ECSS-Q-ST-80C Compliance Matrix (space-systems/ecss/q80-compliance-matrix)
Use when a software product assurance (PA) manager has to answer
ECSS-Q-ST-80C Rev.2 (30 April 2025) clause by clause: the compliance matrix
that closes the Software Product Assurance Plan (SPAP) and that customers
ask for at the system requirements review, or an audit of one received from
a supplier. The skill turns a clause list and an evidence index into the
matrix, a coverage summary and the gap list, and stops at a human sign-off.
Domain quick reference
- Four statuses and no others: compliant, partially compliant, not
compliant, not applicable. Every status other than compliant needs a
justification; every status other than not applicable needs an evidence
reference down to the section of the document.
- A clause with no evidence is open, not compliant by default. Silence is
never compliance.
- Compliance claimed without a document reference is downgraded to
partial and raised as a gap: a claim nobody can check is not evidence.
- Not applicable has two sources. The category tailoring removes some
requirements outright, and those rows are pre-filled with that reason.
A not-applicable claim on a clause the tailoring keeps is a deviation
and needs the customer's agreement, so it is raised as a gap.
- Several evidence rows on one clause combine to the weakest status. One
audit finding outweighs a compliant claim in the plan.
- Evidence mapped to a clause that is not in the list usually means a
clause was mistyped or the list is from another revision; it is
reported, not dropped.
- Coverage is two numbers: the compliant fraction of the applicable
clauses, and the fraction with an evidence reference. A high first
number with a low second one is a matrix of promises.
Workflow
- Take the clause list: the customer's, or the full requirement list of
the standard for the software category. The matrix covers every
assurance requirement that applies to the project or the contract, one
row each, and is delivered together with the software product
assurance plan (as its last section or beside it).
- Load the evidence index (CSV or rows) and normalise the status
vocabulary; refuse anything outside the four statuses.
- Build the matrix with
build_matrix and the category, so tailored-out
rows pre-fill and contradictions surface. Every row other than not
applicable must point at the document, down to the section, where that
requirement's expected output is found; a row with no such reference is
a gap. Where the requirement is to follow a document requirements
definition, one general statement of compliance with it is enough.
- Read the coverage summary and the gap list; resolve what can be
resolved from existing documents, and list the rest as open.
- Render the matrix with the draft banner and the stop line.
- Hand it to the responsible human. Only that person records the sign-off,
and approving over open gaps has to be an explicit choice.
Obligations
| Item |
Step |
| ECSS-Q-ST-80C Rev.2 5.2.1.5a |
1 |
| ECSS-Q-ST-80C Rev.2 5.2.1.5b |
3 |
Pitfalls
- Marking a clause compliant because the plan promises it. A promise is
evidence for the plan clause, not for the activity clause.
- Pointing at a document without a section. The reviewer then re-does the
mapping, and usually finds it missing.
- Using not applicable as a softer not compliant.
- Answering against the wrong revision. Rev.2 renumbered and deleted
requirements; clauses from an older list show up as unknown or orphan
evidence here.
- Letting the matrix leave the building as a statement of compliance
before a named person has signed it.
Stop gate: human sign-off required
The agent drafts; it does not decide. Stop and hand the draft to a named
human before any of these leave the working folder:
- The compliance matrix, in any format, sent to a customer or supplier.
- Any not-applicable claim that departs from the category tailoring.
- Any statement of compliance built on the matrix.
The matrix is always produced with status DRAFT. Mark every such output as
a draft, list the open gaps for the reviewer, and end with the line: STOP:
human sign-off required before submission.
Behavior contract (gate 3)
The clause id and status normalisation, the tailored status per category
with security-driven clauses, the CSV evidence parsing with loose headers,
the row rules (no evidence, missing reference, weakest status wins,
not-applicable conflicts), orphan evidence, the coverage summary, the
Markdown and CSV rendering with the draft marker and stop line, and the
sign-off that refuses an unnamed signatory and silent approval over open
gaps are exercised by the gate 3 contract test:
scripts/test_q80_compliance_matrix.py against
scripts/q80_compliance_matrix_logic.py (stdlib unittest, offline). Run:
python3 scripts/test_q80_compliance_matrix.py
Compliance
- ECSS standards are freely downloadable (ESA); cite ECSS-Q-ST-80C Rev.2
(30 April 2025) as the source and paraphrase per standards-map.yaml.
- compliance: STANDARDS-REF, gated: false.
