Results for “risk-elimination”
15 skillsMore results
risk-matrix
Identify and prioritize risks by impact and controllability. Use for risk management, project planning, and strategic decision support.
1 · bundle
risk-assessment
Use when evaluating potential risks before making decisions, starting initiatives, or implementing changes. This skill provides a structured risk assessment framework for identifying, analyzing, and responding to risks across all domains.
0
risk-metrics-calculation
Calculate portfolio risk metrics including VaR, CVaR, Sharpe, Sortino, and drawdown analysis. Use when measuring portfolio risk, implementing risk limits, or building risk monitoring systems.
6
pre-mortem-technique
在启动高风险项目或重要决策前,需要预先识别潜在失败点以增强心理韧性和方案鲁棒性时
11 · bundle
assumption-risk-ledger
Map product assumptions by risk, confidence, evidence, and next validation step.
0
mixup-beyond-empirical-risk-minimization-arxiv-1710-09412v2
Mixup: Beyond Empirical Risk Minimization
6
hunting-for-living-off-the-land-binaries
Proactively hunt for adversary abuse of legitimate system binaries (LOLBins) to execute malicious payloads while evading detection.
24.6k · bundle
building-role-mining-for-rbac-optimization
Apply bottom-up and top-down role mining techniques to discover optimal RBAC roles from existing user-permission assignments, reducing role explosion and enforcing least privilege.
24.6k · bundle
omen
Enumerating failure modes via pre-mortem analysis. Systematically identifies failure scenarios for plans, designs, and features, scoring them with RPN/AP. Does not write code.
65 · bundle
csm-churn-save
Run a structured churn-save play for an at-risk account to diagnose root cause and reverse the decision.
0
conducting-malware-incident-response
Responds to malware infections across enterprise endpoints by identifying the malware family, determining infection vectors, assessing spread, and executing eradication procedures.
24.6k · bundle
pre-mortem-analysis
在启动一个重要项目或关键行动之前,用于主动识别和防范风险
11 · bundle
ata-rai-decision
ATA RAI Remnant Ablation / Adjuvant Therapy Decision Tool
10
risk-management
风险管理核心skill套件 — CVaR实时风控、动态仓位管理(风控版)。对标Bridgewater全天候策略、PIMCO风控体系的工程化实现。
1 · bundle