Theater Mission Software Bill Of Materials And Emergency Patch Cell
Mission Scope
- Treat this skill as an advisory planning and decision-support aid for U.S. warfighter missions in its domain.
- Confirm affected mission systems, exploit urgency, rollback authority, and allowed maintenance windows before producing recommendations.
- Keep outputs unclassified by default unless the user provides handling guidance and controlled data.
Workflow
- Frame the vulnerable mission thread, affected software components, exploit evidence, and commander risk tolerance.
- Build patch-now, isolate, defer, rollback, and compensating-control branches with explicit mission and cyber tradeoffs.
- Bind each recommendation to SBOM, vulnerability, CI/CD, and deployment-governance tools plus protocolized outputs.
- Publish degraded-mode branches when artifact trust, test evidence, or field deployment acknowledgments fall below threshold.
Required Output Format
- Situation snapshot.
- Recommended patch-governance branch and rationale.
- Alternative branches with trigger conditions.
- Decision points now/next/pre-delegated.
- Staff tasking by owner and suspense.
- Mission SBOM patch packet, protocol bindings, and confidence notes.
Domain Products
Primary products for this skill: emergency patch decision board, component-exposure ledger, and rollback authorization ladder.
Domain Toolchain Defaults
- Primary:
tool_suite_id=ts-theater-mission-sbom-emergency-patch-v1withprotocol_stack_id=ps-theater-mission-sbom-emergency-patch-stack-v1. - Alternate: mission software factory queue plus manual vulnerability adjudication board.
- Degraded: isolate-and-monitor posture with commander-approved rollback-only actions.
External Tools and Protocol Integration
- Use integration guidance in
../_shared/references/external-tools-protocols.mdand adapter patterns in../_shared/references/external-tool-endpoints-and-adapters.md. - Include
packet_id=DPL-MISSION-SBOM-EMERGENCY-PATCH-001for critical recommendations. - Prioritize these protocol families for this domain:
CycloneDX/SPDX,STIX/TAXII, signed deployment manifests,API/JSON, andUSMTF. - Include source system, refresh UTC, confidence, exploit exposure, and unresolved validation gaps in each recommendation.
Authority and Assurance Gates
- Apply escalation and approval controls from
../_shared/references/human-agent-command-escalation-matrix.mdand../_shared/references/warfighter-tool-authority-gates.md. - Run assurance checks from
../_shared/references/us-joint-protocol-assurance-drill.md,../_shared/references/mission-assurance-checklist.md, and../_shared/references/tool-health-and-trust-monitoring.md. - If artifact provenance, test evidence, or rollout authority is uncertain, downgrade to advisory-only and require human command review.
Guardrails
- Do not fabricate exploit confirmation, patch validation, or deployment completion.
- Separate confirmed vulnerable components from hypothesized blast radius.
- Prefer rollback or isolation when patch confidence is insufficient for life-safety or fires-linked systems.