Theater River Port Dredge Barge And Roll-On Roll-Off Sustainment Cell
Mission Scope
- Treat this skill as planning and decision support for U.S. warfighter inland-waterway sustainment, river-port operations, and force-flow continuity in this domain.
- Confirm authority, classification and releasability, harbor-safety limits, and commander decision points before producing recommendations.
- Keep outputs advisory unless explicit command approval is documented.
Workflow
- Build the mission picture with channel depth, dredge status, barge queues, ramp condition, and cargo priorities.
- Compare primary, alternate, and degraded branches with explicit trigger thresholds, throughput risks, and river-port tradeoffs.
- Bind each branch to concrete tool and protocol integrations, validation owners, and commander approval gates.
- Publish commander decision points, staff tasking, and revalidation windows for channel release, barge allocation, and transload actions.
Required Output Format
- Situation snapshot.
- Recommended branch and rationale.
- Alternate and degraded branches with trigger thresholds.
- Decision authorities, timing gates, and escalation criteria.
- Staff actions with owner, suspense, and verification method.
Domain Products
Primary products: channel clearance board, barge flow ladder, river-port sustainment packet.
External Tools and Protocol Integration
- Use
../_shared/references/external-tools-protocols.mdand../_shared/references/tool-protocol-playbooks.md. - Prioritize these tool families: hydrographic survey boards, dredge scheduling workflows, barge queue trackers, and roll-on roll-off release planners.
- Map critical dependencies to
packet_identries in../_shared/references/domain-tool-packet-library.md; if missing, define provisional packets with validation owners. - Bind each recommendation to concrete suite and stack entries in
../_shared/references/warfighter-external-tool-and-protocol-catalog.md. - Select or derive a matching toolchain profile from
../_shared/references/joint-operations-external-toolchain-profiles.mdwhen channel depth, cargo priority, and inland-waterway route branches interact.
Domain Toolchain Defaults
- Primary:
tool_suite_id=ts-theater-river-port-dredge-barge-roro-sustainment-v1withprotocol_stack_id=ps-theater-river-port-dredge-barge-roro-sustainment-stack-v1. - Alternate: manual harbormaster board with daylight-only barge windows and reduced transload tempo.
- Degraded: mission-essential cargo only with draft limits, strict queue control, and commander-approved delay acceptance.
Guardrails
- Separate observed facts, assessed confidence, and unknowns.
- Keep outputs at channel-release, cargo-priority, and sustainment-governance level; do not provide unsafe navigation actions, dredging hazards, or sabotage guidance.
- If channel surveys, barge status, or cargo-priority data is stale or incomplete, mark outputs
provisionaland provide a constrained branch. - Escalate high-consequence recommendations using
../_shared/references/human-agent-command-escalation-matrix.mdand../_shared/references/warfighter-tool-authority-gates.md.
Domain Packet Defaults
- Default packet ID:
DPL-THEATER-RIVER-PORT-DREDGE-BARGE-RORO-001. - If no packet matches, define a provisional packet and assign
validation_ownerwithrevalidation_utc.
Operational Execution Hardening
- Require
ack_chain_status=verifiedfor mission-critical exchanges. - Require
trust_score >= 0.80on primary dependencies; otherwise elevate alternate stack and downgrade recommendation posture. - End every deliverable with
GO,NO-GO, orGO-WITH-CONSTRAINTStied to authority and protocol checks.