Results for “timeline”
19 skillsX API
Post tweets and threads, read timelines, search content, and track analytics on X/Twitter using the official API with OAuth authentication.
226k
Experiment
Design lean validation experiments — hypothesis, method, success criteria, sample size, timeline, and decision rules
1 · bundle
Gtm Strategy
Create a go-to-market strategy covering marketing channels, messaging, success metrics, and launch timeline for product launches or new market entry.
22.6k
More results
Gtm Strategy
Create a go-to-market strategy covering marketing channels, messaging, success metrics, and launch timeline. Use when planning a product launch, creating a GTM plan from scratch, or defining a launch strategy for a new market.
0
Sosp Workflow
Use when planning a SOSP campaign across the annual cycle — back-scheduling from the spring abstract and paper deadlines, running the summer response and July notification, stacking the August camera-ready with artifact evaluation, and retargeting rejections across the SOSP/OSDI/EuroSys circuit.
1k
Nsdi Workflow
Use when planning an NSDI campaign across the spring and fall deadlines — sequencing abstract and paper gates, notification waits, one-shot revision windows, artifact evaluation, and the May symposium — so a networked-systems project always knows which of the two yearly gates it is really building toward.
1k
Colm Workflow
Use when planning a COLM submission campaign across the calendar — working backward from the late-March abstract and paper deadlines through the May-June rebuttal, July decisions, August camera-ready, and October conference, coordinating co-authors, compute, and reciprocal-reviewing duties, and slotting COLM into a multi-venue LM-research pipeline.
1k
Soda Workflow
Use when planning a SODA (ACM-SIAM Symposium on Discrete Algorithms) campaign end to end — backward-planning to the July AoE deadline, SODA's seat in the theory calendar between STOC and FOCS deadlines, the September rebuttal and October decision, satellite deadlines (ALENEX, SOSA), and the January conference.
1k
Popl Workflow
Use when planning a POPL campaign calendar — backward-scheduling theory and mechanization from the July deadline, riding the October notification into the conditional-acceptance revision and artifact evaluation, landing the January conference, and retargeting across the SIGPLAN/PACMPL deadline wheel if July slips.
1k
Isca Workflow
Use when planning a full ISCA campaign on a calendar — working back from the expected mid-November abstract and paper deadlines to freeze simulation evidence in time, staffing the winter two-round review wait, preparing for the February-March rebuttal and revision window, and branching to camera-ready, artifacts, and the June conference.
1k
Atc Workflow
Use when planning an ATC (ACM SIGOPS Annual Technical Conference, formerly USENIX ATC) campaign end to end — running the year backward from the early-June deadline through the two review rounds, the rebuttal, conditional-acceptance shepherding, the post-acceptance artifact evaluation, and the ACM Open Access camera-ready for the November Hong Kong conference.
1k
Iccv Workflow
Use when project-managing an ICCV campaign across the odd-year cycle, covering the autumn fork between CVPR and ICCV, the early-March registration and single submission deadline, May rebuttal week, late-June decisions, the October conference with international travel and visa lead times, and the ECCV/CVPR fallback ladder if the paper misses.
1k
Pldi Workflow
Use when planning a PLDI campaign across its annual clock — backward-planning from the November deadline through winter reviewing, the February response window, March notification, post-acceptance artifact evaluation, PACMPL production, and the June conference, with owners for each deliverable.
1k
Icse Workflow
Use when planning an ICSE research-track campaign end to end, covering the single-cycle calendar from the June abstract deadline through September response, October decisions, the November revision sprint, artifact evaluation, camera-ready, and the April conference, plus rerouting timelines after rejection.
1k
Itcs Workflow
Use to plan an ITCS campaign end to end on its single annual cycle — backward from the early-September deadline through the no-rebuttal review, the November notification, the LIPIcs camera-ready, and the January conference with its Graduating Bits session.
1k
Ecai Workflow
Use to plan an ECAI campaign end to end — run the single-round year backward from the paper deadline through the abstract/registration step, summary-reject phase, rebuttal window, notification, and the open-access camera-ready, adapting to whether the edition is a standalone ECAI (FAIA/PAIS) or the joint IJCAI-ECAI 2026.
1k
Hri Workflow
Use to plan an ACM/IEEE HRI campaign backward from the full-paper deadline through the abstract-then-paper two-step, the rebuttal, the program-committee meeting, camera-ready, and the March conference, coordinating the parallel alt.HRI, Late-Breaking Reports, video, and Student Design deadlines.
1k
Facebook Page Posts
Scrapes posts from any public Facebook Page timeline, returning structured data including post text, engagement metrics, reaction breakdowns, hashtags, external links, and media type. Supports date range filtering and cursor-based pagination.
3.7k · bundle
Grants
NIH grant research skill for clinical researchers. Grill-me intake (research idea + career stage + preliminary data + environment + submission posture + known institute targets) locks down the funding strategy before any search runs. Runs a 5-facet Consensus positioning analysis (with draft Significance/Innovation language), maps the research to the right NIH institutes and study sections via RePORTER, finds NOSIs and funded overlap, and produces an editable Word document (.docx) with budget/scope-aware mechanism recommendations, submission timelines, and a mandatory program officer recommendation. Use when the user asks about research funding or makes any grant-related request (e.g., 'grants for [topic]', 'find grants for my research idea', 'what grants match my research', 'help me find NIH funding', 'grant opportunities for my research'). NIH-only scope — non-NIH funders (PCORI, DOD CDMRP, VA, foundations) are out of scope and flagged at intake.
11 · bundle