When to use
Use 6-18 months after a business case, full-potential diagnostic, or synergy case was approved, to check whether it actually delivered. Every skill in this pack that produces a projection (business-case-builder, full-potential-diagnostic, synergy-case-builder) has no accountability loop without this step — a business case with no eventual value-realization check tends to get more optimistic over time, since no one ever pays for being wrong.
What it does
Compares the original projection's driver-level numbers against actuals at the same granularity, attributes material variances to a specific cause (assumption error, execution gap, or external shock), and states plainly whether the initiative is on track but delayed, or genuinely off track — then feeds the finding back into how future cases in this organization get built.
Method
- Pull the original projection at driver level, not just the headline number — the same granularity business-case-builder, full-potential-diagnostic, or synergy-case-builder produced.
- Gather actuals at the same driver-level granularity and time periods, so the comparison is apples to apples.
- Compute variance per driver, not just the bottom line — offsetting errors can make a headline number look fine while hiding that every underlying driver missed in a different direction.
- Attribute each material variance to one cause: assumption error (the input was wrong from the start — check against any assumption-audit that exists), execution gap (the assumption was reasonable, delivery fell short), or external shock (outside anyone's reasonable forecast).
- State the verdict plainly: on track but behind schedule (needs a revised timeline, not a new decision), or genuinely off track (needs a real decision about continuing, adjusting, or stopping).
- Feed the recurring cause back into practice. If assumption error keeps showing up across past reviews, that's a signal the assumption-audit step is being skipped or done too lightly upstream — name it as a process fix.
Inputs
- The original projection (business case, full-potential diagnostic, or synergy case) at driver-level detail
- Actual results at the same granularity and time periods
- Any assumption-audit findings from the original case, if available
Output format
Driver-by-driver projected-vs-actual comparison with variance; cause attribution per material variance; an explicit on-track-but-delayed vs. off-track verdict; one process-level learning fed back into future case-building.
Example
An initiative projected at $3M NPV within 18 months is reviewed at month 12: revenue tracks 15% below plan (an overly optimistic conversion-rate assumption, an assumption error) while costs run 10% under plan (an execution win). The blended NPV still looks roughly on track, but the review flags the revenue-driver miss as the real signal worth revisiting, rather than declaring the case validated because the bottom line happens to still look fine.
Common pitfalls
- Checking only the bottom-line number, missing that offsetting driver errors can accidentally produce a healthy-looking total.
- Treating every miss as an execution failure without checking whether the original assumption was ever realistic.
- Skipping the review once a case has served its purpose of getting funding approved, breaking the accountability loop for every future case.
1---2name: value-realization3description: Closes the loop that every other financial-case skill in this pack opens — checks realized results against the original business case, full-potential diagnostic, or synergy case line by line, and attributes the gap to assumption error, execution, or external shock. Use whenever the user wants a post-implementation review, wants to check if an initiative or deal actually delivered its promised value, or has a past business case, full-potential diagnostic, or synergy case that's never been checked against what actually happened.4---56# Value Realization78## When to use9Use 6-18 months after a business case, full-potential diagnostic, or synergy case was approved, to check whether it actually delivered. Every skill in this pack that produces a projection (business-case-builder, full-potential-diagnostic, synergy-case-builder) has no accountability loop without this step — a business case with no eventual value-realization check tends to get more optimistic over time, since no one ever pays for being wrong.1011## What it does12Compares the original projection's driver-level numbers against actuals at the same granularity, attributes material variances to a specific cause (assumption error, execution gap, or external shock), and states plainly whether the initiative is on track but delayed, or genuinely off track — then feeds the finding back into how future cases in this organization get built.1314## Method151. **Pull the original projection at driver level**, not just the headline number — the same granularity business-case-builder, full-potential-diagnostic, or synergy-case-builder produced.162. **Gather actuals at the same driver-level granularity and time periods**, so the comparison is apples to apples.173. **Compute variance per driver, not just the bottom line** — offsetting errors can make a headline number look fine while hiding that every underlying driver missed in a different direction.184. **Attribute each material variance to one cause**: assumption error (the input was wrong from the start — check against any assumption-audit that exists), execution gap (the assumption was reasonable, delivery fell short), or external shock (outside anyone's reasonable forecast).195. **State the verdict plainly**: on track but behind schedule (needs a revised timeline, not a new decision), or genuinely off track (needs a real decision about continuing, adjusting, or stopping).206. **Feed the recurring cause back into practice.** If assumption error keeps showing up across past reviews, that's a signal the assumption-audit step is being skipped or done too lightly upstream — name it as a process fix.2122## Inputs23- The original projection (business case, full-potential diagnostic, or synergy case) at driver-level detail24- Actual results at the same granularity and time periods25- Any assumption-audit findings from the original case, if available2627## Output format28Driver-by-driver projected-vs-actual comparison with variance; cause attribution per material variance; an explicit on-track-but-delayed vs. off-track verdict; one process-level learning fed back into future case-building.2930## Example31An initiative projected at $3M NPV within 18 months is reviewed at month 12: revenue tracks 15% below plan (an overly optimistic conversion-rate assumption, an assumption error) while costs run 10% under plan (an execution win). The blended NPV still looks roughly on track, but the review flags the revenue-driver miss as the real signal worth revisiting, rather than declaring the case validated because the bottom line happens to still look fine.3233## Common pitfalls34- Checking only the bottom-line number, missing that offsetting driver errors can accidentally produce a healthy-looking total.35- Treating every miss as an execution failure without checking whether the original assumption was ever realistic.36- Skipping the review once a case has served its purpose of getting funding approved, breaking the accountability loop for every future case.