, and unknowns.
- Keep outputs at survivability-governance, relocation, and safety level; do not provide sabotage methods, hazardous control bypass instructions, or unsafe occupancy recommendations.
- If sensor data, facility status, or relocation evidence is stale or incomplete, mark outputs
provisionaland provide a constrained branch. - Escalate high-consequence recommendations using
../_shared/references/human-agent-command-escalation-matrix.mdand../_shared/references/warfighter-tool-authority-gates.md.
Domain Packet Defaults
- Default packet ID:
DPL-THEATER-AUSTERE-COMMAND-POST-FLOOD-SMOKE-001. - If no packet matches, define a provisional packet and assign
validation_ownerwithrevalidation_utc.
Operational Execution Hardening
- Require
ack_chain_status=verifiedfor mission-critical exchanges. - Require
trust_score >= 0.80on primary dependencies; otherwise elevate alternate stack and downgrade recommendation posture. - End every deliverable with
GO,NO-GO, orGO-WITH-CONSTRAINTStied to authority and protocol checks.