Split work into tasks that can run side by side. Start from a spec, a plan, an issue, or the
conversation. Leave a task list an owner can start from. You are done when every outcome in the
input belongs to a task, each task delivers one result, and every pair that runs together passes
the parallelism test.
This skill plans. Whoever called it starts the tasks and owns integration.
Read the input. Read a linked spec or issue in full, with its comments. Read enough of the
code to test each pair. Use the project's glossary terms, and respect ADRs in the area. Nothing
the input puts out of scope becomes a task.
Settle shared contracts first. Find what several tasks would have to agree on, such as a
schema, an interface, or a name. Take it from the input, or make settling it the first task.
Each settled contract unlocks more parallel work. A decision only the user can make goes under
Inputs, as step 5 says.
Cut the tasks. Each task cuts a narrow, complete path through every layer, such as schema,
API, UI, and tests, not a slice of one layer. It delivers one result you can check on its own.
Split a task that delivers two. Size tasks by that result and the parallelism test, never by
context. Put prefactoring first, when it makes the rest easier. A contract or prefactoring task
delivers what it unlocks. Make a destructive or outward-facing action its own task, apart from
the work that builds it. One mechanical change that breaks many call sites at once can't be cut
this way: follow wide refactors.
Test every pair. Apply the parallelism test to each pair that could run
together. When a pair fails, add a blocking edge if one needs the other's output or decision,
note how they share a resource under Inputs, or merge them.
Write the list. Give each task these fields:
1. Title
Outcome: what works when it's done, from the user's side, not a list of layers
Proof: how to check that it works
Inputs: what it needs but won't build, including any user approval or answer, or None
Blocked by: tasks that must deliver first, or None
Finish line: land it, or stop for the user
Use the caller's finish line. Without one, land work that is settled and reversible, and stop
the rest. Settled means the user knows what they want, or checks can judge it.
Whatever the finish line, a task needs the user before it starts when its outcome is unclear,
it's destructive, outward-facing, or hard to undo, or the split around it needs their judgment.
Name the one approval or answer under Inputs on every task it affects, and return it in the
list. That approval covers the whole task. Such a task holds up only what it blocks. A task
waiting only on a decision can still start provisionally under Ready.
Publish only when the user asks. Follow publish. Otherwise return
the list.
Parallelism test
Two tasks can run together when all of these hold:
- Each can finish and be checked against fixed inputs.
- Neither waits on, interprets, or revises around the other's decisions.
- Writes, accounts, fixtures, ports, and devices are independent or explicitly coordinated.
- One owner is responsible for integration.
Separate files or worktrees alone don't prove independence.
Ready
A task is ready when its blockers have delivered what it needs, its inputs exist, including any
user approval, its proof can show the result, and it passes the parallelism test against the tasks
running beside it. An empty "Blocked by" alone doesn't make a task ready.
Provisional start: when an open decision is a task's only missing input and the recommended
option is reversible, the task is ready to build on that option as a stated assumption. Name the
assumption and the decision under Inputs. Its acceptance and landing wait for the answer, and
destructive or outward-facing steps still wait for the user. Tasks that don't depend on the
decision never wait on it.
1---2name: to-tasks3description: Use when a spec, plan, or list of work needs splitting into tasks that can run in parallel, or when asked to create or publish tickets for it.4metadata:5 source: https://skillmd.com/skills/sreejithraman/to-tasks6---78# To Tasks910Split work into tasks that can run side by side. Start from a spec, a plan, an issue, or the11conversation. Leave a task list an owner can start from. You are done when every outcome in the12input belongs to a task, each task delivers one result, and every pair that runs together passes13the [parallelism test](#parallelism-test).1415This skill plans. Whoever called it starts the tasks and owns integration.16171. **Read the input.** Read a linked spec or issue in full, with its comments. Read enough of the18 code to test each pair. Use the project's glossary terms, and respect ADRs in the area. Nothing19 the input puts out of scope becomes a task.20212. **Settle shared contracts first.** Find what several tasks would have to agree on, such as a22 schema, an interface, or a name. Take it from the input, or make settling it the first task.23 Each settled contract unlocks more parallel work. A decision only the user can make goes under24 Inputs, as step 5 says.25263. **Cut the tasks.** Each task cuts a narrow, complete path through every layer, such as schema,27 API, UI, and tests, not a slice of one layer. It delivers one result you can check on its own.28 Split a task that delivers two. Size tasks by that result and the parallelism test, never by29 context. Put prefactoring first, when it makes the rest easier. A contract or prefactoring task30 delivers what it unlocks. Make a destructive or outward-facing action its own task, apart from31 the work that builds it. One mechanical change that breaks many call sites at once can't be cut32 this way: follow [wide refactors](references/wide-refactors.md).33344. **Test every pair.** Apply the [parallelism test](#parallelism-test) to each pair that could run35 together. When a pair fails, add a blocking edge if one needs the other's output or decision,36 note how they share a resource under Inputs, or merge them.37385. **Write the list.** Give each task these fields:3940 ```text41 1. Title42 Outcome: what works when it's done, from the user's side, not a list of layers43 Proof: how to check that it works44 Inputs: what it needs but won't build, including any user approval or answer, or None45 Blocked by: tasks that must deliver first, or None46 Finish line: land it, or stop for the user47 ```4849 Use the caller's finish line. Without one, land work that is settled and reversible, and stop50 the rest. **Settled** means the user knows what they want, or checks can judge it.5152 Whatever the finish line, a task needs the user before it starts when its outcome is unclear,53 it's destructive, outward-facing, or hard to undo, or the split around it needs their judgment.54 Name the one approval or answer under Inputs on every task it affects, and return it in the55 list. That approval covers the whole task. Such a task holds up only what it blocks. A task56 waiting only on a decision can still start provisionally under [Ready](#ready).57586. **Publish only when the user asks.** Follow [publish](references/publish.md). Otherwise return59 the list.6061## Parallelism test6263Two tasks can run together when all of these hold:6465- Each can finish and be checked against fixed inputs.66- Neither waits on, interprets, or revises around the other's decisions.67- Writes, accounts, fixtures, ports, and devices are independent or explicitly coordinated.68- One owner is responsible for integration.6970Separate files or worktrees alone don't prove independence.7172## Ready7374A task is ready when its blockers have delivered what it needs, its inputs exist, including any75user approval, its proof can show the result, and it passes the parallelism test against the tasks76running beside it. An empty "Blocked by" alone doesn't make a task ready.7778**Provisional start:** when an open decision is a task's only missing input and the recommended79option is reversible, the task is ready to build on that option as a stated assumption. Name the80assumption and the decision under Inputs. Its acceptance and landing wait for the answer, and81destructive or outward-facing steps still wait for the user. Tasks that don't depend on the82decision never wait on it.