1---2name: q80-compliance-matrix3description: "Build a clause-by-clause compliance matrix against ECSS-Q-ST-80C Rev.2 as a draft for human sign-off: join the clause list to an evidence index of document, section, status and justification, set each clause to compliant, partially compliant, not compliant or not applicable, pre-fill clauses tailored out for the software category, raise gaps such as missing evidence, compliance claimed without a reference and not-applicable claims that contradict the tailoring, summarise coverage, and render Markdown or CSV ending at the stop line. Use when a supplier answers the Q-80 compliance matrix or a customer audits one. Trigger: q80-compliance-matrix, software-product-assurance-compliance, clause-by-clause-compliance, evidence-index, compliance-gap-list, statement-of-compliance."4license: Apache-2.05compliance: STANDARDS-REF6standards:7 - id: ecss8 reference-only: true9gated: false10domain: space-systems11pack: space-systems12compatibility: "agentskills.io SKILL.md; any SKILL.md host (Claude Code, Hermes, OpenClaw)"13clauses:14 - standard: ECSS-Q-ST-80C Rev.215 clause: 5.2.1.516 items: [a, b]17 relation: implements18metadata:19 source: https://skillmd.com/skills/ashfordeou/q80-compliance-matrix20 domain: space-systems21 subdomain: ecss22 tags: [ecss, q-st-80c, q80-compliance-matrix, software-product-assurance-compliance, clause-by-clause-compliance, evidence-index, compliance-gap-list, statement-of-compliance]23 version: 0.1.024 author: Aero Agent Skills25---2627# ECSS-Q-ST-80C Compliance Matrix (space-systems/ecss/q80-compliance-matrix)2829Use when a software product assurance (PA) manager has to answer30ECSS-Q-ST-80C Rev.2 (30 April 2025) clause by clause: the compliance matrix31that closes the Software Product Assurance Plan (SPAP) and that customers32ask for at the system requirements review, or an audit of one received from33a supplier. The skill turns a clause list and an evidence index into the34matrix, a coverage summary and the gap list, and stops at a human sign-off.3536## Domain quick reference3738- Four statuses and no others: compliant, partially compliant, not39 compliant, not applicable. Every status other than compliant needs a40 justification; every status other than not applicable needs an evidence41 reference down to the section of the document.42- A clause with no evidence is open, not compliant by default. Silence is43 never compliance.44- Compliance claimed without a document reference is downgraded to45 partial and raised as a gap: a claim nobody can check is not evidence.46- Not applicable has two sources. The category tailoring removes some47 requirements outright, and those rows are pre-filled with that reason.48 A not-applicable claim on a clause the tailoring keeps is a deviation49 and needs the customer's agreement, so it is raised as a gap.50- Several evidence rows on one clause combine to the weakest status. One51 audit finding outweighs a compliant claim in the plan.52- Evidence mapped to a clause that is not in the list usually means a53 clause was mistyped or the list is from another revision; it is54 reported, not dropped.55- Coverage is two numbers: the compliant fraction of the applicable56 clauses, and the fraction with an evidence reference. A high first57 number with a low second one is a matrix of promises.5859## Workflow60611. Take the clause list: the customer's, or the full requirement list of62 the standard for the software category. The matrix covers every63 assurance requirement that applies to the project or the contract, one64 row each, and is delivered together with the software product65 assurance plan (as its last section or beside it).662. Load the evidence index (CSV or rows) and normalise the status67 vocabulary; refuse anything outside the four statuses.683. Build the matrix with `build_matrix` and the category, so tailored-out69 rows pre-fill and contradictions surface. Every row other than not70 applicable must point at the document, down to the section, where that71 requirement's expected output is found; a row with no such reference is72 a gap. Where the requirement is to follow a document requirements73 definition, one general statement of compliance with it is enough.744. Read the coverage summary and the gap list; resolve what can be75 resolved from existing documents, and list the rest as open.765. Render the matrix with the draft banner and the stop line.776. Hand it to the responsible human. Only that person records the sign-off,78 and approving over open gaps has to be an explicit choice.7980## Obligations8182| Item | Step |83|---|---|84| ECSS-Q-ST-80C Rev.2 5.2.1.5a | 1 |85| ECSS-Q-ST-80C Rev.2 5.2.1.5b | 3 |8687## Pitfalls8889- Marking a clause compliant because the plan promises it. A promise is90 evidence for the plan clause, not for the activity clause.91- Pointing at a document without a section. The reviewer then re-does the92 mapping, and usually finds it missing.93- Using not applicable as a softer not compliant.94- Answering against the wrong revision. Rev.2 renumbered and deleted95 requirements; clauses from an older list show up as unknown or orphan96 evidence here.97- Letting the matrix leave the building as a statement of compliance98 before a named person has signed it.99100## Stop gate: human sign-off required101102The agent drafts; it does not decide. Stop and hand the draft to a named103human before any of these leave the working folder:104105- The compliance matrix, in any format, sent to a customer or supplier.106- Any not-applicable claim that departs from the category tailoring.107- Any statement of compliance built on the matrix.108109The matrix is always produced with status DRAFT. Mark every such output as110a draft, list the open gaps for the reviewer, and end with the line: STOP:111human sign-off required before submission.112113## Behavior contract (gate 3)114115The clause id and status normalisation, the tailored status per category116with security-driven clauses, the CSV evidence parsing with loose headers,117the row rules (no evidence, missing reference, weakest status wins,118not-applicable conflicts), orphan evidence, the coverage summary, the119Markdown and CSV rendering with the draft marker and stop line, and the120sign-off that refuses an unnamed signatory and silent approval over open121gaps are exercised by the gate 3 contract test:122scripts/test_q80_compliance_matrix.py against123scripts/q80_compliance_matrix_logic.py (stdlib unittest, offline). Run:124python3 scripts/test_q80_compliance_matrix.py125126## Compliance127128- ECSS standards are freely downloadable (ESA); cite ECSS-Q-ST-80C Rev.2129 (30 April 2025) as the source and paraphrase per standards-map.yaml.130- compliance: STANDARDS-REF, gated: false.